How to apply for a building permit in Town of Cokeville, Wyoming. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
Very small incorporated town in the southern part of Lincoln County, approximately 20 miles south of Afton near the Utah state border (population approximately 500). Cokeville is largely an agricultural service community.
- Department
- Town of Cokeville -- Town Clerk/Administrator
- Address
- 130 Pine Street, Cokeville, WY 83114
- Phone
- (307) 279-3231
Application Process
- Call Cokeville Town Hall at (307) 279-3231 to confirm current permit requirements and obtain the appropriate application form
- Confirm staff availability before making an in-person trip given the very small office
- Prepare a basic site plan showing parcel boundaries, existing structures, proposed project footprint, setbacks from property lines, and well/septic locations if applicable
- Submit completed application with any required construction drawings and applicable fee to Town Hall
- Town staff review the application for basic compliance with any applicable local code and zoning ordinance
- Permit is issued; post on job site
- Schedule required inspections through Town Hall
- Final inspection and completion sign-off
Typical processing time: Not published; likely relatively fast for simple projects given low permit volume. Contact town hall.
General Requirements
New construction, additions, structural alterations
Required Documents
- Building permit application
- Site plan
- Construction drawings as applicable
- Building code
- Wyoming does not mandate a statewide residential code. Cokeville may or may not have adopted a local code by ordinance. Confirm current code adoption status with town hall before advising on code compliance requirements.
- Owner-builder
- No general contractor license required in Wyoming; owner-builders may generally pull their own permits
- Contractor requirements
- No general contractor license required at state level. Licensed contractors required for electrical work (state electrical license) and state-licensed plumbers for plumbing.
Work That Does NOT Require a Permit
- Agricultural exemptions may apply to qualifying farm structures
Important: Confirm with town hall; agricultural exemptions may only apply to structures outside the immediate town core
Inspections
How to Schedule
- ()
- Scheduling deadline
- Given the very small administrative capacity, plan ahead for inspection scheduling
Typical inspection sequence: Typical sequence: Foundation/footing (pre-pour), framing, rough mechanical and plumbing, final inspection. Cokeville may have limited local inspection capacity and may rely on the Lincoln County inspector or a contracted inspector.
State electrical inspections separate from town inspections; schedule with Wyoming Division of Labor Standards
Additional Resources
- Building code: Wyoming does not mandate a statewide residential code. Cokeville may or may not have adopted a local code by ordinance. Confirm current code adoption status with town hall before advising on code compliance requirements.
- Wyoming Electrical Board
- Wyoming State Plumbing Board
- License lookup guide: Wyoming Contractor License Requirements
- Contract template: Wyoming Homeowner-Contractor Agreement
- Wyoming hub: Wyoming Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Town of Cokeville -- Town Clerk/Administrator before applying.
Frequently Asked Questions
Town of Cokeville Building Permit FAQ
- Do I need a building permit in Town of Cokeville, WY?
- New construction, additions, structural alterations
- How do I apply for a building permit in Town of Cokeville, WY?
- 1. Call Cokeville Town Hall at (307) 279-3231 to confirm current permit requirements and obtain the appropriate application form 2. Confirm staff availability before making an in-person trip given the very small office 3. Prepare a basic site plan showing parcel boundaries, existing structures, proposed project footprint, setbacks from property lines, and well/septic locations if applicable 4. Submit completed application with any required construction drawings and applicable fee to Town Hall 5. Town staff review the application for basic compliance with any applicable local code and zoning ordinance 6. Permit is issued; post on job site 7. Schedule required inspections through Town Hall 8. Final inspection and completion sign-off
- How long does it take to get a building permit in Town of Cokeville, WY?
- Typical processing time is Not published; likely relatively fast for simple projects given low permit volume. Contact town hall..
- What work is exempt from building permits in Town of Cokeville, WY?
- The following work is generally exempt: Agricultural exemptions may apply to qualifying farm structures. Note: Confirm with town hall; agricultural exemptions may only apply to structures outside the immediate town core
- How do I schedule a building inspection in Town of Cokeville, WY?
- Inspections can be scheduled via: . Given the very small administrative capacity, plan ahead for inspection scheduling.
Need help with your project?
Navigating permits in Town of Cokeville can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Lincoln County
View all Lincoln County jurisdictions →