Permit Authority

City permits apply within City of Solvang limits.

Department
Building Division, Community Development Department
Address
1644 Oak Street, Solvang, CA 93463
Phone
(805) 688-5575

Online Permit Portal

Platform:Account required: No • Submission: In-person only

Additional resources:

Application Process

  1. Find the correct checklist from the City's Building Permit Application Checklists.
  2. Prepare a complete packet in PDF format with all required forms, plans, and supporting documentation.
  3. Email the packet to buildingdept@cityofsolvang.com.
  4. Wait for the City completeness check and plan review.
  5. Address comments from Planning, Public Works, Fire, or other reviewers as needed and resubmit revised PDFs.
  6. Pay fees and obtain permit issuance before starting work.
  7. Schedule required inspections and maintain permit compliance.

Typical processing time: Timelines vary by project scope and completeness. Planning applications receive a completeness determination within 30 days, and incomplete notices pause processing.

Source: Building Division, Community Development Department

General Requirements

Required for building, enlarging, altering, repairing, moving, demolishing, changing use, or installing or changing building systems unless specifically exempt.

Required Documents

  • Checklist-specific required materials
  • Electronic submittals in separate labeled PDFs
  • Title report or equivalent where required
  • City forms and checklist compliance documents
Permit validity
Permit is null and void if work has not started within 365 days of issuance or if work is suspended or abandoned for 180 days after an inspection.
Building code
City building code framework referencing California Building Code and California Residential Code through Solvang amendments
Owner-builder
Owner-builders may obtain permits, and additional verification can apply under the City's owner authorization procedures.
Contractor requirements
Contractor must hold the proper California license and a current City of Solvang Business Certificate.

Fees

Minimum permit fee
$98 permit processing line item is listed in the master fee schedule; total permit cost remains project-type specific.
Plan check fee
Included in the permit framework, with additional hourly plan review billing possible beyond the included review.
Permit fee formula
Size or occupancy-based base tables plus valuation or per-100-square-foot increments and fixed processing and records or technology surcharges.
Reinspection fee
$98 for third and later reinspections; $98 missed inspection fee.
Payment note
Required fees and deposits must be paid for processing to proceed.

Fees change. Verify current amounts at the official fee schedule.

Work That Does NOT Require a Permit

  • One-story detached accessory structures 120 square feet or less with no mechanical, electrical, or plumbing, maximum 12 feet high, with no more than two structures in this exemption category
  • Fences 6 feet high or less
  • Retaining and non-retaining walls 4 feet or less, with stated exceptions
  • Sidewalks and driveways within the stated elevation limits
  • Painting, papering, tiling, carpeting, and similar finish work
  • Certain prefabricated shallow above-ground pools and other minor accessory items
  • Window awnings in limited configurations
  • Non-fixed fixtures and partitions up to 5 feet 9 inches in certain contexts
  • Some limited low-impact grading configurations under the code appendix standards

Important: These are partial examples only. Exemptions do not authorize non-compliant work, and project-specific thresholds and code appendix conditions still apply.

Inspections

How to Schedule

  • (805) 688-5575 x237 (phone)
  • inspector@cityofsolvang.com (email)
Inspection hours
Permit issuance is by appointment.
Time windows
Inspections are scheduled for Tuesdays and Thursdays.

Typical inspection sequence: Inspection scheduling is project-driven. City code examples reference footing and foundation checks and lath or gypsum sequencing where required.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building Division, Community Development Department before applying.

Need help with your project?

Navigating permits in Solvang can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in Santa Barbara County

View all Santa Barbara County jurisdictions →