On this page 6
When a permit is required
Permit triggers and exempt work for Brian Head
Every new construction project, addition, remodel, tree removal, grading, exterior painting/re-roofing, and any other work regulated under adopted building and land management codes. The scope of permit requirements in Brian Head is notably broad due to the resort environment and fire/snow-load hazards.
Note: No Brian Head-specific exemption list was located in indexed sources; applicable Utah statewide IRC R105.2 / IBC 105.2 exemptions apply as a baseline. Given the broad scope of permit requirements explicitly stated by Brian Head Town (including tree removal, painting, re-roofing), applicants should confirm with 435-677-2029 before assuming any work is exempt. Fire mitigation tree/logging removal: No fee but still requires a logging/tree removal permit.
- Clear and precise plans showing applicant name, property address, phone number, and preparer contact
- Geotechnical report if lot has 25% slope or greater (stamped by Utah-licensed engineer)
- Energy code compliance
- Structural calculations for snow loads at high elevation
- Contractor DOPL license information
- Owner-builder documentation if applicable
- Building code
- 2021 IBC, 2021 IRC, and Utah statewide adopted codes per Title 15A; Brian Head's Land Management Code governs zoning and land use
- Permit validity
- Not separately stated for Brian Head; standard Utah adopted code period applies; contact 435-677-2029
- Owner-builder
- Utah DOPL rules apply; contact department for Brian Head-specific requirements
- Contractor requirements
- Utah DOPL contractor license required; licensed contractor verification required for any work in public right-of-way
Application process
Typical processing: Not publicly stated; contact 435-677-2029
- 01 Confirm project scope and applicable Brian Head Land Management Code requirements; contact 435-677-2029.
- 02 For projects on lots with 25% slope or greater: a geotechnical report prepared and stamped by a Utah-licensed engineer is required before permit can be processed.
- 03 For grading or work in any public right-of-way: a Trenching and Grading Permit is required separately and a $5,000 encroachment bond (paved road) or $3,500 encroachment bond (unpaved road) plus $1,000,000 insurance policy naming Brian Head Town as additional insured must be on file.
- 04 Create a City Inspect account at brianhead.cityinspect.com or log in.
- 05 Submit permit application and upload all required documents online; plans must display applicant name, property address, phone number, and preparer company name, address, and phone.
- 06 Pay fees at permit issuance.
- 07 Post Building Permit Cleanup Bond ($1,000 refundable) and Grading and Landscaping Bond ($2,500 refundable) if required.
- 08 Schedule inspections through City Inspect portal.
Typical processing time: Not publicly stated; contact 435-677-2029
Fee schedule
Effective July 1, 2025
Fees change periodically. Confirm at the official fee schedule ↗ (effective July 1, 2025) before budgeting.
Required inspections
Scheduling and sequence
Frequently asked
Common questions about Brian Head permits
01 Do I need a building permit in Brian Head, UT? ▸
02 How much does a building permit cost in Brian Head, UT? ▸
03 How do I apply for a building permit in Brian Head, UT? ▸
04 How long does it take to get a building permit in Brian Head, UT? ▸
05 How do I schedule a building inspection in Brian Head, UT? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Brian Head Town Planning and Building Department before applying. Jaspector is not legal advice.