City Building Permits

Huntington, UT - 2026 Building Permit Guide

How to apply for a building permit in Huntington, Utah. Permit authority, application steps, fees, and inspection requirements.

Utah Emery County Updated March 2026

Permit Authority

City of Huntington city limits. Zoning clearance is a city function; building permit issuance and inspections are coordinated with Emery County B&Z.

Department
City of Huntington (coordinates with Emery County B&Z for building permits)
Address
20 South Main Street, Huntington, UT 84528
Phone
(435) 687-2876

Application Process

  1. Contact Huntington City Hall at (435) 687-2876 to initiate the process.
  2. Obtain zoning clearance from the city confirming that the proposed use and structure are permitted.
  3. Submit the county building permit application with zoning clearance documentation and required construction drawings to Emery County B&Z.
  4. Pay permit fees.
  5. Await plan review (24 hours to several weeks).
  6. Receive issued permit. Post on site.
  7. Schedule inspections through county B&Z at (435) 381-5374 with 24 to 48 hours advance notice.
  8. Pass final inspection; receive Certificate of Occupancy.

Typical processing time: 24 hours to several weeks depending on complexity

Source: City of Huntington (coordinates with Emery County B&Z for building permits)

General Requirements

A building permit is required for all new construction. Outbuildings 200 sq ft and over require a permit. All structures including porches, decks, and patios require permits. Zoning clearance required from city first.

Required Documents

  • City zoning clearance
  • County permit application
  • Site plan
  • Construction drawings
  • Owner-builder certification or contractor license information
Permit validity
180 days to commence; 180 days without suspension (county rules apply).
Building code
2021 code suite per Utah Title 15A: IBC 2021, IRC 2021, IMC 2021, IPC 2021, IFGC 2021, NEC 2020, IECC 2021, Existing Building Code 2021, Utah Wildland Urban Interface Code.
Owner-builder
Same statewide rules apply per Utah Code Section 58-55-305.
Contractor requirements
Utah DOPL license required for work valued at $3,000 or more.

Fees

Minimum permit fee
$50
Permit fee formula
Project valuation

Fees change. Verify current amounts at the official fee schedule (effective 2025).

Work That Does NOT Require a Permit

  • Detached accessory structures with floor area of 200 sq ft or less
  • Fences not over 7 feet high
  • Oil derricks
  • Retaining walls not over 4 feet in height
  • Water tanks supported directly on grade, not exceeding 5,000 gallons
  • Sidewalks and driveways not more than 30 inches above adjacent grade
  • Painting, papering, tiling, carpeting, cabinets, counter tops, and similar finish work
  • Prefabricated swimming pools less than 24 inches deep, not greater than 5,000 gallons, installed entirely above ground
  • Swings and playground equipment accessory to detached one- and two-family dwellings
  • Window awnings supported by exterior wall
  • Agricultural shade cloth structures

Important: Structures under 200 sq ft still require zoning clearance from the city. Exemption from permit does not authorize violation of adopted codes.

Inspections

How to Schedule

  • (435) 381-5374 (phone)
Scheduling deadline
24 to 48 hours advance notice required
Inspection hours
Monday through Friday, 8:30 AM to 5:00 PM

Typical inspection sequence: Same as county: footing/foundation reinforcement, rebar, under-concrete floor inspection, stitch and lag pier (manufactured homes), rough framing, rough plumbing, rough electrical, rough mechanical, insulation, power to panel, notification for exterior finishes/roofing/fireplace, rough drywall, gas line pressure test, masonry, final inspection.

Do not cover or conceal any work that requires inspection.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the City of Huntington (coordinates with Emery County B&Z for building permits) before applying.

Frequently Asked Questions

Huntington Building Permit FAQ

Do I need a building permit in Huntington, UT?
A building permit is required for all new construction. Outbuildings 200 sq ft and over require a permit. All structures including porches, decks, and patios require permits. Zoning clearance required from city first.
How much does a building permit cost in Huntington, UT?
The minimum permit fee is $50. Fees are calculated as: Project valuation.
How do I apply for a building permit in Huntington, UT?
1. Contact Huntington City Hall at (435) 687-2876 to initiate the process. 2. Obtain zoning clearance from the city confirming that the proposed use and structure are permitted. 3. Submit the county building permit application with zoning clearance documentation and required construction drawings to Emery County B&Z. 4. Pay permit fees. 5. Await plan review (24 hours to several weeks). 6. Receive issued permit. Post on site. 7. Schedule inspections through county B&Z at (435) 381-5374 with 24 to 48 hours advance notice. 8. Pass final inspection; receive Certificate of Occupancy.
How long does it take to get a building permit in Huntington, UT?
Typical processing time is 24 hours to several weeks depending on complexity.
What work is exempt from building permits in Huntington, UT?
The following work is generally exempt: Detached accessory structures with floor area of 200 sq ft or less; Fences not over 7 feet high; Oil derricks; Retaining walls not over 4 feet in height; Water tanks supported directly on grade, not exceeding 5,000 gallons; Sidewalks and driveways not more than 30 inches above adjacent grade; Painting, papering, tiling, carpeting, cabinets, counter tops, and similar finish work; Prefabricated swimming pools less than 24 inches deep, not greater than 5,000 gallons, installed entirely above ground; Swings and playground equipment accessory to detached one- and two-family dwellings; Window awnings supported by exterior wall; Agricultural shade cloth structures. Note: Structures under 200 sq ft still require zoning clearance from the city. Exemption from permit does not authorize violation of adopted codes.
How do I schedule a building inspection in Huntington, UT?
Inspections can be scheduled via: (435) 381-5374. 24 to 48 hours advance notice required.

Need help with your project?

Navigating permits in Huntington can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.