§ 01

Permit authority

Town of Hatton does not operate a standalone building department. Building permits are processed by the Adams County Building and Planning Department.

Street address
Adams County Building and Planning Department, 449 E Cedar Blvd, Othello, WA 99344
Coverage
All properties within the Town of Hatton (population under 100). Town administrative approval required before Adams County permit submission.
Online portal
Cloudpermit
Cloudpermit
§ 02

When a permit is required

Permit triggers and exempt work for Hatton

All construction work generally requires a permit, including: new homes, mobile home moves, repairs and additions, plumbing, re-roofing, window replacement, wood/pellet stove installations, and gas inserts.

One-story detached residential accessory structures used as tool/storage sheds, up to 200 sq ft
Fences under 7 feet high (zoning review may still be required)
Decks not exceeding 30 inches above grade and not attached to the dwelling
Retaining walls under 4 feet high (not supporting surcharge or retaining liquids)
Sidewalks and driveways under 30 inches above grade
Painting, papering, tiling, carpeting, cabinet installation, and similar finish work
Prefabricated above-ground pools under 24 inches deep and under 5,000 gallons
Playground equipment (swings, slides, etc.)
Window awnings on single-family residences with projection under 54 inches
Window replacement on single-family homes maintaining structural integrity
  • Exempt One-story detached residential accessory structures used as tool/storage sheds, up to 200 sq ft
  • Exempt Fences under 7 feet high (zoning review may still be required)
  • Exempt Decks not exceeding 30 inches above grade and not attached to the dwelling
  • Exempt Retaining walls under 4 feet high (not supporting surcharge or retaining liquids)
  • Exempt Sidewalks and driveways under 30 inches above grade
  • Exempt Painting, papering, tiling, carpeting, cabinet installation, and similar finish work
  • Exempt Prefabricated above-ground pools under 24 inches deep and under 5,000 gallons
  • Exempt Playground equipment (swings, slides, etc.)
  • Exempt Window awnings on single-family residences with projection under 54 inches
  • Exempt Window replacement on single-family homes maintaining structural integrity

Note: Even permit-exempt work may be subject to zoning review. Call (509) 488-9441 to confirm specific exemptions for your project.

Required documents
  • Completed building permit application
  • Site plan drawn to scale
  • Complete construction drawings (incomplete drawings may result in denial)
  • Energy code compliance forms — WSEC-R (residential) with Code Compliance Calculator (C3); WSEC-C (commercial)
  • Agent authorization form if submitting on behalf of property owner
  • Design criteria documentation
Building code
2021 Washington State Building Code (including the state Energy Code, effective March 15, 2024)
Owner-builder
Town administrative approval must be obtained before submitting a building permit application to Adams County.
Contractor requirements
All contractors must hold valid Washington State Department of Labor & Industries registration before commencing work.

Source: Town of Hatton does not operate a standalone building department. Building permits are processed by the Adams County Building and Planning Department. ↗

§ 03

Application process

Typical processing: 3-4 weeks for plan review; varies by project complexity and number of departments involved.

  1. 01
    Contact Hatton Town Hall (or Adams County Building and Planning at 509-488-9441) to obtain town administrative approval before permit submission.
  2. 02
    Obtain the land parcel number from the Adams County Assessor's tax website or by calling (509) 488-9441.
  3. 03
    Secure pre-application approvals as applicable from Adams County Planning, Environmental Health, Fire Marshal, Public Works, WSDOT (if state highway access), and any other applicable departments.
  4. 04
    Prepare complete application package with all required documents.
  5. 05
    Submit online via Cloudpermit or in person at Adams County Building and Planning, 449 E Cedar Blvd, Othello, WA 99344.
  6. 06
    Await plan review; multi-department projects may take 3-4 weeks.
  7. 07
    Pay permit fees upon approval.
  8. 08
    Receive issued permit and permit packet; post permit on site.
  9. 09
    Schedule required inspections through Cloudpermit.
  10. 10
    Obtain final inspection approval and Certificate of Occupancy before occupancy.

