jaspector
§ TX Nolan County
County building permits

Unincorporated Nolan County

How to apply for a building permit in unincorporated Nolan County, Texas. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 5
§ 01

Permit authority

Nolan County (Floodplain contact); TCEQ Region 3 (OSSF permitting authority)

Street address
100 East Third, Suite 105, Sweetwater, TX 79556 (County Judge / courthouse); 1977 Industrial Blvd, Abilene, TX 79602-7833 (TCEQ Region 3 OSSF office)
Coverage
All properties in unincorporated Nolan County.
§ 02

When a permit is required

Permit triggers and exempt work for Nolan County

No public Nolan County source reviewed here documents a countywide general building permit requirement for ordinary construction in unincorporated areas. Floodplain development controls may apply in mapped flood hazard areas. For OSSF work, TCEQ states almost all on-site sewage facilities require a permit prior to construction, installation, repair, extension, or other alteration unless a specific exception such as grandfathering or the 10-acre rule applies.

For OSSF work only: permit may not be required if the system is grandfathered or qualifies under the 10-acre rule
  • Exempt For OSSF work only: permit may not be required if the system is grandfathered or qualifies under the 10-acre rule

Note: No public Nolan County exempt-work list for a general building permit program was found.

Required documents
  • For OSSF work: owner information, property information, site evaluation, design details, and other materials required under 30 TAC Chapter 285
Permit validity
For OSSF work, TCEQ states an authorization to construct is valid for one calendar year from issuance.
Owner-builder
For OSSF work, TCEQ states work must be performed by a licensed installer or directly by the homeowner when it is their single-family residence.
Contractor requirements
For OSSF work, licensed installer requirements under TCEQ rules apply unless the homeowner exception applies.
§ 03

Application process

Typical processing: OSSF permits: permitting authority must approve or deny application within 30 days of receipt.

  1. 01
    Determine whether the parcel is outside all city limits and in unincorporated Nolan County.
  2. 02
    For ordinary building construction, do not assume a county building permit exists. No public Nolan County source documents a countywide general building permit program.
  3. 03
    If the project is in or near a mapped flood hazard area, contact the Nolan County Judge / floodplain contact before site work or development.
  4. 04
    If the project includes an on-site sewage facility or septic system, use the TCEQ OSSF process for Nolan County. TCEQ OARS lists TCEQ Region 3 as the state permitting authority for Nolan County.
  5. 05
    For OSSF work, prepare the permit application and planning materials required by TCEQ rules and submit them to the permitting authority.
  6. 06
    Wait for approval or denial. TCEQ states the permitting authority must approve or deny OSSF planning materials and the permit application within 30 days of receipt.
  7. 07
    Before covering the system, the installer must notify the permitting authority at least five working days before the OSSF is ready for inspection.
  8. 08
    Do not place the system into service until inspection and approval are complete.

Typical processing time: OSSF permits: permitting authority must approve or deny application within 30 days of receipt.

Source: Nolan County (Floodplain contact); TCEQ Region 3 (OSSF permitting authority) ↗

§ 04

Required inspections

Scheduling and sequence

How to schedule
  • (325) 235-2263 (phone)
Scheduling deadline
For OSSF inspections, installer shall notify the permitting authority at least five working days before the OSSF is ready for inspection.
Inspection hours
TCEQ Region 3 OSSF office: Monday through Friday, 8:00 a.m. to 5:00 p.m.

Typical sequence: Verify unincorporated county location; confirm whether floodplain review applies; for OSSF work, submit planning materials and permit application; obtain authorization to construct; install system; request inspection at least five working days before ready; receive approval before operation.

§ 05

Frequently asked

Common questions about unincorporated Nolan County permits

01 Do I need a building permit in unincorporated Nolan County, TX?
No public Nolan County source reviewed here documents a countywide general building permit requirement for ordinary construction in unincorporated areas. Floodplain development controls may apply in mapped flood hazard areas. For OSSF work, TCEQ states almost all on-site sewage facilities require a permit prior to construction, installation, repair, extension, or other alteration unless a specific exception such as grandfathering or the 10-acre rule applies.
02 How do I apply for a building permit in unincorporated Nolan County, TX?
To apply for a building permit in unincorporated Nolan County, TX, follow these steps: 1. Determine whether the parcel is outside all city limits and in unincorporated Nolan County. 2. For ordinary building construction, do not assume a county building permit exists. No public Nolan County source documents a countywide general building permit program. 3. If the project is in or near a mapped flood hazard area, contact the Nolan County Judge / floodplain contact before site work or development. 4. If the project includes an on-site sewage facility or septic system, use the TCEQ OSSF process for Nolan County. TCEQ OARS lists TCEQ Region 3 as the state permitting authority for Nolan County. 5. For OSSF work, prepare the permit application and planning materials required by TCEQ rules and submit them to the permitting authority. 6. Wait for approval or denial. TCEQ states the permitting authority must approve or deny OSSF planning materials and the permit application within 30 days of receipt. 7. Before covering the system, the installer must notify the permitting authority at least five working days before the OSSF is ready for inspection. 8. Do not place the system into service until inspection and approval are complete.
03 How long does it take to get a building permit in unincorporated Nolan County, TX?
Building permit processing times in unincorporated Nolan County, TX typically run OSSF permits: permitting authority must approve or deny application within 30 days of receipt.. Timelines can vary based on project complexity and current department workload.
04 What work is exempt from building permits in unincorporated Nolan County, TX?
Not all construction work requires a permit in unincorporated Nolan County, TX. The following work is generally exempt: For OSSF work only: permit may not be required if the system is grandfathered or qualifies under the 10-acre rule. Note: No public Nolan County exempt-work list for a general building permit program was found. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in unincorporated Nolan County, TX?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in unincorporated Nolan County, TX via: (325) 235-2263. For OSSF inspections, installer shall notify the permitting authority at least five working days before the OSSF is ready for inspection..
last verified April 2026 source Nolan County (Floodplain contact); TCEQ Region 3 (OSSF permitting authority) ↗ entry id permits/texas/nolan/unincorporated

Educational reference. Permit rules and fees change — confirm current requirements directly with Nolan County (Floodplain contact); TCEQ Region 3 (OSSF permitting authority) before applying. Jaspector is not legal advice.