jaspector
§ WV Wood County
City building permits

City of Vienna

How to apply for a building permit in City of Vienna, West Virginia. Permit authority, application steps, fees, and inspection requirements.

Avg processing
Not publicly stated.
Last verified
April 2026
On this page 6
§ 01

Permit authority

Building Code and Inspection Department, City of Vienna

Street address
609 29th Street, Vienna, WV 26105
Coverage
Covers all properties within Vienna city limits. Vienna is the second-largest city in Wood County (approx. 10,000+ residents). Does not cover unincorporated county areas.
Online portal
Building Code and Inspection Department
City website (CivicPlus/Revize)
§ 02

When a permit is required

Permit triggers and exempt work for Vienna

Per Vienna codified ordinances Article 1721, permits are required for construction, alteration, repair, and occupancy changes consistent with the West Virginia State Building Code. Vienna requires a permit for any new shed regardless of size, with a required site plan showing where the shed will be located.

Note: Not detailed on public web pages. The Vienna codified ordinances govern exemptions; access at https://codelibrary.amlegal.com/codes/vienna/latest/vienna_wv/ and review Part Seventeen (Building and Housing Code). Contact the Building Code and Inspection Department at 304-295-5070 ext. 338 for a current exemptions list before starting work.

Required documents
  • Application form
  • Site plan showing lot dimensions, existing structures, and proposed structure/alteration location and dimensions
  • Proposed use description
  • Residential unit count (if applicable)
  • Any other information required by the Building Inspector
Building code
West Virginia State Building Code (2018 IBC, 2018 IRC, 2015 IECC, 2020 NEC) referenced in Article 1721 of the Vienna codified ordinances. A document titled 'Effective West Virginia Building Codes' is available from the department.
Permit validity
Not publicly stated on web pages; contact office.
Owner-builder
Not stated publicly; contact office.
Contractor requirements
West Virginia contractor license required per state law (WV Code 30-42-10). Contact the Building Code and Inspection Department to confirm local requirements.

Source: Building Code and Inspection Department, City of Vienna ↗

§ 03

Application process

Typical processing: Not publicly stated.

  1. 01
    Contact the Building Code and Inspection Department at 304-295-5070 ext. 338 or visit the office at 609 29th Street during business hours (Mon-Fri 8 AM - 4 PM) to confirm whether your project requires a permit.
  2. 02
    Obtain the building permit application (available at city offices or possibly downloadable from the city website forms section).
  3. 03
    Complete the application with: lot dimensions and shape, exact sizes and locations of existing structures, location and dimensions of proposed building or alteration, proposed use of building and land, number of residential units (if applicable), existing conditions on lot, and other information required by the Building Inspector.
  4. 04
    Submit application to the Building Code and Inspection Department.
  5. 05
    Pay the applicable permit fee (fee schedule per Section 1721.03 of Vienna codified ordinances; fees are posted in the office of the Mayor).
  6. 06
    Await plan review. The Building Inspector administers and enforces all building, construction, and occupancy permit requirements.
  7. 07
    Schedule required inspections.

Typical processing time: Not publicly stated.

Source: Building Code and Inspection Department, City of Vienna ↗

§ 04

Fee schedule

Vienna building permit fees

Fee type
Amount
01
Permit fee formula
Fee schedule per Section 1721.03 of Vienna codified ordinances is posted in the office of the Mayor at 609 29th Street, Vienna, WV 26105. Not available online at time of research.

No online payment portal identified. Fees likely paid in person at 609 29th Street. Contact office to confirm accepted payment methods.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • 304-295-5070 ext. 338 (phone)
Inspection hours
Monday-Friday 8 AM to 4 PM

Typical sequence: Not detailed on public pages; the Building Inspector conducts inspections of properties throughout the city and enforces all code and occupancy requirements. Contact office for project-specific sequence.

§ 06

Frequently asked

Common questions about Vienna permits

01 Do I need a building permit in Vienna, WV?
Per Vienna codified ordinances Article 1721, permits are required for construction, alteration, repair, and occupancy changes consistent with the West Virginia State Building Code. Vienna requires a permit for any new shed regardless of size, with a required site plan showing where the shed will be located.
02 How much does a building permit cost in Vienna, WV?
Building permit fees in Vienna, WV are set by the local building department and vary by project type and valuation. Fees are calculated as: Fee schedule per Section 1721.03 of Vienna codified ordinances is posted in the office of the Mayor at 609 29th Street, Vienna, WV 26105. Not available online at time of research..
03 How do I apply for a building permit in Vienna, WV?
To apply for a building permit in Vienna, WV, follow these steps: 1. Contact the Building Code and Inspection Department at 304-295-5070 ext. 338 or visit the office at 609 29th Street during business hours (Mon-Fri 8 AM - 4 PM) to confirm whether your project requires a permit. 2. Obtain the building permit application (available at city offices or possibly downloadable from the city website forms section). 3. Complete the application with: lot dimensions and shape, exact sizes and locations of existing structures, location and dimensions of proposed building or alteration, proposed use of building and land, number of residential units (if applicable), existing conditions on lot, and other information required by the Building Inspector. 4. Submit application to the Building Code and Inspection Department. 5. Pay the applicable permit fee (fee schedule per Section 1721.03 of Vienna codified ordinances; fees are posted in the office of the Mayor). 6. Await plan review. The Building Inspector administers and enforces all building, construction, and occupancy permit requirements. 7. Schedule required inspections.
04 How long does it take to get a building permit in Vienna, WV?
Building permit processing times in Vienna, WV typically run Not publicly stated.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Vienna, WV?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Vienna, WV via: 304-295-5070 ext. 338.
last verified April 2026 source Building Code and Inspection Department, City of Vienna ↗ entry id permits/west-virginia/wood/vienna

Educational reference. Permit rules and fees change — confirm current requirements directly with Building Code and Inspection Department, City of Vienna before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Wood County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Wood County jurisdictions →