City Building Permits
Town of Tangier, VA - 2026 Building Permit Guide
How to apply for a building permit in Town of Tangier, Virginia. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
Accomack County enforces the Virginia Uniform Statewide Building Code within the Town of Tangier. County zoning does not apply inside incorporated towns; applicants should confirm any town-side zoning, floodplain, or other local requirements directly with the Town before filing with the County. Note that Tangier Island is an offshore island with limited access; applicants should confirm logistics and any island-specific requirements with the County Building Office before proceeding.
- Department
- Accomack County Building and Zoning Office (building permits and inspections for Tangier)
- Address
- 23296 Courthouse Avenue, Suite 203, Accomac, VA 23301
- Phone
- 757-787-5721
Online Permit Portal
Platform: ACCESS — Accomack County Construction and Environmental Self-Service • Account required: Yes • Submission: Online or in-person
Additional resources:
Application Process
- Contact the Town of Tangier and the Accomack County Building Office to confirm island-specific logistics, any town-side prerequisites, and whether any additional floodplain, coastal, or wetlands approvals are required.
- If no separate town-side intake applies, proceed with Accomack County's ordinary building-permit process through the ACCESS portal or at the County Building Office.
- If the town requires a prerequisite approval, secure that approval before County filing.
- Complete County plan review, payment, and permit issuance, then post the permit card and schedule inspections as work progresses.
Typical processing time: No town-specific estimate found. County inspection requests with at least 24 hours notice will be performed within two working days.
Source: Accomack County Building and Zoning Office (building permits and inspections for Tangier)
General Requirements
Accomack County USBC rules govern the actual building permit. Town-side land-use controls and island-specific requirements may also apply; confirm with the Town and County before starting work.
Required Documents
- Accomack County building permit application
- Required County forms (site plan, non-licensed contractor affidavit or owner consent if applicable, Health Department form if needed, flood documents if required)
- Any town-side prerequisite documents as required by the Town of Tangier
- Permit validity
- Accomack County permits are valid for six months after issue; construction must have started within six months. A six-month extension is available (maximum two extensions).
- Building code
- 2021 Virginia code package administered by Accomack County (effective January 18, 2024).
- Owner-builder
- County non-licensed contractor affidavit and owner consent form available for non-licensed applicants.
- Contractor requirements
- Virginia DPOR contractor licensing and County permit declaration requirements apply.
Fees
- Minimum permit fee
- See Accomack County fee schedule. Residential new construction minimum $173.40 (including 2% state levy); residential alterations minimum $128.52.
- Permit fee formula
- County mixed schedule: residential new construction $0.37/sq ft; residential remodeling $0.28/sq ft; administrative flat fees for many permit events.
- Reinspection fee
- $75.00
- Penalty (no permit)
- $105.00 first offense (work started before permit); $420.00 each subsequent offense.
- Payment note
- County ACCESS portal supports online payment.
Fees change. Verify current amounts at the official fee schedule.
Work That Does NOT Require a Permit
- Installation of qualifying low-voltage wiring and equipment under the USBC exemption language
- One-story detached accessory structures not exceeding 200 square feet, unless another rule applies
- Limited roof shingle replacement on an area of 10 feet by 10 feet
- Window replacement
- Other USBC Section 108.2 exempt work listed on the County permit-requirements page
Important: Exempt from building permit does not mean exempt from zoning or town requirements. Tangier Island is in a coastal area with heightened floodplain and wetlands requirements — even small accessory structures may require a permit in the Special Flood Hazard Area. Confirm with Accomack County and the Town of Tangier before proceeding.
Inspections
How to Schedule
- 757-787-5721 (phone)
- 757-824-5223 (alternate) (phone)
- building@co.accomack.va.us (email)
- ACCESS portal (online)
- Scheduling deadline
- Requests require at least 24 hours notice. Inspections performed within two working days. Contact the County Building Office in advance to confirm inspection scheduling logistics for Tangier Island.
- Inspection hours
- Monday through Friday, 8:30 a.m. to 5:00 p.m., excluding holidays.
Typical inspection sequence: County standard sequence: footing, foundation, slab or under-slab work, framing and structural members before concealment, rough trade inspections before concealment, energy-conservation inspection, flood-elevation certificate checkpoints where applicable, and final inspection.
Additional Resources
- Building code: 2021 Virginia code package administered by Accomack County (effective January 18, 2024).
- Verify contractor license: Virginia DPOR License Lookup
- Zoning information: View zoning info
- Accomack County Permit Requirements
- Flood Protection — Build Responsibly
- License lookup guide: Virginia Contractor License Requirements
- Contract template: Virginia Homeowner-Contractor Agreement
- Virginia hub: Virginia Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Accomack County Building and Zoning Office (building permits and inspections for Tangier) before applying.
Frequently Asked Questions
Town of Tangier Building Permit FAQ
- Do I need a building permit in Town of Tangier, VA?
- Accomack County USBC rules govern the actual building permit. Town-side land-use controls and island-specific requirements may also apply; confirm with the Town and County before starting work.
- How much does a building permit cost in Town of Tangier, VA?
- The minimum permit fee is See Accomack County fee schedule. Residential new construction minimum $173.40 (including 2% state levy); residential alterations minimum $128.52.. Fees are calculated as: County mixed schedule: residential new construction $0.37/sq ft; residential remodeling $0.28/sq ft; administrative flat fees for many permit events..
- How do I apply for a building permit in Town of Tangier, VA?
- 1. Contact the Town of Tangier and the Accomack County Building Office to confirm island-specific logistics, any town-side prerequisites, and whether any additional floodplain, coastal, or wetlands approvals are required. 2. If no separate town-side intake applies, proceed with Accomack County's ordinary building-permit process through the ACCESS portal or at the County Building Office. 3. If the town requires a prerequisite approval, secure that approval before County filing. 4. Complete County plan review, payment, and permit issuance, then post the permit card and schedule inspections as work progresses.
- How long does it take to get a building permit in Town of Tangier, VA?
- Typical processing time is No town-specific estimate found. County inspection requests with at least 24 hours notice will be performed within two working days..
- What work is exempt from building permits in Town of Tangier, VA?
- The following work is generally exempt: Installation of qualifying low-voltage wiring and equipment under the USBC exemption language; One-story detached accessory structures not exceeding 200 square feet, unless another rule applies; Limited roof shingle replacement on an area of 10 feet by 10 feet; Window replacement; Other USBC Section 108.2 exempt work listed on the County permit-requirements page. Note: Exempt from building permit does not mean exempt from zoning or town requirements. Tangier Island is in a coastal area with heightened floodplain and wetlands requirements — even small accessory structures may require a permit in the Special Flood Hazard Area. Confirm with Accomack County and the Town of Tangier before proceeding.
- How do I schedule a building inspection in Town of Tangier, VA?
- Inspections can be scheduled via: 757-787-5721, 757-824-5223 (alternate), building@co.accomack.va.us, ACCESS portal. Requests require at least 24 hours notice. Inspections performed within two working days. Contact the County Building Office in advance to confirm inspection scheduling logistics for Tangier Island..
Need help with your project?
Navigating permits in Town of Tangier can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Accomack County
View all Accomack County jurisdictions →