When a permit is required
Permit triggers and exempt work for Big Piney
New construction, additions, and significant alterations within Big Piney town limits. Confirm specific thresholds (accessory structure exemption, minor repair exemptions) with the Town Clerk.
Note: Confirm exemptions directly with the Town Clerk at (307) 276-3554
- Building permit application
- Site plan with lot dimensions and setbacks
- Construction drawings
- Owner and contractor information
- State electrical license information for electrical work
- Building code
- Confirm the currently adopted building code edition with the Town Clerk at (307) 276-3554. Wyoming State Electrical Code applies statewide to all electrical work. Wyoming State Fire Marshal oversight applies to commercial buildings statewide.
- Permit validity
- Confirm with the town.
- Contractor requirements
- No Wyoming state general contractor license. Electrical work requires a Wyoming-licensed electrician under the Wyoming State Electrical Code.
Application process
Typical processing: Not published; contact office at (307) 276-3554
- 01
Verify the project address is within the incorporated limits of the Town of Big Piney and not within adjacent Marbleton or unincorporated Sublette County.
- 02
Call (307) 276-3554 to determine the current application process, required documents, applicable fees, and required inspections.
- 03
Pick up the building permit application at Town Hall.
- 04
A dimensioned site plan showing lot, building, setbacks, and utilities is typically required. Structural drawings should address Big Piney's design conditions: design ground snow load approximately 40 to 60 psf at approximately 6,820 feet elevation; frost depth approximately 36 to 48 inches; high-wind design per ASCE 7. Confirm specific requirements with the town or a local structural engineer.
- 05
Deliver completed documents to Town Hall in person.
- 06
Town staff review for zoning and code compliance and issue the permit.
- 07
Schedule required inspections with the town (see Inspections section).
- 08
Obtain final inspection sign-off and any certificate of completion before occupying the structure.
Typical processing time: Not published; contact office at (307) 276-3554
Source: Town of Big Piney -- Town Clerk / Administrative Office ↗
Required inspections
Scheduling and sequence
- Contact the Town Clerk or Building Official at (307) 276-3554 to schedule inspections (phone)
- Scheduling deadline
- Confirm required inspection sequence, advance notice requirements, and current inspector arrangements
- Inspection hours
- Monday through Friday, approximately 8:00 am to 5:00 pm Mountain Time; confirm current hours by calling
Typical sequence: Typical required inspection sequence (confirm with town): 1) Footing inspection (before concrete pour; verify depth below frost line approximately 36 to 48 inches); 2) Foundation inspection (before backfill); 3) Framing inspection (after all rough framing complete, before insulation); 4) Rough MEP inspection (after rough mechanical, electrical, and plumbing installed); 5) Insulation inspection (before drywall installation); 6) Final inspection (after all work complete). A part-time building official or contract inspector is the most likely arrangement at Big Piney's population size.
Frequently asked
Common questions about Big Piney permits
01 Do I need a building permit in Big Piney, WY? ▸
02 How do I apply for a building permit in Big Piney, WY? ▸
03 How long does it take to get a building permit in Big Piney, WY? ▸
04 How do I schedule a building inspection in Big Piney, WY? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Big Piney -- Town Clerk / Administrative Office before applying. Jaspector is not legal advice.