On this page 6
When a permit is required
Permit triggers and exempt work for Blanding
Building permits are required for new construction, before moving a trailer or pre-built home onto a lot, and for any addition, remodeling, or demolition. Electrical, mechanical, plumbing, and structural work also require permits.
- Exempt One-story detached accessory structures (tool sheds, storage sheds, playhouses) with floor area of 120 square feet or less
- Exempt Fences not more than 7 feet in height
- Exempt Retaining walls not more than 4 feet in height (bottom of footing to top of wall), unless supporting a surcharge
- Exempt Ordinary repair and maintenance not affecting structural, fire, life-safety, or egress conditions
Note: Blanding has not posted a separate expanded public exemption list. Confirm with Building Inspector Taylor Francom before assuming any work is exempt.
- Completed permit application
- Complete set of plans drawn to scale
- Property legal description and tax parcel number
- Utah DOPL contractor license information for all contractors
- Owner-builder certification if applicable
- Building code
- Blanding City follows the Utah State Construction Code under Title 15A (2021 IBC, 2021 IRC, 2021 IMC, 2021 IPC, 2021 IECC, NEC). No separate local adoption ordinance found in public sources; statewide codes apply.
- Permit validity
- Follows Utah statewide practice (180-day inspection interval minimum). Confirm with Building Inspector Taylor Francom.
- Owner-builder
- Utah DOPL owner-builder rules apply. For single-family residential projects, property owners may serve as their own contractor subject to the Construction Trades Licensing Act requirements including worker's compensation coverage.
- Contractor requirements
- Utah DOPL licensing required for all licensed trades and for general contracting on projects at or above the DOPL threshold.
Application process
Typical processing: Not publicly posted. Permit volume from January to April 2025 included 20 permits and 33 inspections, indicating an active but small permit office. Processing times likely measured in days to a few weeks depending on project complexity.
- 01 Confirm the property is within Blanding City limits.
- 02 Contact the Building and Zoning Department at (435) 678-2791 or visit the city office at 50 West 100 South during business hours.
- 03 Obtain the building permit application form from the city office or city website.
- 04 Submit a complete set of plans drawn to scale. The city reviews plans for code compliance.
- 05 Provide property legal description and parcel number.
- 06 List all contractors and subcontractors with Utah DOPL license information. For owner-builder projects, submit the applicable owner-builder certification.
- 07 Pay fees per the Blanding City Fee Schedule.
- 08 Permit is issued. Permit card with required inspections is provided.
- 09 Schedule inspections by contacting the city building department by phone.
- 10 Complete all required inspections. Obtain final inspection and Certificate of Occupancy.
Typical processing time: Not publicly posted. Permit volume from January to April 2025 included 20 permits and 33 inspections, indicating an active but small permit office. Processing times likely measured in days to a few weeks depending on project complexity.
Fee schedule
Blanding building permit fees
In-person at city office. Online payment availability to be confirmed given CityInspect rollout underway.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- (435) 678-2791 (phone)
- Inspection hours
- Monday through Thursday 7:30 a.m. to 5:30 p.m.; Friday 7:30 a.m. to 11:30 a.m.
Typical sequence: Per Utah IBC/IRC standards: setback, footing, foundation, underground utilities, rough framing, rough mechanical/electrical/plumbing, insulation, final. Specific sequence noted on the permit card.
CityInspect implementation as of May 2025 may add online inspection scheduling; verify current method with the city.
Frequently asked
Common questions about Blanding permits
01 Do I need a building permit in Blanding, UT? ▸
02 How do I apply for a building permit in Blanding, UT? ▸
03 How long does it take to get a building permit in Blanding, UT? ▸
04 What work is exempt from building permits in Blanding, UT? ▸
05 How do I schedule a building inspection in Blanding, UT? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Blanding City Building and Zoning Department before applying. Jaspector is not legal advice.