How to apply for a building permit in City of Burlington, Washington. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Burlington Building Department

Street address
833 S. Spruce Street, Burlington, WA 98233
Coverage
All properties within the incorporated City of Burlington.
§ 02

When a permit is required

Permit triggers and exempt work for Burlington

Building permits required for all construction within City of Burlington

Minor repairs and finish work (specific exemptions based on scope and valuation)
  • Exempt Minor repairs and finish work (specific exemptions based on scope and valuation)

Note: Contact Building Department to confirm exemption status for your specific project

Required documents
  • Completed permit application
  • Site plan showing property location
  • Architectural plans and construction drawings
  • Structural engineering drawings (if required)
  • Project specifications
Building code
International Building Codes with Washington State amendments
Permit validity
Permits expire if construction does not begin within timeframe specified in permit
Owner-builder
Property owner may perform own work; verify all requirements with Building Department
Contractor requirements
Washington State L&I contractor registration required; floodplain work requires additional contacts

Source: City of Burlington Building Department ↗

§ 03

Application process

Typical processing: Processing time varies; contact Building Department for project-specific timeline

  1. 01
    Submit permit application and required documents via email to permits@burlingtonwa.gov
  2. 02
    Include site plans, architectural plans, structural engineering (if required), and specifications
  3. 03
    City staff reviews application for compliance with Building Code and zoning requirements
  4. 04
    Pay permit fees upon invoice (fee schedule available on city website)
  5. 05
    Receive permit or deficiency letter with required corrections
  6. 06
    Resubmit with corrections if required
  7. 07
    Schedule inspections as work progresses

Typical processing time: Processing time varies; contact Building Department for project-specific timeline

Source: City of Burlington Building Department ↗

§ 04

Fee schedule

Effective April 9, 2024

Fee type
Amount
01
Permit fee formula
Based on project valuation; see fee schedule for details

Contact Building Department for payment instructions

Fees change periodically. Confirm at the official fee schedule ↗ (effective April 9, 2024) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • bbuilding@burlingtonwa.gov (email)
  • 360-755-0077 (phone)
Inspection hours
Contact Building Department for current inspection hours

Typical sequence: Inspections required at various construction phases; all permitted work must be inspected

Source: City of Burlington Building Department ↗

§ 06

Frequently asked

Common questions about Burlington permits

01 Do I need a building permit in Burlington, WA?
Building permits required for all construction within City of Burlington
02 How much does a building permit cost in Burlington, WA?
Building permit fees in Burlington, WA are set by the local building department and vary by project type and valuation. Fees are calculated as: Based on project valuation; see fee schedule for details.
03 How do I apply for a building permit in Burlington, WA?
To apply for a building permit in Burlington, WA, follow these steps: 1. Submit permit application and required documents via email to permits@burlingtonwa.gov 2. Include site plans, architectural plans, structural engineering (if required), and specifications 3. City staff reviews application for compliance with Building Code and zoning requirements 4. Pay permit fees upon invoice (fee schedule available on city website) 5. Receive permit or deficiency letter with required corrections 6. Resubmit with corrections if required 7. Schedule inspections as work progresses
04 How long does it take to get a building permit in Burlington, WA?
Building permit processing times in Burlington, WA typically run Processing time varies; contact Building Department for project-specific timeline. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Burlington, WA?
Not all construction work requires a permit in Burlington, WA. The following work is generally exempt: Minor repairs and finish work (specific exemptions based on scope and valuation). Note: Contact Building Department to confirm exemption status for your specific project When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Burlington, WA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Burlington, WA via: bbuilding@burlingtonwa.gov, 360-755-0077.
last verified April 2026 source City of Burlington Building Department ↗ entry id permits/washington/skagit/burlington

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Burlington Building Department before applying. Jaspector is not legal advice.