City of Sundance

How to apply for a building permit in City of Sundance, Wyoming. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 5
§ 01

Permit authority

City of Sundance -- Public Works Department

Street address
213 E Main St, Sundance, WY 82729 (mailing: P.O. Box 542, Sundance, WY 82729)
Coverage
Covers the incorporated city limits of Sundance. Does not cover unincorporated Crook County.
§ 02

When a permit is required

Permit triggers and exempt work for Sundance

Any time the square footage of an existing structure is changed (additions, conversions) or when new construction is built within city limits

Typical IRC residential exemptions (unconfirmed -- verify with city): Based on standard Wyoming municipal practice, minor work such as like-for-like repairs, painting, finish work, and small detached accessory structures under a threshold square footage are often exempt
  • Exempt Typical IRC residential exemptions (unconfirmed -- verify with city): Based on standard Wyoming municipal practice, minor work such as like-for-like repairs, painting, finish work, and small detached accessory structures under a threshold square footage are often exempt

Note: Confirm the specific exempt work list with City Hall at (307) 283-3451. The published permit trigger ('any time the square footage is changed') is narrower than a typical IRC Section 105 standard. Confirm with the city whether structural repairs, mechanical replacements, or interior remodels also require permits.

Required documents
  • Completed Building Permit Application
  • Site plan (may be prepared by owner, but must show accurate property boundaries and setbacks; City Engineer review is available)
Building code
Specific IBC/IRC edition not confirmed from publicly accessible sources during research. The City of Sundance maintains city ordinances at https://www.cityofsundancewy.com/city-ordinances; contact City Hall at (307) 283-3451 to confirm the currently adopted building code edition.
Owner-builder
Not specified in publicly available documents; contact City Hall at (307) 283-3451
Contractor requirements
No local contractor license requirement identified in available public sources for Sundance. Wyoming has no statewide general contractor license. Electrical work must be performed by a licensed electrician under Wyoming State Fire Marshal rules.
§ 03

Application process

Typical processing: Minimum two weeks to one month depending on timing of submission relative to meeting schedules

  1. 01
    Determine if your project requires a building permit. A permit is required whenever the square footage of an existing structure is changed (additions) and for all new construction.
  2. 02
    Develop a site plan showing the property boundaries, proposed structure location, and setback dimensions
  3. 03
    Review your site plan with the City Engineer prior to submitting (optional but recommended per the city's FAQ)
  4. 04
    Fill out the Building Permit Application (available at City Hall or via the city website forms page)
  5. 05
    Submit the completed application and site plan to City Hall at 213 E Main St during business hours (M-F 8 a.m. to 5 p.m.)
  6. 06
    The Land Use Planning Commission reviews your plan and application at its regular meeting (held the 4th Monday of each month). Applicants may attend to answer questions and receive feedback.
  7. 07
    After Planning Commission approval, the application proceeds to the City Council meeting (first Tuesday of each month) for final approval
  8. 08
    Permit is issued after City Council approval; post permit on the job site
  9. 09
    Schedule any required inspections with the Public Works Department during construction
  10. 10
    Final inspection; project close-out

Typical processing time: Minimum two weeks to one month depending on timing of submission relative to meeting schedules

Source: City of Sundance -- Public Works Department ↗

§ 04

Required inspections

Scheduling and sequence

How to schedule
  • Contact City Hall at (307) 283-3451 to schedule inspections with the Public Works Department (phone)
Inspection hours
M-F 8:00 a.m. to 5:00 p.m.

Typical sequence: Typical residential new construction typically includes foundation, framing, rough mechanical/electrical/plumbing, insulation, and final inspection. Electrical inspections are coordinated with the Wyoming State Fire Marshal's Electrical Safety section.

§ 05

Frequently asked

Common questions about Sundance permits

01 Do I need a building permit in Sundance, WY?
Any time the square footage of an existing structure is changed (additions, conversions) or when new construction is built within city limits
02 How do I apply for a building permit in Sundance, WY?
To apply for a building permit in Sundance, WY, follow these steps: 1. Determine if your project requires a building permit. A permit is required whenever the square footage of an existing structure is changed (additions) and for all new construction. 2. Develop a site plan showing the property boundaries, proposed structure location, and setback dimensions 3. Review your site plan with the City Engineer prior to submitting (optional but recommended per the city's FAQ) 4. Fill out the Building Permit Application (available at City Hall or via the city website forms page) 5. Submit the completed application and site plan to City Hall at 213 E Main St during business hours (M-F 8 a.m. to 5 p.m.) 6. The Land Use Planning Commission reviews your plan and application at its regular meeting (held the 4th Monday of each month). Applicants may attend to answer questions and receive feedback. 7. After Planning Commission approval, the application proceeds to the City Council meeting (first Tuesday of each month) for final approval 8. Permit is issued after City Council approval; post permit on the job site 9. Schedule any required inspections with the Public Works Department during construction 10. Final inspection; project close-out
03 How long does it take to get a building permit in Sundance, WY?
Building permit processing times in Sundance, WY typically run Minimum two weeks to one month depending on timing of submission relative to meeting schedules. Timelines can vary based on project complexity and current department workload.
04 What work is exempt from building permits in Sundance, WY?
Not all construction work requires a permit in Sundance, WY. The following work is generally exempt: Typical IRC residential exemptions (unconfirmed -- verify with city): Based on standard Wyoming municipal practice, minor work such as like-for-like repairs, painting, finish work, and small detached accessory structures under a threshold square footage are often exempt. Note: Confirm the specific exempt work list with City Hall at (307) 283-3451. The published permit trigger ('any time the square footage is changed') is narrower than a typical IRC Section 105 standard. Confirm with the city whether structural repairs, mechanical replacements, or interior remodels also require permits. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Sundance, WY?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Sundance, WY via: Contact City Hall at (307) 283-3451 to schedule inspections with the Public Works Department.
last verified April 2026 source City of Sundance -- Public Works Department ↗ entry id permits/wyoming/crook/sundance

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Sundance -- Public Works Department before applying. Jaspector is not legal advice.