Free Template

Oregon Homeowner-Contractor Agreement

A plain-language contract template built around Oregon contractor law — CCB license verification, written contract requirements, lien protections, and the 3-day right to cancel.

Oregon ORS Ch. 701 v1.0 — March 2026

Instructions — not part of the agreement

How to Use This Template

This template was built by jaspector.com to help Oregon homeowners protect themselves when hiring a contractor. It covers the key provisions relevant to Oregon law, including CCB license verification, written contract requirements, and mechanics' lien protections.

Before You Start

  1. Verify the contractor's registration. Verify the contractor's credentials at www.oregon.gov. See our Oregon license lookup guide for step-by-step help.
  2. Download and print this document. Fill in all blank fields — do not leave any section empty.
  3. Review each Oregon callout. These notes highlight state-specific legal protections. Read them carefully — they explain your rights as a homeowner.
  4. Both parties sign. You and the contractor each get a signed copy before any work starts.
  5. Consult an attorney. This template is a starting point. For large projects or complex scopes, have a Oregon-licensed attorney review the agreement.

Field-by-Field Guide

  • Section 1 (Parties): Fill in legal names exactly as they appear on official documents. Include the contractor's ccb license number.
  • Section 2 (Scope): Be as specific as possible. "Kitchen remodel" is not enough — list materials, dimensions, finishes, and what is excluded.
  • Section 3 (Payment): Oregon does not impose a statutory cap on down payments. Limit the down payment to no more than 1/3 of the contract price. Tie every payment to a completed milestone, not a calendar date.
  • Section 4 (Timeline): Get start and completion dates in writing. Fill in the delay penalties — these protect you if the contractor falls behind.
  • Section 7 (Warranties): Fill in the warranty period. One year is common; negotiate for more on major work.
  • Section 14 (Exhibits): Attach all plans, specs, and the contractor's DLI registration printout. Check each box for what you are including.

About Jaspector

Jaspector is an AI-powered property advisory service that helps homeowners navigate construction projects, verify contractors, and resolve disputes. If a dispute arises during your project, we can help you document the issue and build a resolution strategy.

Learn more at jaspector.com — or email hi@jaspector.com to get started.

The instructions above are provided by jaspector.com as an educational resource. They are not part of the agreement, do not constitute legal advice, and do not create an attorney-client or endorsement relationship.

Before You Begin: This template helps you understand what a strong Oregon contractor agreement looks like. It is an educational starting point provided by jaspector.com — not a finished contract, and not legal advice. Oregon law imposes specific requirements on home improvement contracts and requires CCB licensing for work over $2,000. Local jurisdictions may impose additional requirements. Have this document reviewed by a Oregon-licensed attorney before use. Use of this template does not create an attorney-client relationship, and jaspector.com assumes no liability for any outcomes arising from its use.
1.

Parties

Homeowner (Property Owner)

Name(s)
Property Address
Mailing Address
Phone
Email

Contractor

Business Name
CCB License #
Qualifying Individual
Business Address
Phone
Email
Workers' Comp Policy #
General Liability Policy #
Oregon Requirement: Verify the contractor's CCB license at oregon.gov/ccb. A CCB license is required for residential work over $2,000. Verify the CCB license at oregon.gov/ccb. Confirm the license is active, the classification covers your project type, and the bond and workers' compensation status are current.
2.

Scope of Work

2.1 Project Description

Describe the work in specific, measurable detail. Include materials, methods, dimensions, and reference any plans, drawings, or specifications attached as exhibits.

2.2 Work NOT Included

Explicitly list work excluded from this contract to prevent scope disputes.

2.3 Permits and Inspections

  • Contractor is responsible for obtaining all required building permits
  • Contractor is responsible for scheduling all required inspections
  • Permit costs are: Included in contract price / Billed separately at cost
Oregon Note: The contractor, not the homeowner, should pull permits for licensed work. If a contractor asks the homeowner to pull the permit, that is a red flag.

2.4 Plans and Specifications

  • Attached as Exhibit A (architectural / engineering plans)
  • Attached as Exhibit B (material specifications)
  • No formal plans — scope defined by Section 2.1 above
3.

