City Building Permits

East Palo Alto, CA Building Permit Guide

How to apply for a building permit in East Palo Alto, California. Permit authority, application steps, fees, and inspection requirements.

California San Mateo County Updated March 2026

Permit Authority

City of East Palo Alto building permit authority for properties within the City; separate Planning/Engineering departments may have additional approvals (e.g., right-of-way, zoning, design review), with San Francisco' No�within East Palo Alto city jurisdiction only.

Department
Building Services Division (City of East Palo Alto) and Permit Center / Community & Economic Development Department
Address
1960 Tate Street, East Palo Alto, CA 94303
Phone
650-853-3189 (Building); 650-853-3100 (City general)

Online Permit Portal

Platform: Email-based intake; no dedicated public permit portal listed on Building Services page • Account required: No • Submission: Online or in-person

Application Process

  1. Complete required application form(s) and supporting documents (e.g., Building Permit Application, site plan, related reports) and submit to building@cityofepa.org for processing.
  2. Staff reviews and contacts applicant within 2 business days with next steps.
  3. Formal plan-review submission begins: plans routed to reviewing divisions/consultants; initial reviews (City references 30-day review period).
  4. Applicant responds to comments and resubmits as needed (rechecks/rounds).
  5. Once all approvals are received and required plan corrections are made, a permit is issued.

Typical processing time: 30-day review period noted for formal submittals; two-week rechecks for resubmittals if needed; initial fees cover three (3) plan reviews.

Source: Building Services Division (City of East Palo Alto) and Permit Center / Community & Economic Development Department

General Requirements

New buildings, additions, new construction, garage conversions, and legalization of existing structures require planning review before building permit issuance; ADUs require zoning clearance before building submission (Planning FAQ). Planning says many tenant-improvements/remodels/re-roof projects generally do not need planning review unless adding square footage/facade changes.

Required Documents

  • Building Permit Application (building_permit_application.pdf), digital plan set/PDF requirements, supporting documentation, and signatures/declarations (owner-builder or licensed contractor). Construction documents should follow digital submittal checklist.
Permit validity
Development Code indicates permits/approvals are expected to be exercised within 24 months of approval unless otherwise specified; any construction pause of 120+ days can cause expiration. Continuation/extension requests must be filed at least 30 days prior to expiration with applicable fee.
Building code
2025 California Building Codes are linked as applicable; permit forms reference 2022 CBC and 2022 California Residential Code section 105.2 for some exempt-work definitions.
Owner-builder
Owner-builder declaration option exists; if owner does the work, the declaration of exemption is required under CBC 105.2/Code 2025 references. Owner-builder cannot employ others except own employees with wages-only compensation for license-law exemption claims.
Contractor requirements
City requires license declaration; contractors must be licensed under California Contractors State License Law or provide legal exemption. City warns unlicensed work may trigger penalties and report to CSLB.

Fees

Minimum permit fee
not a single flat "minimum" for all classes; examples shown include Building Plan Check base fee $246.45 (single-family up to $5,000), and Building Permit/Inspection base fee $796.45 (single-family up to $5,000).
Plan check fee
included in fee schedule as separate Building Plan Check tables by project type and valuation.
Reinspection fee
Additional fees may apply for extra plan checks, deferred submittals, and supplemental inspection fees; additional fee also applies for projects needing more than average inspections.
Payment note
City staff indicate check/cash/money order accepted; no credit/debit cards. Planning and building pages emphasize payment by check made out to �City of East Palo Alto� for submitted applications.

Fees change. Verify current amounts at the official fee schedule.

Work That Does NOT Require a Permit

Important: City notes exempt items may still need Planning, Engineering, or other agency review; emergency repairs still need permit application submitted within next business day for code-required scenarios.

Inspections

How to Schedule

Time windows
Building permit counter Mondays/Tues/Thurs, 9:00am-11:45am and 1:00pm-3:45pm (lunch 12-1); permit center windows also include virtual/appointment days Wed/Fri. Inspections requested by phone for available weekdays as posted on handout.

Typical inspection sequence: request inspection type (permit must have job card and approved plans onsite), then staging inspections (rough/system, framing, under-slab, slab, foundation, electrical/plumbing/mechanical, windows/insulation, final inspection). Final inspection required before occupancy; utility release may wait until final approval.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building Services Division (City of East Palo Alto) and Permit Center / Community & Economic Development Department before applying.

Need help with your project?

Navigating permits in East Palo Alto can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in San Mateo County

View all San Mateo County jurisdictions →