On this page 5
When a permit is required
Permit triggers and exempt work for Afton
New construction, additions, structural alterations, and manufactured home placement
- Exempt Agricultural exemptions may apply to qualifying agricultural structures on parcels at the town fringe or outside the core urban area
Note: Confirm with Afton Town Hall whether agricultural use exemptions apply within the incorporated limits
- Permit application
- Site plan
- Construction drawings
- Trade permits as applicable
- Building code
- Not confirmed from public sources. Wyoming's lack of mandatory statewide residential code means Afton may have adopted the IRC by ordinance or may operate under local construction standards. Confirm with town hall.
- Contractor requirements
- No general contractor license required at state level. All electrical work requires state electrical license; all plumbing requires state plumbing license.
Application process
Typical processing: Not published. Call for current workload estimate.
- 01 Contact Afton Town Hall at (307) 885-3106 to confirm current permit application process and obtain appropriate forms
- 02 Prepare a site plan showing parcel boundaries, setbacks, existing structures, and proposed project
- 03 Submit completed application, site plan, construction drawings, and fee to Town Hall
- 04 Town staff review for zoning compliance and applicable code standards
- 05 Permit issued; post on job site
- 06 Schedule inspections with Town Hall
- 07 Final inspection and completion/occupancy documentation
Typical processing time: Not published. Call for current workload estimate.
Required inspections
Scheduling and sequence
- Call Afton Town Hall at (307) 885-3106 to schedule (phone)
- Scheduling deadline
- Provide at least 24-48 hours advance notice. The town's inspection staff may be limited, and scheduling windows may not be available every day.
- Inspection hours
- Monday through Friday, 8:00 am to 5:00 pm
Typical sequence: Typical sequence for single-family residential: Foundation/footing (pre-pour), framing (after rough framing, before sheathing), rough-in mechanical and plumbing, rough electrical (state inspector only), insulation (if required), final building inspection
Rough electrical inspections are by state electrical inspector only, not a town inspection. State plumbing inspector if licensed plumbing contractor is not self-inspecting.
Frequently asked
Common questions about Afton permits
01 Do I need a building permit in Afton, WY? ▸
02 How do I apply for a building permit in Afton, WY? ▸
03 How long does it take to get a building permit in Afton, WY? ▸
04 What work is exempt from building permits in Afton, WY? ▸
05 How do I schedule a building inspection in Afton, WY? ▸