Typical processing time: 3-4 weeks for plan review; varies by project complexity and number of departments involved.

Source: Town of Hatton does not operate a standalone building department. Building permits are processed by the Adams County Building and Planning Department. ↗

§ 04

Fee schedule

Effective 2025-2026

Fee type
Amount
01
Plan check fee
Assessed separately per Adams County fee schedule
02
Permit fee formula
Fees follow Adams County Master Fee Schedule based on construction valuation. Contact Adams County Building Division at (509) 488-9441 for current schedule.

Fees established by Adams County Master Fee Schedule (2025-2026 Approved). Contact county at (509) 488-9441 or visit co.adams.wa.gov.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Inspection hours
Monday–Friday, 8:00 AM – 12:00 PM and 1:00 PM – 4:30 PM

Typical sequence: Typical residential inspection stages: footing/foundation, framing, rough plumbing, rough mechanical, insulation, and final. A Certificate of Occupancy is required before occupancy; county will not issue CO until approvals from all applicable departments and state/federal agencies are obtained.

Source: Town of Hatton does not operate a standalone building department. Building permits are processed by the Adams County Building and Planning Department. ↗

§ 06

Frequently asked

Common questions about Hatton permits

01 Do I need a building permit in Hatton, WA?
All construction work generally requires a permit, including: new homes, mobile home moves, repairs and additions, plumbing, re-roofing, window replacement, wood/pellet stove installations, and gas inserts.
02 How much does a building permit cost in Hatton, WA?
Building permit fees in Hatton, WA are set by the local building department and vary by project type and valuation. Fees are calculated as: Fees follow Adams County Master Fee Schedule based on construction valuation. Contact Adams County Building Division at (509) 488-9441 for current schedule.. Plan check fee: Assessed separately per Adams County fee schedule.
03 How do I apply for a building permit in Hatton, WA?
To apply for a building permit in Hatton, WA, follow these steps: 1. Contact Hatton Town Hall (or Adams County Building and Planning at 509-488-9441) to obtain town administrative approval before permit submission. 2. Obtain the land parcel number from the Adams County Assessor's tax website or by calling (509) 488-9441. 3. Secure pre-application approvals as applicable from Adams County Planning, Environmental Health, Fire Marshal, Public Works, WSDOT (if state highway access), and any other applicable departments. 4. Prepare complete application package with all required documents. 5. Submit online via Cloudpermit or in person at Adams County Building and Planning, 449 E Cedar Blvd, Othello, WA 99344. 6. Await plan review; multi-department projects may take 3-4 weeks. 7. Pay permit fees upon approval. 8. Receive issued permit and permit packet; post permit on site. 9. Schedule required inspections through Cloudpermit. 10. Obtain final inspection approval and Certificate of Occupancy before occupancy.
04 How long does it take to get a building permit in Hatton, WA?
Building permit processing times in Hatton, WA typically run 3-4 weeks for plan review; varies by project complexity and number of departments involved.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Hatton, WA?
Not all construction work requires a permit in Hatton, WA. The following work is generally exempt: One-story detached residential accessory structures used as tool/storage sheds, up to 200 sq ft; Fences under 7 feet high (zoning review may still be required); Decks not exceeding 30 inches above grade and not attached to the dwelling; Retaining walls under 4 feet high (not supporting surcharge or retaining liquids); Sidewalks and driveways under 30 inches above grade; Painting, papering, tiling, carpeting, cabinet installation, and similar finish work; Prefabricated above-ground pools under 24 inches deep and under 5,000 gallons; Playground equipment (swings, slides, etc.); Window awnings on single-family residences with projection under 54 inches; Window replacement on single-family homes maintaining structural integrity. Note: Even permit-exempt work may be subject to zoning review. Call (509) 488-9441 to confirm specific exemptions for your project. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Hatton, WA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Hatton, WA via: Cloudpermit portal.

Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Hatton does not operate a standalone building department. Building permits are processed by the Adams County Building and Planning Department. before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Adams County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Adams County jurisdictions →