City Building Permits
Richfield, UT - 2026 Building Permit Guide
How to apply for a building permit in Richfield, Utah. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
Richfield City handles zoning review and local code enforcement. Building permits are issued by Sevier County Building Department.
- Department
- Richfield City Building and Zoning Department; Building permits issued by Sevier County Building Department
- Address
- 75 East Center, Richfield, UT 84701 (City Hall, Building and Zoning Department in basement)
- Phone
- (435) 896-6439
- Website
- https://richfieldut.gov/
Online Permit Portal
Platform: CityInspect / DocHub • Account required: Yes • Submission: Online only
Application Process
- Contact Richfield City Building and Zoning Department at (435) 896-6439 to confirm zoning requirements, setbacks, and land use restrictions.
- Obtain the Richfield City Zoning Permit and have it completed and signed by Richfield City.
- For large permit projects (houses, garages, commercial): submit the building permit application online through CityInspect with the approved zoning permit attached and all required documents.
- For small permit projects (fences, sheds with no electrical/plumbing under 120 sq. ft.): use the small building permit PDF form.
- For any construction or excavation within city right-of-way, obtain an Encroachment Permit from Richfield City.
- Await plan review and approval by the county building official.
- Receive the issued permit. Post it visibly on the job site before work begins.
- Provide the building permit number when scheduling inspections.
- Obtain final inspection before occupying any new structure.
Typical processing time: Varies; contact Sevier County at (435) 893-0420 or Richfield City at (435) 896-6439 for status.
General Requirements
A permit is required for any structural, electrical, plumbing, or mechanical changes or additions, regardless of project size. All new residential and commercial construction require a permit.
Required Documents
- Richfield City Zoning Permit (approved by city)
- Site plan
- Construction drawings
- Contractor license number (if applicable)
- Owner-builder form (if applicable)
- Permit validity
- Permits become null if work does not commence within 180 days of issuance.
- Building code
- Utah statewide 2021 code package (IBC, IRC, IMC, IPC, IECC, NEC) as adopted under Utah Code Title 15A. Richfield City may have local amendments on file with the UBCC.
- Owner-builder
- Owner-builder exemption available for primary residences under Utah Code Section 58-55-305.
- Contractor requirements
- Any work valued at $3,000 or more requires a Utah-licensed contractor unless the owner-builder exemption applies.
Fees
- Penalty (no permit)
- Double permit fee if work begins before permit is obtained
- Payment note
- Building permit fees are set by Sevier County. Contact county at (435) 893-0420. Richfield City assesses separate impact fees and encroachment permit fees. See impact fees document or contact (435) 896-6439.
Work That Does NOT Require a Permit
- Structures under 120 sq. ft. with no electrical or plumbing
- Repairs or replacement of like-for-like components that do not affect structural, electrical, plumbing, or mechanical systems
- Refinishing work (drywall finishing, flooring, paint)
- Flat cement work (non-structural sidewalks and patios, confirm with city if structural or within right-of-way)
Important: Confirm specific exemptions and project-specific applicability with Richfield City at (435) 896-6439.
Inspections
How to Schedule
- (435) 896-6439 - Ask for building inspector Gaylen Matheson (phone)
- Scheduling deadline
- At least 24 hours in advance.
Typical inspection sequence: Same as Sevier County standard sequence: footing, foundation, rough framing and trades, insulation, drywall, exterior work, final.
Additional Resources
- Building code: Utah statewide 2021 code package (IBC, IRC, IMC, IPC, IECC, NEC) as adopted under Utah Code Title 15A. Richfield City may have local amendments on file with the UBCC.
- Verify contractor license: Utah DOPL Contractor Licensing
- Richfield City website
- Forms and applications
- Frequently asked questions
- Sevier County building permits
- License lookup guide: Utah Contractor License Requirements
- Contract template: Utah Homeowner-Contractor Agreement
- Utah hub: Utah Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Richfield City Building and Zoning Department; Building permits issued by Sevier County Building Department before applying.
Frequently Asked Questions
Richfield Building Permit FAQ
- Do I need a building permit in Richfield, UT?
- A permit is required for any structural, electrical, plumbing, or mechanical changes or additions, regardless of project size. All new residential and commercial construction require a permit.
- How do I apply for a building permit in Richfield, UT?
- 1. Contact Richfield City Building and Zoning Department at (435) 896-6439 to confirm zoning requirements, setbacks, and land use restrictions. 2. Obtain the Richfield City Zoning Permit and have it completed and signed by Richfield City. 3. For large permit projects (houses, garages, commercial): submit the building permit application online through CityInspect with the approved zoning permit attached and all required documents. 4. For small permit projects (fences, sheds with no electrical/plumbing under 120 sq. ft.): use the small building permit PDF form. 5. For any construction or excavation within city right-of-way, obtain an Encroachment Permit from Richfield City. 6. Await plan review and approval by the county building official. 7. Receive the issued permit. Post it visibly on the job site before work begins. 8. Provide the building permit number when scheduling inspections. 9. Obtain final inspection before occupying any new structure.
- How long does it take to get a building permit in Richfield, UT?
- Typical processing time is Varies; contact Sevier County at (435) 893-0420 or Richfield City at (435) 896-6439 for status..
- What work is exempt from building permits in Richfield, UT?
- The following work is generally exempt: Structures under 120 sq. ft. with no electrical or plumbing; Repairs or replacement of like-for-like components that do not affect structural, electrical, plumbing, or mechanical systems; Refinishing work (drywall finishing, flooring, paint); Flat cement work (non-structural sidewalks and patios, confirm with city if structural or within right-of-way). Note: Confirm specific exemptions and project-specific applicability with Richfield City at (435) 896-6439.
- How do I schedule a building inspection in Richfield, UT?
- Inspections can be scheduled via: (435) 896-6439 - Ask for building inspector Gaylen Matheson. At least 24 hours in advance..
Need help with your project?
Navigating permits in Richfield can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Sevier County
View all Sevier County jurisdictions →