Town of Northport

How to apply for a building permit in Town of Northport, Washington. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Town Hall (Building permits may be handled by Stevens County Building Division)

Street address
315 Summit Avenue, Northport, WA 99157
Coverage
Northport is a very small town that does not maintain a dedicated building department. Building permits within town limits are likely processed through Stevens County Land Services Building Division. Confirm authority before submitting.
Online portal
Stevens County SmartGov Portal
SmartGov Community Portal (limited permit types)
§ 02

When a permit is required

Permit triggers and exempt work for Northport

Washington State Building Code (IBC/IRC with WA amendments) applies throughout the state, including Northport. Work requiring permits includes: new construction, structural additions or alterations, plumbing and mechanical modifications, and accessory structures above exemption thresholds.

Accessory structures under 200 sq ft with no plumbing, no habitable space, and not on permanent foundation (generally exempt)
  • Exempt Accessory structures under 200 sq ft with no plumbing, no habitable space, and not on permanent foundation (generally exempt)

Note: Standard IBC/IRC exemptions apply. Confirm with the applicable authority before proceeding.

Required documents
  • Completed permit application
  • Site plan
  • Construction drawings
  • Project description and valuation
Building code
2021 International Building Code (IBC) and International Residential Code (IRC) with Washington State amendments
Permit validity
Contact the applicable authority for permit validity period.
Owner-builder
Both property owners and L&I-registered contractors may apply.
Contractor requirements
Contractors must be registered with Washington State L&I under RCW 18.27. General contractors must carry a $30,000 surety bond; specialty contractors must carry $15,000. General liability insurance minimums: $200,000 public liability / $50,000 property damage.

Source: Town Hall (Building permits may be handled by Stevens County Building Division) ↗

§ 03

Application process

Typical processing: Varies based on authority and plan review complexity. Contact town hall or county building division for estimate.

  1. 01
    Contact Northport Town Hall at (509) 732-4450 to confirm whether the town or Stevens County is the building permit authority for your project.
  2. 02
    If county authority: submit application to Stevens County Land Services Building Division, 260 S. Oak St., Colville, WA 99114.
  3. 03
    If town authority: obtain application from town hall and follow town requirements.
  4. 04
    Provide site plan, project description, valuation, and ownership documentation.
  5. 05
    Pay applicable fees.
  6. 06
    Post permit at job site and call for required inspections.

Typical processing time: Varies based on authority and plan review complexity. Contact town hall or county building division for estimate.

Source: Town Hall (Building permits may be handled by Stevens County Building Division) ↗

§ 04

Fee schedule

Northport building permit fees

Fee type
Amount
01
Plan check fee
Contact town hall or county building division for current amounts.
02
Permit fee formula
Fees depend on the permitting authority (town or county). If processed through Stevens County, the county fee schedule applies.

Contact Northport Town Hall at (509) 732-4450 or Stevens County Building Division at (509) 684-8325.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • (509) 732-4450 (town) or (509) 684-8325 (county) (phone)
Inspection hours
Monday–Friday; confirm hours with applicable authority

Typical sequence: If processed through Stevens County: schedule at least two working days in advance. Inspections by day, call between 8:30-9:00 a.m. for approximate time window. Electrical inspections conducted by L&I.

Source: Town Hall (Building permits may be handled by Stevens County Building Division) ↗

§ 06

Frequently asked

Common questions about Northport permits

01 Do I need a building permit in Northport, WA?
Washington State Building Code (IBC/IRC with WA amendments) applies throughout the state, including Northport. Work requiring permits includes: new construction, structural additions or alterations, plumbing and mechanical modifications, and accessory structures above exemption thresholds.
02 How much does a building permit cost in Northport, WA?
Building permit fees in Northport, WA are set by the local building department and vary by project type and valuation. Fees are calculated as: Fees depend on the permitting authority (town or county). If processed through Stevens County, the county fee schedule applies.. Plan check fee: Contact town hall or county building division for current amounts..
03 How do I apply for a building permit in Northport, WA?
To apply for a building permit in Northport, WA, follow these steps: 1. Contact Northport Town Hall at (509) 732-4450 to confirm whether the town or Stevens County is the building permit authority for your project. 2. If county authority: submit application to Stevens County Land Services Building Division, 260 S. Oak St., Colville, WA 99114. 3. If town authority: obtain application from town hall and follow town requirements. 4. Provide site plan, project description, valuation, and ownership documentation. 5. Pay applicable fees. 6. Post permit at job site and call for required inspections.
04 How long does it take to get a building permit in Northport, WA?
Building permit processing times in Northport, WA typically run Varies based on authority and plan review complexity. Contact town hall or county building division for estimate.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Northport, WA?
Not all construction work requires a permit in Northport, WA. The following work is generally exempt: Accessory structures under 200 sq ft with no plumbing, no habitable space, and not on permanent foundation (generally exempt). Note: Standard IBC/IRC exemptions apply. Confirm with the applicable authority before proceeding. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Northport, WA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Northport, WA via: (509) 732-4450 (town) or (509) 684-8325 (county).
last verified April 2026 source Town Hall (Building permits may be handled by Stevens County Building Division) ↗ entry id permits/washington/stevens/northport

Educational reference. Permit rules and fees change — confirm current requirements directly with Town Hall (Building permits may be handled by Stevens County Building Division) before applying. Jaspector is not legal advice.