jaspector
§ WA Lewis County
City building permits

City of Chehalis

How to apply for a building permit in City of Chehalis, Washington. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Community Development Department

Street address
350 N. Market Blvd., Chehalis, WA 98532
Coverage
All properties within the incorporated City of Chehalis and its Urban Growth Area (UGA). Chehalis has an interlocal agreement with Lewis County for UGA management.
§ 02

When a permit is required

Permit triggers and exempt work for Chehalis

A building permit is required prior to the start of any construction, enlargement, alteration, repair, movement, demolition, or change of occupancy of a building or structure.

One-story detached accessory structures (tool sheds, playhouses) with floor area not greater than 200 square feet per IRC R105.2
Certain minor repairs (verify with Building Official)
  • Exempt One-story detached accessory structures (tool sheds, playhouses) with floor area not greater than 200 square feet per IRC R105.2
  • Exempt Certain minor repairs (verify with Building Official)

Note: Verify all exemptions with the Building Official before proceeding.

Required documents
  • Completed building permit application
  • Legal description or tax parcel number
  • Project street address
  • Property owner information
  • Prime contractor business name, address, phone, and contractor registration number
  • For commercial work: interim construction loan lender or payment bond holder information
  • Verification of current contractor registration
  • Applicable plans and specifications
Building code
2021 International Building Code, 2021 International Residential Code, 2021 International Mechanical Code, International Fuel Gas Code, 2021 Uniform Plumbing Code, 2017 National Electrical Code, 2021 International Fire Code, Washington State Energy Code, International Existing Building Code, International Property Maintenance Code
Permit validity
Standard permit validity applies; verify with City.
Contractor requirements
Must verify current contractor registration before permit issuance per WAC 296-200A-110. Contractor includes any person, firm, or entity undertaking construction, alteration, repair, or demolition work.

Source: Community Development Department ↗

§ 03

Application process

Typical processing: Varies based on project complexity and review department workload

  1. 01
    Submit completed permit application with all required documentation in person or by mail.
  2. 02
    Include legal description or tax parcel number, project street address, property owner information, prime contractor details, and contractor registration verification.
  3. 03
    For commercial work: interim construction loan lender or payment bond holder information (per RCW 19.27.095).
  4. 04
    Building official reviews application, plans, and specifications.
  5. 05
    Other departments may review for compliance with applicable laws.
  6. 06
    Pay required fees based on project valuation.
  7. 07
    Permit issued upon approval and payment.

Typical processing time: Varies based on project complexity and review department workload

Source: Community Development Department ↗

§ 04

Fee schedule

Chehalis building permit fees

Fee type
Amount
01
Plan check fee
Building plan review fees and fire plan review fees established by city council ordinance
02
Permit fee formula
Based on project valuation (total of construction work, finish work, painting, roofing, electrical, plumbing, heating, AC, elevators, permanent equipment)

Contact Community Development at (360) 748-0782 for current fee schedule details

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Contact Community Development Department (in-person)

Typical sequence: Special inspections required by code and Section 1704 shall be made by Special Inspection Labs and Inspectors certified and approved by Washington Association of Building Officials (WABO), or based on adequate documentation approved by the Building Official. Standard inspections typically include: Foundation inspection, Framing inspection, Plumbing/mechanical rough-in, Electrical (through L&I), Insulation inspection, Final inspection.

Source: Community Development Department ↗

§ 06

Frequently asked

Common questions about Chehalis permits

01 Do I need a building permit in Chehalis, WA?
A building permit is required prior to the start of any construction, enlargement, alteration, repair, movement, demolition, or change of occupancy of a building or structure.
02 How much does a building permit cost in Chehalis, WA?
Building permit fees in Chehalis, WA are set by the local building department and vary by project type and valuation. Fees are calculated as: Based on project valuation (total of construction work, finish work, painting, roofing, electrical, plumbing, heating, AC, elevators, permanent equipment). Plan check fee: Building plan review fees and fire plan review fees established by city council ordinance.
03 How do I apply for a building permit in Chehalis, WA?
To apply for a building permit in Chehalis, WA, follow these steps: 1. Submit completed permit application with all required documentation in person or by mail. 2. Include legal description or tax parcel number, project street address, property owner information, prime contractor details, and contractor registration verification. 3. For commercial work: interim construction loan lender or payment bond holder information (per RCW 19.27.095). 4. Building official reviews application, plans, and specifications. 5. Other departments may review for compliance with applicable laws. 6. Pay required fees based on project valuation. 7. Permit issued upon approval and payment.
04 How long does it take to get a building permit in Chehalis, WA?
Building permit processing times in Chehalis, WA typically run Varies based on project complexity and review department workload. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Chehalis, WA?
Not all construction work requires a permit in Chehalis, WA. The following work is generally exempt: One-story detached accessory structures (tool sheds, playhouses) with floor area not greater than 200 square feet per IRC R105.2; Certain minor repairs (verify with Building Official). Note: Verify all exemptions with the Building Official before proceeding. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Chehalis, WA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Chehalis, WA via: Contact Community Development Department.
last verified April 2026 source Community Development Department ↗ entry id permits/washington/lewis/chehalis

Educational reference. Permit rules and fees change — confirm current requirements directly with Community Development Department before applying. Jaspector is not legal advice.