How to apply for a building permit in unincorporated Taylor County, Wisconsin. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Taylor County Zoning Department

Street address
224 South Second Street, Medford, WI 54451, Courthouse 1st Floor
Coverage
countywide zoning, sanitary, shoreland, floodplain, airport zoning, subdivision, address system, telecommunications facilities, mining, and related environmental health enforcement in the unincorporated county
Online portal
Permit portal
county website form and PDF application links
§ 02

When a permit is required

Permit triggers and exempt work for Taylor County

county zoning permit required for regulated work in county jurisdiction; sanitary permits apply for POWTS-related work; shoreland-related work is subject to county review.

The county page indicates it regulates specific zoning and sanitary matters rather than all general construction.
  • Exempt The county page indicates it regulates specific zoning and sanitary matters rather than all general construction.
Required documents
  • site plan, stake/flag project, application fee, complete set of building floor plans for all floors, at least two elevation view drawings, and excavation/clearing/grading location if applicable.
Building code
no countywide building code adoption statement was found on the zoning page. The county does administer sanitary code and state plumbing code enforcement in its zoning function.
Permit validity
the zoning application form shows issued and expiration dates, but no general posted term was found.
Owner-builder
owner/agent signs the application and is responsible for correct information and compliance with local, state, and federal law.
Contractor requirements
agent/builder information may be provided, but no general contractor licensing requirement was posted on the county zoning page.
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Confirm whether the work is in shoreland, sanitary, zoning, or related county jurisdiction.
  2. 02
    Complete the zoning permit or other relevant application.
  3. 03
    Attach site plan and required drawings.
  4. 04
    Stake or flag the project for inspection.
  5. 05
    Submit the application fee.
  6. 06
    County staff may perform preinspection and on-site inspection before issuance.
  7. 07
    Permit is issued or denied by the zoning administrator.
§ 04

Fee schedule

Taylor County building permit fees

Fee type
Amount
01
Minimum permit fee
zoning permit application fee $100
02
Permit fee formula
no formula published for the zoning permit itself; permit fee is flat on the posted county page
03
Reinspection fee
$50

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

Inspection hours
application says inspections may be made between normal business hours Monday through Friday.

Typical sequence: preinspection may occur, then on-site inspection, then issue or denial.

incorrect information may cause delay or reinspection fee if applicable.

§ 06

Frequently asked

Common questions about unincorporated Taylor County permits

01 Do I need a building permit in unincorporated Taylor County, WI?
county zoning permit required for regulated work in county jurisdiction; sanitary permits apply for POWTS-related work; shoreland-related work is subject to county review.
02 How much does a building permit cost in unincorporated Taylor County, WI?
Building permit fees in unincorporated Taylor County, WI are set by the local building department and vary by project type and valuation. The minimum permit fee is zoning permit application fee $100. Fees are calculated as: no formula published for the zoning permit itself; permit fee is flat on the posted county page.
03 How do I apply for a building permit in unincorporated Taylor County, WI?
To apply for a building permit in unincorporated Taylor County, WI, follow these steps: 1. Confirm whether the work is in shoreland, sanitary, zoning, or related county jurisdiction. 2. Complete the zoning permit or other relevant application. 3. Attach site plan and required drawings. 4. Stake or flag the project for inspection. 5. Submit the application fee. 6. County staff may perform preinspection and on-site inspection before issuance. 7. Permit is issued or denied by the zoning administrator.
04 What work is exempt from building permits in unincorporated Taylor County, WI?
Not all construction work requires a permit in unincorporated Taylor County, WI. The following work is generally exempt: The county page indicates it regulates specific zoning and sanitary matters rather than all general construction.. When in doubt, confirm with the local building department before starting work.
last verified April 2026 entry id permits/wisconsin/taylor/unincorporated

Educational reference. Permit rules and fees change — confirm current requirements directly with Taylor County Zoning Department before applying. Jaspector is not legal advice.