Unincorporated Pend Oreille County

How to apply for a building permit in unincorporated Pend Oreille County, Washington. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Community Development Department

Street address
418 S. Scott Ave., Newport, WA 99156
Coverage
All unincorporated areas of Pend Oreille County, and by interlocal agreement, the towns of Cusick, Ione, Metaline Falls, and Town of Metaline.
Online portal
Pend Oreille County PublicPortal
PublicPortal
§ 02

When a permit is required

Permit triggers and exempt work for Pend Oreille County

Building permits are required for new homes, garages, shops, barns, manufactured home placement, additions and remodels that alter structure or increase footprint, HVAC/heating installation, structural sheathing/foundation work, adding rooms, and changes of occupancy or use.

One-story detached accessory buildings used as tool or storage sheds not exceeding 600 sq. ft. (including attached decks or porches) — exempt as of January 1, 2016, but Site Evaluation Application still required
Private greenhouses
Minor repairs, ordinary maintenance, painting, cosmetic work per Washington State exemptions (RCW 19.27.040)
  • Exempt One-story detached accessory buildings used as tool or storage sheds not exceeding 600 sq. ft. (including attached decks or porches) — exempt as of January 1, 2016, but Site Evaluation Application still required
  • Exempt Private greenhouses
  • Exempt Minor repairs, ordinary maintenance, painting, cosmetic work per Washington State exemptions (RCW 19.27.040)

Note: Setback requirements apply to all structures, including those exempt from building permits. Confirm setbacks and edge cases through the Site Evaluation Application process.

Required documents
  • Site Evaluation Application (with scaled sketch showing property features)
  • Building permit application
  • Construction plans and drawings
  • Plot plan
Building code
2021 IBC and 2021 IRC with Washington State amendments (effective March 15, 2024); 2023 BOCC-Approved Building Regulations; 2024 BOCC-Approved Development Regulations (adopted January 27, 2025)
Permit validity
Permits expire one year after issuance. May be renewed up to four times at $55.00 per renewal, for a maximum total duration of five years from the original issue date.
Contractor requirements
Contractors must hold an active Washington State contractor registration with L&I (RCW 18.27). Electrical work requires a separate electrical permit from L&I.

Source: Community Development Department ↗

§ 03

Application process

Typical processing: Variable; contact the county for current timelines.

  1. 01
    Complete a Site Evaluation Application prior to any building or land use development — both residential and commercial. The application must include a scaled sketch of the parcel showing spatial relationships of proposed and existing features. Floodplain determination is made during this stage.
  2. 02
    Prepare permit application with all required documents per the county's permit applications checklist. Applications are not reviewed until complete.
  3. 03
    Submit application in person or by mail to the Community Development Department at 418 S. Scott Ave., Newport.
  4. 04
    The department reviews the application; applicants may be contacted for additional information.
  5. 05
    Pay required fees; permit is issued after all fees are paid.
  6. 06
    Display permit packet on the job site at all times until final inspection.
  7. 07
    Schedule required inspections during construction.

Typical processing time: Variable; contact the county for current timelines.

Source: Community Development Department ↗

§ 04

Fee schedule

Pend Oreille County building permit fees

Fee type
Amount
01
Permit fee formula
Based on project type and value; contact the county for current fee amounts.

Permit renewal: $55.00 per renewal (up to four renewals maximum). Floodplain Development Permit: separate fee; contact the department.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • (509) 447-4821 (phone)
Scheduling deadline
Requests made before 3:00 PM are scheduled for the following business day. Requests made after 3:00 PM are not scheduled until the second business day. Same-day inspections will not be scheduled.
Inspection hours
Monday–Friday, 8:00 AM–4:30 PM

Typical sequence: Typical inspection stages for new residential construction: foundation, framing/rough-in (structural, mechanical, plumbing), insulation, final inspection/Certificate of Occupancy. Manufactured homes follow separate inspection stages (foundation pads, anchorage, ground cover, etc.). Inspections for northern Pend Oreille County are prioritized on Tuesdays and Thursdays. The permit packet must remain on the job site until final inspection is complete.

Source: Community Development Department ↗

§ 06

Frequently asked

Common questions about unincorporated Pend Oreille County permits

01 Do I need a building permit in unincorporated Pend Oreille County, WA?
Building permits are required for new homes, garages, shops, barns, manufactured home placement, additions and remodels that alter structure or increase footprint, HVAC/heating installation, structural sheathing/foundation work, adding rooms, and changes of occupancy or use.
02 How much does a building permit cost in unincorporated Pend Oreille County, WA?
Building permit fees in unincorporated Pend Oreille County, WA are set by the local building department and vary by project type and valuation. Fees are calculated as: Based on project type and value; contact the county for current fee amounts..
03 How do I apply for a building permit in unincorporated Pend Oreille County, WA?
To apply for a building permit in unincorporated Pend Oreille County, WA, follow these steps: 1. Complete a Site Evaluation Application prior to any building or land use development — both residential and commercial. The application must include a scaled sketch of the parcel showing spatial relationships of proposed and existing features. Floodplain determination is made during this stage. 2. Prepare permit application with all required documents per the county's permit applications checklist. Applications are not reviewed until complete. 3. Submit application in person or by mail to the Community Development Department at 418 S. Scott Ave., Newport. 4. The department reviews the application; applicants may be contacted for additional information. 5. Pay required fees; permit is issued after all fees are paid. 6. Display permit packet on the job site at all times until final inspection. 7. Schedule required inspections during construction.
04 How long does it take to get a building permit in unincorporated Pend Oreille County, WA?
Building permit processing times in unincorporated Pend Oreille County, WA typically run Variable; contact the county for current timelines.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in unincorporated Pend Oreille County, WA?
Not all construction work requires a permit in unincorporated Pend Oreille County, WA. The following work is generally exempt: One-story detached accessory buildings used as tool or storage sheds not exceeding 600 sq. ft. (including attached decks or porches) — exempt as of January 1, 2016, but Site Evaluation Application still required; Private greenhouses; Minor repairs, ordinary maintenance, painting, cosmetic work per Washington State exemptions (RCW 19.27.040). Note: Setback requirements apply to all structures, including those exempt from building permits. Confirm setbacks and edge cases through the Site Evaluation Application process. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in unincorporated Pend Oreille County, WA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in unincorporated Pend Oreille County, WA via: (509) 447-4821. Requests made before 3:00 PM are scheduled for the following business day. Requests made after 3:00 PM are not scheduled until the second business day. Same-day inspections will not be scheduled..
last verified April 2026 source Community Development Department ↗ entry id permits/washington/pend-oreille/unincorporated

Educational reference. Permit rules and fees change — confirm current requirements directly with Community Development Department before applying. Jaspector is not legal advice.