Contract Price and Payment Schedule

3.1 Total Contract Price

Total Contract Price$
Sales Tax (if applicable)$
Permit Fees (if separate)$
Total Amount Due$

3.2 Payment Schedule

Oregon Guidance: Oregon does not impose a statutory cap on down payments. Limit down payments to no more than one-third (1/3) of the total contract price. Tie all payments to completed milestones.
Payment Amount Trigger (Work Milestone)
Down Payment$ Upon signing (recommended: no more than 1/3)
Progress Payment 1$
Progress Payment 2$
Progress Payment 3$
Final Payment$ Completion and final inspection
Total$

3.3 Payment Terms

  • Payments are due within days of written invoice
  • Acceptable payment methods:
  • No payment shall be due for work not yet performed or materials not yet delivered to the job site
  • Final payment is due only after: (a) all work is complete, (b) final inspection is passed (if applicable), and (c) Homeowner has had reasonable opportunity to inspect
4.

Project Timeline

Estimated Start Date
Estimated Completion Date

4.1 Delays

  • Contractor shall notify Homeowner in writing within 48 hours of any event that may delay the project
  • Excusable delays include: weather, permit delays, material shortages, acts of God, government orders
  • Non-excusable delays exceeding business days entitle Homeowner to a daily credit of $
  • If the project is not substantially complete within days of the estimated completion date (excluding excusable delays), Homeowner may terminate under Section 9
5.

Change Orders

Any changes to the scope, price, or timeline of this contract must be documented in a written Change Order signed by both parties before the changed work begins.

Each Change Order shall include:

  1. Description of the changed work
  2. Addition to or deduction from the contract price
  3. Impact on the project timeline
  4. Signature of both Homeowner and Contractor

No verbal agreements will modify this contract.

6.

Materials and Workmanship

6.1 Materials

  • All materials shall be new unless otherwise specified in writing
  • Substitutions require prior written approval from Homeowner
  • Contractor warrants that all materials comply with applicable building codes

6.2 Workmanship Standards

  • All work shall be performed in a professional, workmanlike manner
  • All work shall comply with applicable Oregon building codes and local ordinances
  • All work shall conform to the plans, specifications, and scope described in this contract
  • Contractor shall maintain a clean and safe job site

6.3 Subcontractors

  • Contractor use subcontractors (will / will not)
  • If subcontractors are used, Contractor remains fully responsible for their work, licensing, and insurance
  • All subcontractors performing work requiring a CCB license must hold a valid, active license
  • Homeowner may request CCB license numbers for any subcontractor working on the project
7.

Warranties

7.1 Contractor Warranty

Contractor warrants all labor and workmanship for a period of year(s) from the date of completion. During this period, Contractor shall repair or correct, at Contractor's expense, any defects in workmanship or materials furnished by Contractor.

7.2 Manufacturer Warranties

Contractor shall provide Homeowner with all manufacturer warranties for materials and equipment installed. Contractor shall ensure installations comply with manufacturer specifications to preserve warranty coverage.

7.3 Warranty Exclusions

  • Normal wear and tear
  • Damage caused by Homeowner negligence or misuse
  • Damage caused by third parties or acts of God
  • Items specifically excluded in writing
8.

Insurance and Bonding

8.1 Contractor Insurance Requirements

CoverageMinimum / Status
General Liability$
Workers' CompensationStatutory limits (required if Contractor has employees — ORS Ch. 656)
Automobile Liability$
  • Contractor shall provide certificates of insurance upon request
  • Homeowner shall be named as additional insured on the general liability policy
Oregon Requirement (ORS Chapter 701): Licensed contractors must maintain a surety bond with the CCB. Bond amounts vary by license type. Verify current bond status at oregon.gov/ccb .
9.

Termination

9.1 Homeowner's Right to Terminate

  • Homeowner may terminate this contract at any time by providing written notice
  • Homeowner shall pay for all work satisfactorily completed and materials delivered as of the termination date
  • Contractor shall provide an itemized accounting within 10 business days of termination
  • Contractor shall not charge a cancellation penalty exceeding actual costs reasonably incurred

9.2 Contractor's Right to Terminate

  • Homeowner fails to make a payment within days of written notice of default
  • Conditions at the job site make the work unsafe or illegal to continue
Oregon Law (ORS 83.710–83.750 — Home Solicitation Sales Act): If this contract was solicited at the Homeowner's residence and the contract was solicited at the Homeowner's residence or away from the Contractor's permanent place of business, the Homeowner has the right to cancel by midnight of the third business day after signing. The contractor must provide a written Notice of Cancellation form. Upon cancellation, the contractor must refund all payments within 10 business days. Failure to provide the cancellation notice extends the cancellation period indefinitely.
10.

