On this page 4
Application process
Application → plan check → issuance → inspection → final
- 01 Download the building permit application.
- 02 Contact John Lust with questions about whether a permit is needed.
- 03 If required, John Lust works with the applicant to complete the process.
Source: Village of Marquette building permit administration with John Lust, Kunkel Engineering Group ↗
Required inspections
Scheduling and sequence
- Contact John Lust at 920-210-6351 (phone)
- Inspection hours
- Office hours by appointment.
Frequently asked
Common questions about Marquette permits
01 How do I apply for a building permit in Marquette, WI? ▸
02 How do I schedule a building inspection in Marquette, WI? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Village of Marquette building permit administration with John Lust, Kunkel Engineering Group before applying. Jaspector is not legal advice.