City Building Permits
Huntington, UT - 2026 Building Permit Guide
How to apply for a building permit in Huntington, Utah. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
City of Huntington city limits. Zoning clearance is a city function; building permit issuance and inspections are coordinated with Emery County B&Z.
- Department
- City of Huntington (coordinates with Emery County B&Z for building permits)
- Address
- 20 South Main Street, Huntington, UT 84528
- Phone
- (435) 687-2876
- Website
- https://huntingtonut.com/
Application Process
- Contact Huntington City Hall at (435) 687-2876 to initiate the process.
- Obtain zoning clearance from the city confirming that the proposed use and structure are permitted.
- Submit the county building permit application with zoning clearance documentation and required construction drawings to Emery County B&Z.
- Pay permit fees.
- Await plan review (24 hours to several weeks).
- Receive issued permit. Post on site.
- Schedule inspections through county B&Z at (435) 381-5374 with 24 to 48 hours advance notice.
- Pass final inspection; receive Certificate of Occupancy.
Typical processing time: 24 hours to several weeks depending on complexity
Source: City of Huntington (coordinates with Emery County B&Z for building permits)
General Requirements
A building permit is required for all new construction. Outbuildings 200 sq ft and over require a permit. All structures including porches, decks, and patios require permits. Zoning clearance required from city first.
Required Documents
- City zoning clearance
- County permit application
- Site plan
- Construction drawings
- Owner-builder certification or contractor license information
- Permit validity
- 180 days to commence; 180 days without suspension (county rules apply).
- Building code
- 2021 code suite per Utah Title 15A: IBC 2021, IRC 2021, IMC 2021, IPC 2021, IFGC 2021, NEC 2020, IECC 2021, Existing Building Code 2021, Utah Wildland Urban Interface Code.
- Owner-builder
- Same statewide rules apply per Utah Code Section 58-55-305.
- Contractor requirements
- Utah DOPL license required for work valued at $3,000 or more.
Fees
- Minimum permit fee
- $50
- Permit fee formula
- Project valuation
Fees change. Verify current amounts at the official fee schedule (effective 2025).
Work That Does NOT Require a Permit
- Detached accessory structures with floor area of 200 sq ft or less
- Fences not over 7 feet high
- Oil derricks
- Retaining walls not over 4 feet in height
- Water tanks supported directly on grade, not exceeding 5,000 gallons
- Sidewalks and driveways not more than 30 inches above adjacent grade
- Painting, papering, tiling, carpeting, cabinets, counter tops, and similar finish work
- Prefabricated swimming pools less than 24 inches deep, not greater than 5,000 gallons, installed entirely above ground
- Swings and playground equipment accessory to detached one- and two-family dwellings
- Window awnings supported by exterior wall
- Agricultural shade cloth structures
Important: Structures under 200 sq ft still require zoning clearance from the city. Exemption from permit does not authorize violation of adopted codes.
Inspections
How to Schedule
- (435) 381-5374 (phone)
- Scheduling deadline
- 24 to 48 hours advance notice required
- Inspection hours
- Monday through Friday, 8:30 AM to 5:00 PM
Typical inspection sequence: Same as county: footing/foundation reinforcement, rebar, under-concrete floor inspection, stitch and lag pier (manufactured homes), rough framing, rough plumbing, rough electrical, rough mechanical, insulation, power to panel, notification for exterior finishes/roofing/fireplace, rough drywall, gas line pressure test, masonry, final inspection.
Do not cover or conceal any work that requires inspection.
Additional Resources
- Building code: 2021 code suite per Utah Title 15A: IBC 2021, IRC 2021, IMC 2021, IPC 2021, IFGC 2021, NEC 2020, IECC 2021, Existing Building Code 2021, Utah Wildland Urban Interface Code.
- Verify contractor license: Utah DOPL Contractor Licensing
- Zoning information: View zoning info
- City website
- License lookup guide: Utah Contractor License Requirements
- Contract template: Utah Homeowner-Contractor Agreement
- Utah hub: Utah Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the City of Huntington (coordinates with Emery County B&Z for building permits) before applying.
Frequently Asked Questions
Huntington Building Permit FAQ
- Do I need a building permit in Huntington, UT?
- A building permit is required for all new construction. Outbuildings 200 sq ft and over require a permit. All structures including porches, decks, and patios require permits. Zoning clearance required from city first.
- How much does a building permit cost in Huntington, UT?
- The minimum permit fee is $50. Fees are calculated as: Project valuation.
- How do I apply for a building permit in Huntington, UT?
- 1. Contact Huntington City Hall at (435) 687-2876 to initiate the process. 2. Obtain zoning clearance from the city confirming that the proposed use and structure are permitted. 3. Submit the county building permit application with zoning clearance documentation and required construction drawings to Emery County B&Z. 4. Pay permit fees. 5. Await plan review (24 hours to several weeks). 6. Receive issued permit. Post on site. 7. Schedule inspections through county B&Z at (435) 381-5374 with 24 to 48 hours advance notice. 8. Pass final inspection; receive Certificate of Occupancy.
- How long does it take to get a building permit in Huntington, UT?
- Typical processing time is 24 hours to several weeks depending on complexity.
- What work is exempt from building permits in Huntington, UT?
- The following work is generally exempt: Detached accessory structures with floor area of 200 sq ft or less; Fences not over 7 feet high; Oil derricks; Retaining walls not over 4 feet in height; Water tanks supported directly on grade, not exceeding 5,000 gallons; Sidewalks and driveways not more than 30 inches above adjacent grade; Painting, papering, tiling, carpeting, cabinets, counter tops, and similar finish work; Prefabricated swimming pools less than 24 inches deep, not greater than 5,000 gallons, installed entirely above ground; Swings and playground equipment accessory to detached one- and two-family dwellings; Window awnings supported by exterior wall; Agricultural shade cloth structures. Note: Structures under 200 sq ft still require zoning clearance from the city. Exemption from permit does not authorize violation of adopted codes.
- How do I schedule a building inspection in Huntington, UT?
- Inspections can be scheduled via: (435) 381-5374. 24 to 48 hours advance notice required.
Need help with your project?
Navigating permits in Huntington can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Emery County
View all Emery County jurisdictions →