On this page 6
When a permit is required
Permit triggers and exempt work for Connell
A building permit is required for projects including: concrete and flatwork, fences, garages, hot water heaters, patio covers and pergolas, plumbing and mechanical work, remodels and renovations, roof replacement, sewer connections, sheds over 200 sq ft, siding replacement, sprinkler systems, stucco repair, water connections, and window and door replacement.
- Exempt Standard state exemptions under RCW 19.27 and the adopted 2018 IBC/IRC apply.
Note: Projects listed as permit-required in Connell include: concrete/flatwork, fences, garages, hot water heaters, patio covers, plumbing/mechanical, remodels, roof replacement, sewer connection, sheds over 200 sq ft, siding replacement, sprinkler systems, stucco repair, water connection, and window/door replacement. For exemption confirmation on any specific project, contact Sterling Joyner (509-234-2701 ext. 1241) or Hallie Tuck (ext. 1239).
- Completed building permit application
- Site plan
- Construction documents
- Contractor information and Washington State L&I registration number
- Building code
- 2018 International Building Code (IBC) and 2018 International Residential Code (IRC) with select appendices. Note: Confirm with City Hall whether 2021 codes have been adopted as of 2026.
- Contractor requirements
- Contractors must hold a valid Washington State L&I contractor registration (RCW Chapter 18.27). City of Connell business license may be required; confirm with City Hall.
Application process
Typical processing: Review timeline not publicly published. Contact City Hall at 509-234-2701 to confirm timing for your specific project.
- 01 Call 509-234-2701 (Sterling Joyner ext. 1241 or Hallie Tuck ext. 1239) to discuss the project and confirm whether a permit is required.
- 02 For new single-family construction, request the New Home Application Packet which includes building permit, water connection, and sewer connection applications.
- 03 Complete all application forms thoroughly and with as much detail as possible to avoid delays.
- 04 Submit applications in person at City Hall (104 E. Adams Street, Connell, WA 99326) or as directed by staff.
- 05 Required documents: site plan, construction documents, and contractor information. Specific checklist items depend on project type.
- 06 City staff reviews applications and contacts you with plan review timeline and any required revisions.
- 07 Pay fees at permit issuance (as directed by City Hall).
- 08 Once all reviews are complete and fees are paid, permit is issued.
Typical processing time: Review timeline not publicly published. Contact City Hall at 509-234-2701 to confirm timing for your specific project.
Source: Building and Planning Services ↗
Fee schedule
Connell building permit fees
Fees due at permit issuance. Contact City Hall at 509-234-2701 for a fee estimate specific to your project.
Required inspections
Scheduling and sequence
- 509-234-2701 (phone)
- Inspection hours
- Monday-Friday, office hours during business day
Typical sequence: Typical residential sequence: foundation, framing, MEP rough-ins (plumbing and mechanical; electrical through L&I), insulation, drywall, final. Confirm specific sequence with Building Official.
Frequently asked
Common questions about Connell permits
01 Do I need a building permit in Connell, WA? ▸
02 How much does a building permit cost in Connell, WA? ▸
03 How do I apply for a building permit in Connell, WA? ▸
04 How long does it take to get a building permit in Connell, WA? ▸
05 What work is exempt from building permits in Connell, WA? ▸
06 How do I schedule a building inspection in Connell, WA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building and Planning Services before applying. Jaspector is not legal advice.