On this page 5
When a permit is required
Permit triggers and exempt work for Summersville
Any construction, alteration, relocation, or demolition of buildings with contract value exceeding $100. All commercial and industrial construction requires permits. All additions or alterations to existing buildings exceeding $100.
- Exempt Ordinary cultivation or landscaping
- Exempt Structures under $100 in value are exempt
- Exempt Agricultural buildings or structures are exempt from building code requirements
Note: Exemptions from building permit do not waive zoning and planning requirements or health department requirements. Confirm edge cases with City of Summersville before proceeding.
- Completed building permit application form
- Site plan or plat showing property dimensions and proposed building location (drawn to scale)
- Plot plans to scale
- Floor plans or construction drawings (as applicable)
- Proof of contractor licensure if contractor is employed
- Zoning compliance documentation
- Building code
- West Virginia State Building Code (WVSBC, adopted 2009). International Property Maintenance Code (IPMC, adopted 2012). Codes enforce 2018 IBC/IRC standards with state amendments.
- Permit validity
- Permit card must be displayed visibly at job site during all construction. Specific expiration timeline not publicly specified; contact Building Code Official for details.
- Owner-builder
- Owner-builders may perform work on their own properties, but must obtain permit and pass inspections.
- Contractor requirements
- West Virginia requires general contractors for residential projects exceeding $5,000 to be licensed through the WV Contractor Licensing Board. Electrical work exceeding $1,000 requires licensure. Proof of licensure must be provided with permit applications.
Application process
Typical processing: Within 10 days of submission
- 01 Contact City Recorder to obtain Building Permit application form.
- 02 Complete application on form provided by City.
- 03 Prepare site plan, plat, or map showing property dimensions and proposed building location (drawn to scale).
- 04 Include plot plans to scale.
- 05 Submit completed application and plans to City Recorder (in person or by mail to PO Box 525, Summersville, WV 26651).
- 06 City acts on application within 10 days of submission.
- 07 If approved, obtain permit before beginning work.
- 08 Display permit card visibly at job site during all construction.
- 09 Schedule inspections with minimum notice period (typically 24 hours).
- 10 Pass all required inspections.
- 11 Obtain final inspection and Certificate of Occupancy before occupancy.
Typical processing time: Within 10 days of submission
Required inspections
Scheduling and sequence
- City of Summersville (304) 872-1211 (phone)
- City of Summersville, 400 Broad Street, PO Box 525, Summersville, WV 26651 (mail)
- Scheduling deadline
- Minimum 24 hours advance notice required
- Inspection hours
- Monday–Friday (city business hours)
Typical sequence: Required inspections: (1) Foundation (before backfilling), (2) Framing and rough-in mechanical/electrical/plumbing, (3) Final inspection (upon substantial completion), (4) Certificate of Occupancy (before occupancy).
Frequently asked
Common questions about Summersville permits
01 Do I need a building permit in Summersville, WV? ▸
02 How do I apply for a building permit in Summersville, WV? ▸
03 How long does it take to get a building permit in Summersville, WV? ▸
04 What work is exempt from building permits in Summersville, WV? ▸
05 How do I schedule a building inspection in Summersville, WV? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Summersville — Building Code Official before applying. Jaspector is not legal advice.