When a permit is required
Permit triggers and exempt work for Basin
A permit is required for the erection, enlargement, alteration, or removal of any building within the Town of Basin, or any new structure or work that changes the exterior dimension of a structure.
- Exempt No published exemption list found. Small structures and minor repairs may be informally exempt; confirm with Town Hall.
Note: The town code references a separate permit requirement for digging (§ 9-2-7), which may apply to excavation or utility work in the right of way. Confirm scope with Town Hall.
- Completed Building Permit application form
- Site plan/sketch showing property lines, setbacks from all property lines and streets, building dimensions, and proposed location on lot
- Construction valuation estimate
- Zoning district confirmation (form includes reference sheet)
- Building code
- Not clearly stated on the town's public website. The permit process appears to be primarily a zoning/administrative permit rather than full code enforcement. Confirm code adoption status with Town Hall.
- Permit validity
- Void if work does not start within 120 days of issuance or if work is abandoned for 365 days.
- Owner-builder
- Not detailed on the town website. Application is signed by the owner or agent; homeowners may likely pull their own permits. Confirm with Town Hall.
- Contractor requirements
- An annual contractor registration fee of $25 applies under Town Code Chapter 8-6. Contractors doing permit-required work must be registered with the town unless working on their own property and not for resale.
Application process
Typical processing: Not published. Contact (307) 568-3331.
- 01 Download the Building Permit form from the town website or pick up at Town Hall.
- 02 Complete all fields: owner/applicant name, property address, legal description, zoning district, building dimensions, foundation type, roof type, class of work, use of building, construction valuation, and site plan/sketch.
- 03 Include a site plan or sketch showing property lines, setbacks, and proposed structure location. The permit form includes a zoning reference sheet with setback requirements.
- 04 Submit the completed application and pay the $25 permit fee at Town Hall.
- 05 Town reviews the application for zoning compliance (setbacks, lot coverage, use).
- 06 Permit is issued. Post permit on the job site.
- 07 Begin construction. Contact Town Hall if any changes from the approved permit are needed.
- 08 Contact Town Hall to confirm what inspections, if any, are required during or after construction.
Typical processing time: Not published. Contact (307) 568-3331.
Fee schedule
Basin building permit fees
Online at https://www.thetownofbasin.com/online-payments.html (confirm which payments are accepted online); in-person at Town Hall.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Formal inspection sequence not published on the town website. (phone)
Typical sequence: Formal inspection sequence not published. Because Basin has not confirmed adoption of the IRC or IBC, formal phased inspections may not be formally required. Contact Town Hall at (307) 568-3331 to confirm whether inspections are required and what the process is.
Frequently asked
Common questions about Basin permits
01 Do I need a building permit in Basin, WY? ▸
02 How much does a building permit cost in Basin, WY? ▸
03 How do I apply for a building permit in Basin, WY? ▸
04 How long does it take to get a building permit in Basin, WY? ▸
05 What work is exempt from building permits in Basin, WY? ▸
06 How do I schedule a building inspection in Basin, WY? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Basin -- Clerk/Treasurer's Office before applying. Jaspector is not legal advice.