jaspector
§ UT Cache County
City building permits

City of Smithfield

How to apply for a building permit in City of Smithfield, Utah. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Smithfield City Community Development (local review) / Cache County Development Services Building Division (building permits)

Street address
96 S Main St, Smithfield, UT 84335; Cache County Development Services, 179 N Main St, Suite 305, Logan, UT 84321
Coverage
Smithfield handles local zoning/subdivision/community-development approvals. Cache County issues building permits and inspections for Smithfield projects.
§ 02

When a permit is required

Permit triggers and exempt work for Smithfield

Regulated construction requires local zoning compliance and a building permit issued by Cache County.

Small detached accessory structures up to 200 square feet
Fences up to 7 feet
Certain low retaining walls
Minor nonstructural repairs
  • Exempt Small detached accessory structures up to 200 square feet
  • Exempt Fences up to 7 feet
  • Exempt Certain low retaining walls
  • Exempt Minor nonstructural repairs

Note: Utah/Cache County baseline exemptions generally apply unless local conditions require review.

Required documents
  • City planning/zoning approvals as needed
  • Site plan
  • County application
  • Construction drawings
  • Valuation
  • Engineering where applicable
Building code
Utah State Construction Code, enforced for Smithfield permits through Cache County.
Owner-builder
No Smithfield-specific handout clearly located; Utah owner-builder rules apply.
Contractor requirements
Utah contractor licensure applies where required by state law.

Source: Smithfield City Community Development (local review) / Cache County Development Services Building Division (building permits) ↗

§ 03

Application process

Typical processing: No Smithfield-specific estimate clearly published.

  1. 01
    Confirm Smithfield Community Development requirements, including zoning, subdivision, and land-use approvals.
  2. 02
    Secure local zoning clearance or planning sign-off as required by Smithfield before county permit issuance.
  3. 03
    Submit the building permit application and plan package to Cache County Building Division.
  4. 04
    Revise plans if comments are returned by county staff or outside reviewers.
  5. 05
    Pay county fees after approval.
  6. 06
    Receive the permit from Cache County and call for required inspections.

Typical processing time: No Smithfield-specific estimate clearly published.

Source: Smithfield City Community Development (local review) / Cache County Development Services Building Division (building permits) ↗

§ 04

Fee schedule

Effective 2024

Fee type
Amount
01
Minimum permit fee
$50 demolition; $75 for many trade permits
02
Plan check fee
15% of base fee for residential; 65% for many commercial
03
Permit fee formula
Flat and valuation-based
04
Trade permit fee
$75 typical
05
Reinspection fee
$75

Paid to Cache County after permit approval.

Fees change periodically. Confirm at the official fee schedule ↗ (effective 2024) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • 435-755-1650 (phone)

Typical sequence: Typical county residential sequence is footing/foundation, roughs, framing, insulation where required, and final.

Source: Smithfield City Community Development (local review) / Cache County Development Services Building Division (building permits) ↗

§ 06

Frequently asked

Common questions about Smithfield permits

01 Do I need a building permit in Smithfield, UT?
Regulated construction requires local zoning compliance and a building permit issued by Cache County.
02 How much does a building permit cost in Smithfield, UT?
Building permit fees in Smithfield, UT are set by the local building department and vary by project type and valuation. The minimum permit fee is $50 demolition; $75 for many trade permits. Fees are calculated as: Flat and valuation-based. Plan check fee: 15% of base fee for residential; 65% for many commercial.
03 How do I apply for a building permit in Smithfield, UT?
To apply for a building permit in Smithfield, UT, follow these steps: 1. Confirm Smithfield Community Development requirements, including zoning, subdivision, and land-use approvals. 2. Secure local zoning clearance or planning sign-off as required by Smithfield before county permit issuance. 3. Submit the building permit application and plan package to Cache County Building Division. 4. Revise plans if comments are returned by county staff or outside reviewers. 5. Pay county fees after approval. 6. Receive the permit from Cache County and call for required inspections.
04 How long does it take to get a building permit in Smithfield, UT?
Building permit processing times in Smithfield, UT typically run No Smithfield-specific estimate clearly published.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Smithfield, UT?
Not all construction work requires a permit in Smithfield, UT. The following work is generally exempt: Small detached accessory structures up to 200 square feet; Fences up to 7 feet; Certain low retaining walls; Minor nonstructural repairs. Note: Utah/Cache County baseline exemptions generally apply unless local conditions require review. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Smithfield, UT?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Smithfield, UT via: 435-755-1650.

Educational reference. Permit rules and fees change — confirm current requirements directly with Smithfield City Community Development (local review) / Cache County Development Services Building Division (building permits) before applying. Jaspector is not legal advice.