Dispute Resolution

10.1 Informal Resolution

The parties agree to attempt informal resolution by written notice. The other party shall respond in writing within 15 business days.

10.2 Mediation

If informal resolution fails, the parties agree to submit the dispute to non-binding mediation before a mutually agreed mediator. Mediation costs shall be shared equally.

Oregon Resource: File a complaint with the Oregon CCB at oregon.gov/ccb. The CCB offers dispute resolution services.

10.3 Legal Action

If mediation fails, either party may pursue legal action in the county court of the county where the property is located. Oregon Small Claims Court handles claims up to $10,000. ORS 20.082 allows prevailing party attorney fees in construction contract actions. The prevailing party shall be entitled to recover reasonable attorney's fees and costs.

11.

Mechanics' Lien Notice

Oregon Law (ORS Chapter 87): Oregon allows mechanics' liens. A claim of lien must be filed within 75 days after the claimant's last day of providing labor or materials. Oregon has one of the shortest preliminary notice windows: 8 days from first furnishing (ORS 87.021).

11.1 Protecting Against Mechanics' Liens

  • Request lien waivers from the contractor and all subcontractors with each progress payment
  • Request a final unconditional lien waiver upon final payment
  • Require Contractor to provide a list of all subcontractors and material suppliers at the start of the project
  • Request proof that progress payments are being forwarded to subcontractors and suppliers
12.

Additional Oregon Requirements

12.1 CCB License Statement

Contractor represents and warrants that, as of the date of this contract, Contractor holds a valid, active license with the Oregon Construction Contractors Board (CCB) as required by ORS Chapter 701, with a classification covering the scope of work. All required bonds and insurance are in force.

12.2 Workers' Compensation

Oregon law (ORS Chapter 656) requires contractors with employees to carry workers' compensation insurance. Verify current CCB requirements before work begins.

13.

General Provisions

  • Entire Agreement: This contract, including all exhibits and change orders, constitutes the entire agreement. No prior verbal or written representations shall be binding unless incorporated herein.
  • Severability: If any provision is found unenforceable, the remaining provisions continue in full force.
  • Governing Law: This contract shall be governed by the laws of the State of Oregon.
  • Notice: All notices shall be in writing and delivered to the addresses in Section 1, by personal delivery, certified mail, or email with confirmed receipt.
  • Assignment: Neither party may assign this contract without prior written consent of the other party.
14.

Exhibits and Attachments

  • Exhibit A: Plans and Drawings
  • Exhibit B: Material Specifications
  • Exhibit C: Notice of Cancellation Form (if applicable)
  • Exhibit D: Contractor's CCB License Printout
  • Exhibit E: Certificates of Insurance
  • Additional:

Signatures

By signing below, both parties acknowledge that they have read, understand, and agree to all terms of this contract.

Homeowner

Signature

Printed Name
Date

Homeowner (if jointly owned)

Signature

Printed Name
Date

Contractor

Signature

Printed Name
Title
CCB License #
Date

Oregon Pre-Signing Checklist

Before signing, confirm each item:

  • Verified contractor's Verified contractor's CCB license is active at oregon.gov/ccb
  • License classification covers the project type
  • Bond status confirmed through CCB
  • Down payment limited to no more than 1/3 of contract price
  • Cancellation notice provided (if solicited at home)
  • All blank fields filled in — no blank spaces
  • Received a signed copy before work starts
  • Payment schedule tied to work milestones
  • Plans, specs, and material lists attached or described in detail

Next step

Verify your contractor's Oregon license

Look up CCB license status, classification, and bond before you sign.

Oregon License Lookup

This template was prepared by jaspector.com as an educational resource for Oregon homeowners.

It is not legal advice. Consult a Oregon-licensed attorney before executing any construction contract.

Template Version 1.0 — March 2026