When a permit is required
Permit triggers and exempt work for Kennewick
A building permit is required for most construction within the City of Kennewick.
- Exempt One-story detached accessory structures (tool sheds, playhouses) up to 200 sq ft
- Exempt Temporary land uses not exceeding 10 days (may require business license)
- Exempt Certain minor repairs (verify with Building Department)
Note: Contact Building Department for verification of specific projects.
- Completed New Single Family Residential application (if applicable)
- Plot plan showing 1 inch = 20 feet scale, sidewalk, curb, proposed curb cut, sewer/water services
- Two or more sets of construction plans
- Building elevations
- Foundation plan
- Floor plan with rooms labeled
- Cross-section showing foundation, floor joists, wall framing, ceiling joists
- Stairway detail (if applicable)
- Braced wall panel locations
- Truss reactions and truss layout
- Compliance with Washington State Energy Code
- Building code
- 2021 IBC with Washington State amendments
- Permit validity
- 18 months from issuance; expires if work not commenced or inspections not requested within this period.
- Contractor requirements
- Valid Washington State L&I contractor registration required; business license required for all contractors conducting business in Kennewick.
Source: Building and Development Services, Building Safety Division ↗
Application process
Typical processing: Approximately 10 business days for complete submittals.
- 01 Contact Building Safety Division at 509-585-4276 to discuss project specifics.
- 02 Prepare required documents including completed application, plot plan (1 inch = 20 feet scale), and construction plans.
- 03 Submit application and documents to Building Safety Division.
- 04 Building Department conducts plan review, typically completed within 10 business days for complete submittals.
- 05 Pay permit fee at permit issuance.
- 06 Obtain physical permit and approved plans; both must be on-site during construction.
Typical processing time: Approximately 10 business days for complete submittals.
Source: Building and Development Services, Building Safety Division ↗
Fee schedule
Kennewick building permit fees
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- CSS Portal (online)
- 509-585-4276 (phone)
- Scheduling deadline
- As specified on permit; typically 24-48 hours notice required
- Inspection hours
- Monday-Friday, during business hours
Typical sequence: Required inspections typically include: foundation, framing, plumbing, mechanical, electrical (L&I), and final inspection.
Source: Building and Development Services, Building Safety Division ↗
Frequently asked
Common questions about Kennewick permits
01 Do I need a building permit in Kennewick, WA? ▸
02 How much does a building permit cost in Kennewick, WA? ▸
03 How do I apply for a building permit in Kennewick, WA? ▸
04 How long does it take to get a building permit in Kennewick, WA? ▸
05 What work is exempt from building permits in Kennewick, WA? ▸
06 How do I schedule a building inspection in Kennewick, WA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building and Development Services, Building Safety Division before applying. Jaspector is not legal advice.