City Building Permits

Town of Woodside, CA Building Permit Guide

How to apply for a building permit in Town of Woodside, California. Permit authority, application steps, fees, and inspection requirements.

California San Mateo County Updated March 2026

Permit Authority

Town of Woodside, San Mateo County, California

Department
Town of Woodside Building Department
Address
2955 Woodside Road, Woodside, CA 94062
Phone
650-851-6796

Online Permit Portal

Platform: eTRAKiT (via Woodside CSQR portal) • Account required: Yes • Submission: Online or in-person

Application Process

  1. Confirm permit need early if uncertain (Town requires a permit for erecting, constructing, enlarging, altering, repairing, moving, demolishing, or changing occupancy of buildings/structures and electrical, gas, mechanical, or plumbing systems).
  2. Contact Planning at 650-851-6796 to confirm whether discretionary review is required.
  3. Prepare application, scope, plans, valuation, and required supporting documents.
  4. Email application package (PDF) to the Building Department (projectmanagers@woodsideca.gov) unless the project is one of the eTRAKiT-only permit types.
  5. Pay applicable fees/deposits at submission.
  6. Complete plan check review cycle (including any revisions requested), then permit issuance.
  7. Schedule and complete inspections in sequence before final sign-off.
  8. Processing-time estimate: not published for permit issuance in the Town pages; only inspection scheduling is explicit (72 hours advance notice, afternoons only).
  9. Source URL: https://www.woodsideca.gov/157/Building and https://www.woodsideca.gov/473/Apply-for-Permits-Online

Source: Town of Woodside Building Department

General Requirements

generally for new/altered/improved construction, repair, move, demolition, or occupancy changes.

Required Documents

  • Building permit application, complete scope, plans, valuation, and scope-appropriate supporting docs (e.g., fire-safe checklist, structural/engineering data, soils reports, owner/contractor info, and department-specific documents).
Permit validity
New work must have an inspection within one year of scheduling; no permit activity for one year requires a new permit (permit fees non-refundable after 365 days if issued). Inactivity/refund details are in the fee schedule.
Building code
California Building Code and Woodside Municipal Code.
Owner-builder
Town provides an Owner-Builder declaration path; it warns owner-builders they may be held liable if they submit a permit as owner without proper licensed oversight and that contractor license/bonding requirements generally apply.
Contractor requirements
Finalization is tied to license confirmation; no person may transact business without a Town business license, and finalization requires all licenses confirmed for subcontractors (Town Municipal Code reference via town page).

Fees

Minimum permit fee
$155 (Permit Processing Fee / Minimum Permit Fee)
Plan check fee
see above (plan review percentage + hourly follow-on for additional review/revisions).
Permit fee formula
mixed model: - Building permit fee uses valuation-based and flat components (varies by permit type). - Plan check is charged as a percentage of building permit fee: 20% counter review, 85% residential, 100% commercial. - Additional plan review, engineering, planning review and revisions billed hourly; first three plan reviews included in base fee note.
Reinspection fee
Re-inspection fee $155 (after first re-inspection); Missed inspection $155.
Payment note
- Fees are due when submitting the permit application (cash/check is explicitly noted for in-person submittals). - Fees must be paid before review/permit processing of many permit types. - Permit extensions/reactivations/reissuance and special deposit-based fees also apply as listed in the fee schedule.

Fees change. Verify current amounts at the official fee schedule.

Work That Does NOT Require a Permit

  • Detached accessory structures of 120 sq ft or less may avoid a building permit if no plumbing, electrical, or mechanical equipment is proposed, but still require a Planning Permit.

Inspections

How to Schedule

Scheduling deadline
call 650-851-6796 or email for Building; schedule 72 hours in advance; afternoons only (1:00–4:30 PM).
Time windows
Building inspections generally limited to afternoon windows; Town says it conducts first-come, first-serve and only a limited number per day.

Typical inspection sequence: plan check approvals -> Building final inspection after other required departments clear their finals (Planning, Geology, Public Works, Woodside Fire, Health, etc. as applicable).

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Town of Woodside Building Department before applying.

Need help with your project?

Navigating permits in Town of Woodside can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in San Mateo County

View all San Mateo County jurisdictions →