Lemoore, CA Building Permit Guide
How to apply for a building permit in Lemoore, California. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
Handles building permits within the incorporated City of Lemoore. Work outside city limits is generally handled by Kings County; some city projects also require outside-agency clearance such as Kings County Health Department clearance or San Joaquin Valley Air Pollution Control District demolition release when applicable.
- Department
- City of Lemoore Community Development Department, Building Division
- Address
- 711 W Cinnamon Drive, Lemoore, CA 93245
- Phone
- (559) 924-6744 ext. 730
Online Permit Portal
Platform: Tyler EnerGov Self Service • Account required: Yes • Submission: Online only
Additional resources:
Application Process
- Confirm the project with the Building Division before starting work; the city states approvals are needed for new structures and also common projects such as patios, storage buildings, carports, HVAC replacements, and reroofing.
- Create or log into the EnerGov portal and start the permit application online.
- Upload the required application materials. The city's plan-check sheet says plan submittals are electronic in PDF form and require a completed permit application, project valuation, and plans or calculations appropriate to the project scope.
- Provide any specialty documents that apply, such as Title 24 documentation, truss engineering, grading plans, demolition release from the San Joaquin Valley Air Pollution Control District, or Kings County Health Department clearance.
- If applying as an owner-builder, return the owner-builder verification; the city's form says the permit will not be issued until that verification is returned.
- Pay the applicable permit and plan-check fees. For project-specific permits, the current fee schedule states a $75 prepayment is required with application.
- After permit issuance, schedule inspections through the portal or by email at permits@lemoore.com for portal-issued permits. Requests received by 4:30 p.m. are scheduled for the following business day.
- Complete required inspections and obtain final approval.
Source: City of Lemoore Community Development Department, Building Division
General Requirements
The city says approvals are required for new structures and for installation or replacement of items including patios, storage buildings, carports, air-conditioning replacements, and reroofing. Most construction requiring plan review must be submitted electronically.
Required Documents
- Completed City Building Permit Application
- Project valuation
- Scaled plans
- Structural calculations as applicable
- Title 24 calculations as applicable
- Truss engineering as applicable
- Grading plans as applicable
- Fire sprinkler plans as applicable
- Soils report or compaction tests as applicable
- Landscape plans as applicable
- Demolition permit release as applicable
- Kings County Health Department clearance as applicable
- Building code
- City Council adopted the 2022 California Building Standards Code effective January 1, 2023. The Building Division page says the city is working under the 2022 California Building, Plumbing, Mechanical, and National Electrical Code, with 2025 code updates effective January 1, 2025.
- Owner-builder
- Lemoore uses an owner-builder verification form. The city warns that the owner-builder is the responsible party of record and states the permit will not be issued until the verification is returned.
- Contractor requirements
- The city's owner-builder notice states contractors must be licensed and bonded, must have a city and or county business license, and must place their license number on permit applications.
Fees
- Minimum permit fee
- $140 minimum for residential remodels and additions; $1,300 minimum for certain new multifamily, commercial, industrial, and warehouse building permit categories listed in the schedule; project-specific permits vary by type.
- Plan check fee
- 65% of building permit fee.
- Permit fee formula
- Mixed structure. General building permits are largely square-foot-based; project-specific permits are flat-fee; plumbing, electrical, and mechanical permits use issuance fees plus unit-fee schedules.
- Reinspection fee
- $161.71 proposed in the current fee schedule PDF
- Penalty (no permit)
- Work done without required permitting is listed as permit fees doubled.
- Payment note
- Project-specific permits require a $75 prepayment with application. The fee schedule also lists additional plan review fees, after-hours inspection fees, and actual-cost charges for outside consultants where used.
Fees change. Verify current amounts at the official fee schedule.
Work That Does NOT Require a Permit
Contact the City of Lemoore Community Development Department, Building Division to confirm whether your project requires a permit before starting work.
Inspections
How to Schedule
- Tyler EnerGov Self Service (online)
- permits@lemoore.com (email)
- (559) 924-6744 ext. 732 (phone)
- Scheduling deadline
- Requests must be received by 4:30 p.m. for the following business day.
- Inspection hours
- Building inspection services Monday through Friday, 9:00 a.m. to 4:30 p.m.
Typical inspection sequence: Varies by permit scope. City inspection activity reports show common inspection milestones including foundation, rough electrical, rough frame, rough mechanical, rough plumbing, roof nailing, shear wall, insulation, smoke or carbon monoxide, and final inspection.
Additional Resources
- Building code: City Council adopted the 2022 California Building Standards Code effective January 1, 2023. The Building Division page says the city is working under the 2022 California Building, Plumbing, Mechanical, and National Electrical Code, with 2025 code updates effective January 1, 2025.
- Zoning information: View zoning info
- Owner-builder rules: View rules
- Community Development
- Plan-check submittal requirements
- Fee schedule
- Public works standards
- California Building Standards Commission
- License lookup guide: California Contractor License Requirements
- Contract template: California Homeowner-Contractor Agreement
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the City of Lemoore Community Development Department, Building Division before applying.
Need help with your project?
Navigating permits in Lemoore can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Kings County
View all Kings County jurisdictions →