City of Green River

How to apply for a building permit in City of Green River, Wyoming. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Green River Development Services -- Building Division

Street address
50 E 2nd North Street, Green River, WY 82935
Coverage
All construction within the incorporated city limits of Green River, the county seat of Sweetwater County. Projects outside city limits fall under Sweetwater County Land Use jurisdiction.
Online portal
MGO Connect (MyGovernmentOnline)
MyGovernmentOnline
§ 02

When a permit is required

Permit triggers and exempt work for Green River

A building permit is required if you erect, enlarge, alter, repair, move, improve, or convert a building or structure. This includes plumbing, electrical, and mechanical modifications.

Note: The city publishes a PDF titled 'what does not require a building permit' available at the Building Inspection page. A separate document covers commercial construction exemptions. Access directly at the building inspection page or contact the Building Division at (307) 872-6140.

Required documents
  • Building Permit Application
  • Site plan (showing property lines, setbacks, existing and proposed structures, utilities)
  • Floor plan
  • Foundation plan
  • Wall section
  • Roof plan
  • Elevations
  • Commercial Plan Review Application (for commercial projects)
Building code
Building codes are administered under Chapter 7 of the Green River Code of Ordinances. Green River enforces the adopted building codes per the Code of Ordinances. State-level adoption is IBC 2024, IMC 2024, IFC 2024, IEBC 2024, IFGC 2024 (effective June 26, 2024) and NFPA 70 (2023).
Permit validity
Not publicly stated. Contact (307) 872-6140.
Owner-builder
Not explicitly described in publicly available documents. Contact (307) 872-6140.
Contractor requirements
All contractors and subcontractors performing work in Green River must obtain a City of Green River contractor's license. This is a local requirement separate from Rock Springs. Contractors using their Green River residence as a business address must also obtain a Home Occupation Permit before the contractor license is issued.

Source: City of Green River Development Services -- Building Division ↗

§ 03

Application process

Typical processing: Processing time not publicly stated. Contact (307) 872-6140.

  1. 01
    Determine if a permit is required. The city provides a 'Work Requiring a Building Permit' PDF and a 'what does not require a building permit' PDF via the forms center.
  2. 02
    Download the Building Permit Application PDF from the forms center, or apply online via MGO Connect.
  3. 03
    Prepare all supporting documents: site plan showing setbacks and utilities, floor plan, foundation plan, wall section drawings, roof drawings, and elevations.
  4. 04
    Commercial projects require a Commercial Plan Review Application in addition to the standard building permit application.
  5. 05
    Submit completed application and all documents online via MGO Connect or in person at 50 E 2nd North Street.
  6. 06
    Pay applicable permit fees.
  7. 07
    Plans are reviewed by the Building Division. Corrections or approval are communicated.
  8. 08
    Permit is issued. Do not begin construction before permit issuance. Commencing work without a permit triggers an investigative fee.
  9. 09
    Schedule required inspections through the Building Division as construction progresses.
  10. 10
    Final inspection and certificate of occupancy issued upon completion.

Typical processing time: Processing time not publicly stated. Contact (307) 872-6140.

Source: City of Green River Development Services -- Building Division ↗

§ 04

Fee schedule

Green River building permit fees

Fee type
Amount
01
Plan check fee
Commercial Plan Review Application required; fee amount not publicly posted in current format.
02
Permit fee formula
Not confirmed in current accessible documents.
03
Reinspection fee
Investigative fee charged if work commences without a permit. Amount not publicly posted.

Payments can be made online via MGO Connect or in person at 50 E 2nd North Street.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • (307) 872-6140 (phone)
Inspection hours
Monday-Friday, 8:00 AM to 5:00 PM

Typical sequence: An inspection guide is published at the forms center. Standard sequence applies (footing/foundation, rough-in, framing, final). Inspections will not be performed unless appropriate permits have been obtained.

Source: City of Green River Development Services -- Building Division ↗

§ 06

Frequently asked

Common questions about Green River permits

01 Do I need a building permit in Green River, WY?
A building permit is required if you erect, enlarge, alter, repair, move, improve, or convert a building or structure. This includes plumbing, electrical, and mechanical modifications.
02 How much does a building permit cost in Green River, WY?
Building permit fees in Green River, WY are set by the local building department and vary by project type and valuation. Fees are calculated as: Not confirmed in current accessible documents.. Plan check fee: Commercial Plan Review Application required; fee amount not publicly posted in current format..
03 How do I apply for a building permit in Green River, WY?
To apply for a building permit in Green River, WY, follow these steps: 1. Determine if a permit is required. The city provides a 'Work Requiring a Building Permit' PDF and a 'what does not require a building permit' PDF via the forms center. 2. Download the Building Permit Application PDF from the forms center, or apply online via MGO Connect. 3. Prepare all supporting documents: site plan showing setbacks and utilities, floor plan, foundation plan, wall section drawings, roof drawings, and elevations. 4. Commercial projects require a Commercial Plan Review Application in addition to the standard building permit application. 5. Submit completed application and all documents online via MGO Connect or in person at 50 E 2nd North Street. 6. Pay applicable permit fees. 7. Plans are reviewed by the Building Division. Corrections or approval are communicated. 8. Permit is issued. Do not begin construction before permit issuance. Commencing work without a permit triggers an investigative fee. 9. Schedule required inspections through the Building Division as construction progresses. 10. Final inspection and certificate of occupancy issued upon completion.
04 How long does it take to get a building permit in Green River, WY?
Building permit processing times in Green River, WY typically run Processing time not publicly stated. Contact (307) 872-6140.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Green River, WY?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Green River, WY via: (307) 872-6140.
last verified April 2026 source City of Green River Development Services -- Building Division ↗ entry id permits/wyoming/sweetwater/green-river

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Green River Development Services -- Building Division before applying. Jaspector is not legal advice.