jaspector
§ VA Henry County
City building permits

City of Martinsville

How to apply for a building permit in City of Martinsville, Virginia. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Martinsville Community Development and Inspections

Street address
55 W Church Street, Room 217, Martinsville, VA 24112
Coverage
Martinsville is an independent city in Virginia, separate from Henry County for permit-administration purposes. The city issues and administers its own building permits, inspections, zoning, and planning. Henry County Building Inspection has no jurisdiction within Martinsville city limits.
Online portal
CivicPlus Permit Application Form
CivicPlus Form Center
§ 02

When a permit is required

Permit triggers and exempt work for Martinsville

Building permits are required for constructing, moving, altering, or demolishing structures, including electrical, plumbing, mechanical, gas, and fire protection systems. Additional permit types include land disturbance or erosion and sediment control permits (for disturbance over 10,000 square feet), sign permits, demolition permits, mural and public art permits, and special event approvals.

Note: No Martinsville-specific public exempt-work list was found on the city's permit, Community Development, or Inspections pages. Contact Community Development and Inspections at 276-403-5173 to confirm whether your project requires a permit before starting work.

Required documents
  • City permit application
  • Owner and applicant information
  • Property information (address and tax map number)
  • Zoning information
  • Proposed use, cost, dimensions, and square footage
  • Description of work
  • Contractor list by trade
  • Owner affidavit (if owner is applying, referencing Virginia Code Section 54.1-1111)
  • Sealed drawings and site plans (where required by project scope)
  • Demolition asbestos sign-off (for demolition permits)
  • Separate zoning, land disturbance, or sign materials (as required by Community Development)
Building code
2021 Virginia Construction Code (effective January 18, 2024), enforced as the Virginia Uniform Statewide Building Code in its most current edition
Permit validity
The 2021 Virginia Construction Code applies: an application is deemed abandoned six months after filing unless pursued in good faith or a permit is issued. An issued permit may be revoked if work does not commence within six months after issuance or is suspended or abandoned for six months. Extensions may be available. A three-year completion limit applies to new detached single-family dwellings, additions, and residential accessory structures if required by the building official.
Owner-builder
The city permit application includes an owner affidavit that references Virginia Code Section 54.1-1111, stating the owner is not subject to contractor licensure when applying as owner.
Contractor requirements
The city verifies that contractors have the proper licensing and insurance to obtain permits. Contractor licensing is administered by the Virginia Department of Professional and Occupational Regulation (DPOR).

Source: City of Martinsville Community Development and Inspections ↗

§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Download the city permit application and identify the permit scope. The form covers building, demolition, electrical, mechanical, plumbing, gas fitting, fire protection, land disturbance, and sign permits.
  2. 02
    Complete the application with applicant and owner information, property address and tax map number, zoning information, proposed use, cost, dimensions, square footage, description of work, and contractor list by trade. Owners applying directly must complete the owner affidavit on page two, which references Virginia Code Section 54.1-1111.
  3. 03
    Assemble required attachments. Some projects require sealed drawings and site plans. Demolition permits require asbestos sign-off. Land disturbance and zoning forms are published separately by Community Development.
  4. 04
    Submit the package through the online CivicPlus Form Center, or by mail, fax, email, or in-person delivery to the Community Development office.
  5. 05
    The city reviews zoning and code compliance. Community Development handles zoning and subdivisions; Inspections enforces the Virginia Uniform Statewide Building Code.
  6. 06
    Pay permit fees under the city's adopted fee schedule. Confirm payment steps with the permit technician.
  7. 07
    Complete required inspections as work progresses. A final inspection closes the permit. A certificate of occupancy is required before occupancy or change of occupancy where applicable.

Source: City of Martinsville Community Development and Inspections ↗

§ 04

Fee schedule

Effective FY 2025-26

Fee type
Amount
01
Minimum permit fee
$50 for building-only and commercial building permits (plus square-foot charges over thresholds); $60 for decks and demolition; $70 for electrical fixture work
02
Permit fee formula
Mixed. Flat fees for many residential, demolition, and trade permits; per-square-foot adders for certain residential building-only and commercial permits.
03
Reinspection fee
$80 per reinspection
04
Penalty (no permit)
$200 for working without a permit

The city's public permit pages do not clearly describe payment channels, card fees, or online payment timing. Confirm payment instructions with the permit technician.

Fees change periodically. Confirm at the official fee schedule ↗ (effective FY 2025-26) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • 276-403-5173 (phone)

Typical sequence: Inspections are performed under the Virginia Construction Code as work progresses. A final inspection is required to close the permit.

Source: City of Martinsville Community Development and Inspections ↗

§ 06

Frequently asked

Common questions about Martinsville permits

01 Do I need a building permit in Martinsville, VA?
Building permits are required for constructing, moving, altering, or demolishing structures, including electrical, plumbing, mechanical, gas, and fire protection systems. Additional permit types include land disturbance or erosion and sediment control permits (for disturbance over 10,000 square feet), sign permits, demolition permits, mural and public art permits, and special event approvals.
02 How much does a building permit cost in Martinsville, VA?
Building permit fees in Martinsville, VA are set by the local building department and vary by project type and valuation. The minimum permit fee is $50 for building-only and commercial building permits (plus square-foot charges over thresholds); $60 for decks and demolition; $70 for electrical fixture work. Fees are calculated as: Mixed. Flat fees for many residential, demolition, and trade permits; per-square-foot adders for certain residential building-only and commercial permits..
03 How do I apply for a building permit in Martinsville, VA?
To apply for a building permit in Martinsville, VA, follow these steps: 1. Download the city permit application and identify the permit scope. The form covers building, demolition, electrical, mechanical, plumbing, gas fitting, fire protection, land disturbance, and sign permits. 2. Complete the application with applicant and owner information, property address and tax map number, zoning information, proposed use, cost, dimensions, square footage, description of work, and contractor list by trade. Owners applying directly must complete the owner affidavit on page two, which references Virginia Code Section 54.1-1111. 3. Assemble required attachments. Some projects require sealed drawings and site plans. Demolition permits require asbestos sign-off. Land disturbance and zoning forms are published separately by Community Development. 4. Submit the package through the online CivicPlus Form Center, or by mail, fax, email, or in-person delivery to the Community Development office. 5. The city reviews zoning and code compliance. Community Development handles zoning and subdivisions; Inspections enforces the Virginia Uniform Statewide Building Code. 6. Pay permit fees under the city's adopted fee schedule. Confirm payment steps with the permit technician. 7. Complete required inspections as work progresses. A final inspection closes the permit. A certificate of occupancy is required before occupancy or change of occupancy where applicable.
04 How do I schedule a building inspection in Martinsville, VA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Martinsville, VA via: 276-403-5173.
last verified April 2026 source City of Martinsville Community Development and Inspections ↗ entry id permits/virginia/henry/martinsville

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Martinsville Community Development and Inspections before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Henry County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Henry County jurisdictions →