How to apply for a building permit in City of Tomahawk, Wisconsin. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 5
§ 01

Permit authority

Building Inspector, Planning and Zoning

Street address
City Hall, 23 N. 2nd Street, PO Box 469, Tomahawk, WI 54487
Coverage
City of Tomahawk
§ 02

When a permit is required

Permit triggers and exempt work for Tomahawk

No building or structure, or part of a structure, may be built, enlarged, altered inside or outside, moved, or demolished within the city without a permit

Required documents
  • City form, plot plan, and for dwellings two sets of plans
Building code
City code adopts the Wisconsin Uniform Dwelling Code and state administrative code provisions in Chapter 18
§ 03

Fee schedule

Tomahawk building permit fees

Fee type
Amount
01
Minimum permit fee
Section 18-94 is the controlling fee section, but the specific dollar table was not exposed in the captured PDF lines
02
Permit fee formula
Section 18-94 controls building permit and inspection fees; the city code says the permit fee shall be set there

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 04

Required inspections

Scheduling and sequence

How to schedule
  • Inspectors can be contacted by phone; office hours are Monday through Friday, 2:00 p.m. to 5:00 p.m. for the building in (phone)

Typical sequence: Submit permit application and plans, obtain approval, receive permit, post permit at site, then call for required inspections

If written notice of violations is not corrected within 30 days, stop-work procedures can apply; soil erosion control issues must be corrected within 72 hours after notice

§ 05

Frequently asked

Common questions about Tomahawk permits

01 Do I need a building permit in Tomahawk, WI?
No building or structure, or part of a structure, may be built, enlarged, altered inside or outside, moved, or demolished within the city without a permit
02 How much does a building permit cost in Tomahawk, WI?
Building permit fees in Tomahawk, WI are set by the local building department and vary by project type and valuation. The minimum permit fee is Section 18-94 is the controlling fee section, but the specific dollar table was not exposed in the captured PDF lines. Fees are calculated as: Section 18-94 controls building permit and inspection fees; the city code says the permit fee shall be set there.
03 How do I schedule a building inspection in Tomahawk, WI?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Tomahawk, WI via: Inspectors can be contacted by phone; office hours are Monday through Friday, 2:00 p.m. to 5:00 p.m. for the building in.
last verified April 2026 entry id permits/wisconsin/lincoln/tomahawk

Educational reference. Permit rules and fees change — confirm current requirements directly with Building Inspector, Planning and Zoning before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Lincoln County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Lincoln County jurisdictions →