When a permit is required
Permit triggers and exempt work for Tooele City
Tooele City Code requires a written permit before construction, alteration, repair, removal, or occupancy of a structure, except for work the Building Official determines is minor or exempt.
- Exempt Floor covering installation
- Exempt Painting and attaching wall coverings, and similar finish work
- Exempt Replacement of glazing except where safety glazing is required by the IBC
- Exempt Patching wall surfaces
- Exempt Replacement of light fixtures
- Exempt Replacement of electrical wall outlets and switches
- Exempt Replacement of faucets, washers, and traps when replaced in kind without disturbing trap arm, vents, or drain lines
- Exempt Repair of irrigation pipelines where backflow preventers exist or are not being replaced
- Exempt Addition to a forced-air heating system of no more than two ducts with no more than one register per duct
- Exempt Replacement of filters, belts, and motors in mechanical systems
- Exempt Installation of any number of battery-operated smoke detectors or one 120-volt smoke detector
- Exempt Replacement of sidewalks on private property
- Exempt Installation of one ventilation fan
- Complete application
- Site/property information
- Contractor license information or owner-builder certification
- Plans and supporting documentation sufficient for zoning/building review
- Utility/reimbursement information where applicable
- Building code
- 2021 IBC, 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IEBC, 2021 IECC commercial provisions, 2015 IECC residential provisions, 2023 NEC, ICC/ANSI A117.1-2009, and Utah state amendments.
- Permit validity
- Null and void if work is not commenced within 180 days, or if work is suspended for 180 days or more.
- Owner-builder
- Owner-builders must sign the owner-builder certification and agreement to comply with the Construction Trades Licensing Act.
- Contractor requirements
- State of Utah licensed contractors are required for general, electrical, mechanical, plumbing, and architect/engineer of record where applicable.
Application process
Typical processing: Not generally published for building permits; online application is available.
- 01 Prepare a complete building permit application, including owner/applicant information, parcel and zoning information, valuation, and Utah-licensed contractor information or owner-builder certification.
- 02 Submit through the Tooele City Building Permit Portal; applicants can apply for and pay for building permits online.
- 03 Upload plans and supporting documents. The permit form contemplates plan review, utility/reimbursement review, and zoning/building comments before approval.
- 04 City staff reviews the application for zoning and building compliance and calculates fees using the city fee schedule and IBC rate references.
- 05 Pay fees. The application becomes a permit only after approval signatures and payment of fees.
- 06 Schedule inspections by 4:30 PM the business day before the requested day; inspections are offered in AM or PM windows.
- 07 Keep work exposed for inspection until approved and obtain final approvals before occupancy/use.
Typical processing time: Not generally published for building permits; online application is available.
Source: Tooele City Community Development Department, Building Safety Division ↗
Fee schedule
Tooele City building permit fees
Applicants can apply for and pay for building permits online through the portal.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Schedule inspections in advance with Tooele City inspectors (phone)
- Scheduling deadline
- Requests must be made by 4:30 PM the business day before the requested time. Cancellations must be made by 3:00 PM the business day before.
- Time windows
- AM or PM windows
Typical sequence: Inspections required before any work is covered and before final approval/occupancy.
Frequently asked
Common questions about Tooele City permits
01 Do I need a building permit in Tooele City, UT? ▸
02 How much does a building permit cost in Tooele City, UT? ▸
03 How do I apply for a building permit in Tooele City, UT? ▸
04 How long does it take to get a building permit in Tooele City, UT? ▸
05 What work is exempt from building permits in Tooele City, UT? ▸
06 How do I schedule a building inspection in Tooele City, UT? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Tooele City Community Development Department, Building Safety Division before applying. Jaspector is not legal advice.