City Building Permits
Martinez, CA Building Permit Guide
How to apply for a building permit in Martinez, California. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
Applies within Martinez city limits. Work in unincorporated Contra Costa County is handled by Contra Costa County, not the City of Martinez.
- Department
- City of Martinez Building Division / Permit Center
- Address
- 525 Henrietta Street, Martinez, CA 94553
- Phone
- (925) 372-3515
Online Permit Portal
Platform: Accela Citizen Access • Account required: Yes • Submission: Online or in-person
Application Process
- Confirm whether your project is one of the limited permit types Martinez accepts online: residential mechanical permits for AC/furnace/HVAC replacement, residential electrical service panel replacement or upgrade not exceeding 200A, water heater replacement, re-roof permits, and eligible solar through SolarAPP+. All other building permit types should be submitted in person at City Hall.
- Prepare the application package. Martinez publishes project-specific handouts and checklists; for larger residential projects the city requires drawings such as plot/site plans, architectural, structural, mechanical, electrical, and plumbing plans, plus supporting items such as structural calculations, Title 24 energy forms, soils reports where applicable, and sanitary district approval stamps where required.
- Submit the permit application online through Accela if the project type is eligible, or submit it over the counter during permit hours at City Hall. The city states that plan check and permit fees are determined at intake/submittal.
- Pay applicable fees, including permit, plan review, Title 24 plan-check add-ons where applicable, the California Building Standards Commission fee, and the city technology fee.
- If applicable, complete outside-agency or related compliance steps. Martinez materials indicate some projects also need sanitary district review, planning/engineering coordination, or C&D waste compliance through Green Halo.
- After issuance, post and keep the permit available on site, complete work, and call the Building Inspection Request Recorder at (925) 372-3596 by 4:00 p.m. the prior business day to schedule inspections.
- Obtain final inspection approval before occupancy or project closeout.
Typical processing time: Martinez does not publish a single citywide review timeline for all building permits. For SolarAPP+ permits, the city says qualifying residential solar permits are processed within 72 hours, generally less than 24 hours. A city-published solar checklist also says best efforts are made to review complete residential solar applications within 1 business day and commercial/non-single-family solar applications within 10 business days.
General Requirements
Martinez requires building permits for construction projects in the city and states the Building Division issues permits to homeowners and licensed contractors to regulate construction within city limits. The city currently accepts only a limited set of residential permit types online; all other building permit types are submitted in person.
- Permit validity
- Martinez now relies on the adopted California codes for permit administration. California Building Standards Commission materials explain permit expiration changed from 180 days to 12 months under state law, with written extensions available unless work is abandoned.
- Building code
- Effective January 1, 2026, Martinez adopted the 2025 California Building Standards Code by reference, including the 2025 California Building Code, Residential Code, Electrical Code, Mechanical Code, Plumbing Code, Energy Code, Wildland-Urban Interface Code, Fire Code, Existing Building Code, and CalGreen.
- Owner-builder
- Martinez accepts owner-submitted permits and publishes owner forms, including "Authorization to Act as Agent for the Property Owner" and "Owners Acknowledgement and Verification of Information." Owner-builders should confirm project-specific obligations directly with the Building Division before submittal.
- Contractor requirements
- The city states building permits are issued to homeowners and licensed contractors. Martinez also requires a City business license for contractors doing work in the city.
Fees
- Minimum permit fee
- General building permit valuation fee starts at $114 for project valuation of $1 to $1,500, effective July 1, 2025. Separate flat fees apply to many specific permit types.
- Plan check fee
- General building plan review is 38% of the building permit fee. Energy-calculation plan check is an additional 25% of the plan review fee.
- Permit fee formula
- Mixed. General building permits are valuation-based; many reroof, plumbing, electrical, mechanical, demolition, and other trade permits use flat or unit-based fees.
- Reinspection fee
- Construction re-inspection is billed hourly at $182/hour effective July 1, 2025. After-hours inspection is $362 minimum for 2 hours. Additional plan review for building permits is $238/hour, and revisions to building permits are $190/hour. The fee schedule also includes a California Building Standards Commission surcharge and other project-specific fees.
- Payment note
- Effective July 1, 2025, the city charges a 3% fee on credit card transactions. The building fee schedule also adds a $65 technology fee per permit or project application effective July 1, 2025.
Fees change. Verify current amounts at the official fee schedule.
Work That Does NOT Require a Permit
- Martinez repealed its prior local "Exempted Work" amendment when adopting the 2025 code package, so exempt work now follows the California Building/Residential Code rather than a Martinez-specific amended list.
- Martinez's current published fee schedule expressly states that building permits are not required for fences less than 7 feet tall.
- Even where a building permit is not required, zoning, historic, floodplain, fire, utility, or other agency approvals may still apply.
- Because Martinez no longer publishes a separate local exempt-work list in the municipal code excerpt reviewed, applicants should confirm any claimed exemption with the Building Division before starting work.
Inspections
How to Schedule
- (925) 372-3596 (phone)
- Scheduling deadline
- the day before the requested inspection.
- Inspection hours
- Requests must be called in no later than 4:00 p.m. the day before the requested inspection. Applicants may request morning or afternoon preference, but the city does not guarantee the requested window.
- Time windows
- Requests must be called in no later than 4:00 p.m. the day before the requested inspection. Applicants may request morning or afternoon preference, but the city does not guarantee the requested window.
Typical inspection sequence: Martinez does not publish a single universal sequence on the main permit page. The sequence depends on scope, but applicants should expect inspections at the major construction stages applicable to the permit before final approval. Reinspection note: The fee schedule lists construction re-inspection as an hourly charge.
Additional Resources
- Building code: Effective January 1, 2026, Martinez adopted the 2025 California Building Standards Code by reference, including the 2025 California Building Code, Residential Code, Electrical Code, Mechanical Code, Plumbing Code, Energy Code, Wildland-Urban Interface Code, Fire Code, Existing Building Code, and CalGreen.
- Zoning information: View zoning info
- License lookup guide: California Contractor License Requirements
- Contract template: California Homeowner-Contractor Agreement
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the City of Martinez Building Division / Permit Center before applying.
Need help with your project?
Navigating permits in Martinez can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.