jaspector
City building permits

City of Rainier

How to apply for a building permit in City of Rainier, Washington. Permit authority, application steps, fees, and inspection requirements.

Code adoption
2021 Washington State Building Code
Min. permit fee
$20.00
Last verified
April 2026
On this page 6
§ 01

Permit authority

Building Department

Street address
102 Rochester Street W, Rainier, WA 98576
Coverage
All properties within the incorporated City of Rainier.
Online portal
City of Rainier Building Permit Applications
Manual (In-Person or Mail)
§ 02

When a permit is required

Permit triggers and exempt work for Rainier

Building permit required for most construction, alterations, and changes within the City of Rainier.

Specific exemptions listed in building codes
  • Exempt Specific exemptions listed in building codes

Note: Contact Building Department for specific exemption determination.

Required documents
  • Completed building permit application
  • Site plan meeting submittal requirements
  • Two sets of legible construction plans (11x17 minimum)
  • Stamped truss shop drawings (if required)
  • Washington State Energy Code documents
  • Certificate of Water Availability (if applicable)
Building code
2021 Washington State Building Code
Permit validity
Building permit application valid for one year from issuance.

Source: Building Department ↗

§ 03

Application process

Typical processing: Varies based on application completeness and department coordination.

  1. 01
    Download building permit application from website or obtain from City Hall.
  2. 02
    Submit complete application with: site plan meeting submittal requirements, two sets of construction plans (11x17 minimum), stamped truss shop drawings (if required), Washington State Energy Code documents, and Certificate of Water Availability (if applicable).
  3. 03
    Pay planning review and building department fees at time of application.
  4. 04
    Application reviewed by multiple departments.
  5. 05
    Permit issued upon approval.

Typical processing time: Varies based on application completeness and department coordination.

Source: Building Department ↗

§ 04

Fee schedule

Effective 2026

Fee type
Amount
01
Minimum permit fee
$20.00
02
Plan check fee
Planning review fees paid at application
03
Permit fee formula
Fees based on project valuation. See Chapter 2.48 Fee Schedule for planning and community development fees.

Washington State Building Code fee: $4.50 per permit. Permit issuance fee: $20.00. Fire impact fees collected per Ordinance (effective March 5, 2018). No deposit required for new applications.

Fees change periodically. Confirm at the official fee schedule ↗ (effective 2026) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Scheduling deadline
24-hour notice required for all inspections.

Typical sequence: Multiple inspections required throughout construction.

Source: Building Department ↗

§ 06

Frequently asked

Common questions about Rainier permits

01 Do I need a building permit in Rainier, WA?
Building permit required for most construction, alterations, and changes within the City of Rainier.
02 How much does a building permit cost in Rainier, WA?
Building permit fees in Rainier, WA are set by the local building department and vary by project type and valuation. The minimum permit fee is $20.00. Fees are calculated as: Fees based on project valuation. See Chapter 2.48 Fee Schedule for planning and community development fees.. Plan check fee: Planning review fees paid at application.
03 How do I apply for a building permit in Rainier, WA?
To apply for a building permit in Rainier, WA, follow these steps: 1. Download building permit application from website or obtain from City Hall. 2. Submit complete application with: site plan meeting submittal requirements, two sets of construction plans (11x17 minimum), stamped truss shop drawings (if required), Washington State Energy Code documents, and Certificate of Water Availability (if applicable). 3. Pay planning review and building department fees at time of application. 4. Application reviewed by multiple departments. 5. Permit issued upon approval.
04 How long does it take to get a building permit in Rainier, WA?
Building permit processing times in Rainier, WA typically run Varies based on application completeness and department coordination.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Rainier, WA?
Not all construction work requires a permit in Rainier, WA. The following work is generally exempt: Specific exemptions listed in building codes. Note: Contact Building Department for specific exemption determination. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Rainier, WA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Rainier, WA via: Contact Building Department through City of Rainier. 24-hour notice required for all inspections..
last verified April 2026 source Building Department ↗ entry id permits/washington/thurston/rainier

Educational reference. Permit rules and fees change — confirm current requirements directly with Building Department before applying. Jaspector is not legal advice.