When a permit is required
Permit triggers and exempt work for New Auburn
The village posts regular building permit, UDC new construction/commercial permit, poultry permit, razing permit, sign permit, driveway permit, excavation permit, and other forms
- Application
- Site sketch showing lot and setbacks
- Legal description
- Contractor certification info
- UDC form where applicable
- Building code
- Village code 142-7 and zoning 350-131 are referenced on the building permit form
- Owner-builder
- The permit form states that non-owner applicants for dwellings must provide a Certificate of Financial Responsibility under Wisconsin Statute 101.654
- Contractor requirements
- Contractor certification number is requested on the application
Application process
Application → plan check → issuance → inspection → final
- 01 Open the Government page and choose the building permit form.
- 02 Complete the building permit application and attach site sketch, legal description, and other required materials.
- 03 Email the completed building permit packet to the building inspector.
- 04 Submit related permits such as driveway, excavation, razing, or sign permits as needed.
- 05 Pay related permit fees through the village process.
Source: Village of New Auburn ↗
Required inspections
Scheduling and sequence
- Building inspector email (email)
- Inspection hours
- Village hall hours are Monday through Thursday 7:00 am to 5:30 pm and Friday by appointment only
Typical sequence: Application, review, permit issuance, inspections
Building inspector checks grades before footings are poured
Source: Village of New Auburn ↗
Frequently asked
Common questions about New Auburn permits
01 Do I need a building permit in New Auburn, WI? ▸
02 How do I apply for a building permit in New Auburn, WI? ▸
03 How do I schedule a building inspection in New Auburn, WI? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Village of New Auburn before applying. Jaspector is not legal advice.