How to apply for a building permit in Town of Holden, Utah. Permit authority, application steps, fees, and inspection requirements.

Avg processing
Not publicly stated; contact the town.
Last verified
April 2026
On this page 5
§ 01

Permit authority

Holden Town Office / Holden Town Council

Street address
PO Box 127, Holden, UT 84636
Coverage
Applies inside Holden town limits; very small agricultural community in northern Millard County; public permit data is extremely thin.
Online portal
Holden Town Website
§ 02

When a permit is required

Permit triggers and exempt work for Holden

Construction and regulated building activity within Holden town limits.

One-story detached accessory structures used as tool and storage sheds, playhouses, and similar structures, provided the floor area does not exceed 200 square feet
Fences not over 7 feet high
Retaining walls not over 4 feet in height measured from the bottom of the footing, not supporting surcharge
Ordinary repairs, including replacement of existing fixtures
Painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work
Prefabricated swimming pools less than 24 inches deep
  • Exempt One-story detached accessory structures used as tool and storage sheds, playhouses, and similar structures, provided the floor area does not exceed 200 square feet
  • Exempt Fences not over 7 feet high
  • Exempt Retaining walls not over 4 feet in height measured from the bottom of the footing, not supporting surcharge
  • Exempt Ordinary repairs, including replacement of existing fixtures
  • Exempt Painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work
  • Exempt Prefabricated swimming pools less than 24 inches deep

Note: No Holden-specific exemption page was located. Exemptions default to Utah-adopted IRC Section R105.2 and IBC Section 105.2 standards. Verify with the town before treating any work as exempt.

Required documents
  • Contact the town for the current application and documents list
Building code
Utah statewide 2021 IBC, 2021 IRC, 2021 IMC, 2021 IPC, 2021 IECC, and current NEC apply as the statewide baseline.
Permit validity
Not publicly stated; default Utah-adopted 180-day standard likely applies unless locally amended; confirm with the town.
Owner-builder
Not publicly indexed; Utah Code Section 58-55-305 governs state owner-builder exemptions.
Contractor requirements
Utah DOPL state contractor license required.
§ 03

Application process

Typical processing: Not publicly stated; contact the town.

  1. 01
    Contact the Holden Town Office by phone (435-795-2213) or email (holdentown.utah@gmail.com) to obtain building permit application forms and requirements.
  2. 02
    Prepare project plans and supporting documentation.
  3. 03
    Submit the completed application and plan set to the town office as directed.
  4. 04
    Pay applicable fees per the town's current fee schedule.
  5. 05
    Obtain permit issuance and schedule required inspections through the town's process.

Typical processing time: Not publicly stated; contact the town.

Source: Holden Town Office / Holden Town Council ↗

§ 04

Required inspections

Scheduling and sequence

How to schedule
  • 435-795-2213 (phone)
Inspection hours
Not publicly stated.

Typical sequence: Project-specific; not separately published.

§ 05

Frequently asked

Common questions about Holden permits

01 Do I need a building permit in Holden, UT?
Construction and regulated building activity within Holden town limits.
02 How do I apply for a building permit in Holden, UT?
To apply for a building permit in Holden, UT, follow these steps: 1. Contact the Holden Town Office by phone (435-795-2213) or email (holdentown.utah@gmail.com) to obtain building permit application forms and requirements. 2. Prepare project plans and supporting documentation. 3. Submit the completed application and plan set to the town office as directed. 4. Pay applicable fees per the town's current fee schedule. 5. Obtain permit issuance and schedule required inspections through the town's process.
03 How long does it take to get a building permit in Holden, UT?
Building permit processing times in Holden, UT typically run Not publicly stated; contact the town.. Timelines can vary based on project complexity and current department workload.
04 What work is exempt from building permits in Holden, UT?
Not all construction work requires a permit in Holden, UT. The following work is generally exempt: One-story detached accessory structures used as tool and storage sheds, playhouses, and similar structures, provided the floor area does not exceed 200 square feet; Fences not over 7 feet high; Retaining walls not over 4 feet in height measured from the bottom of the footing, not supporting surcharge; Ordinary repairs, including replacement of existing fixtures; Painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work; Prefabricated swimming pools less than 24 inches deep. Note: No Holden-specific exemption page was located. Exemptions default to Utah-adopted IRC Section R105.2 and IBC Section 105.2 standards. Verify with the town before treating any work as exempt. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Holden, UT?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Holden, UT via: 435-795-2213.
last verified April 2026 source Holden Town Office / Holden Town Council ↗ entry id permits/utah/millard/holden

Educational reference. Permit rules and fees change — confirm current requirements directly with Holden Town Office / Holden Town Council before applying. Jaspector is not legal advice.