jaspector
City building permits

City of Junction

How to apply for a building permit in City of Junction, Texas. Permit authority, application steps, fees, and inspection requirements.

Min. permit fee
$50.00
Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Junction, Mayor's Office

Street address
730 Main St, Junction, TX 76849
Coverage
All properties within the incorporated City of Junction.
§ 02

When a permit is required

Permit triggers and exempt work for Junction

A building permit is required before constructing, reconstructing, renovating, or adding to any building or other structure within city limits. A floodplain development permit is required for development covered by the flood damage prevention ordinance. A plumbing permit is required before beginning plumbing installation or alteration work.

Repair only to an existing building or structure
Additions to existing construction that do not increase floor space by 25 square feet or more
Proposed new construction of any building requires a permit regardless of square footage
  • Exempt Repair only to an existing building or structure
  • Exempt Additions to existing construction that do not increase floor space by 25 square feet or more
  • Exempt Proposed new construction of any building requires a permit regardless of square footage

Note: Repair exemptions apply narrowly; additions and new construction generally require permits. Confirm edge cases with City Hall before proceeding.

Required documents
  • Building permit application in writing to the mayor
  • Legal description and street address
  • Plans and specifications
  • Estimated cost
  • Construction material description
  • Site layout information including location and distance to nearest property line of each outside wall
  • For floodplain work: plans in duplicate and required elevation, floodproofing, certification, and drainage or watercourse information
Building code
International Building Code, 2003 edition, together with the rehabilitation code. Uniform Plumbing Code, 2003 edition. Separate Junction articles for residential code and electricity also apply. Flood damage prevention ordinance in Chapter 3, Article 3.09.
Owner-builder
For plumbing permits, a homeowner may receive a permit to install or alter plumbing in a single-family residence if the homeowner performs the work and the building is owned and occupied by the owner as a home.
Contractor requirements
The plumbing ordinance states only persons legally authorized to do plumbing may be issued plumbing permits.

Source: City of Junction, Mayor's Office ↗

§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Confirm the property is inside Junction city limits.
  2. 02
    Determine whether the work triggers the city building-permit ordinance (construction, reconstruction, renovation, or addition to a building or structure).
  3. 03
    Prepare the written application to the mayor on city forms, including legal description, street address, plans and specifications, estimated cost, building material, and location and distance to nearest property lines of each outside wall.
  4. 04
    Pay the building permit fee of $50.00 at filing.
  5. 05
    Wait for city investigation and decision by the mayor.
  6. 06
    If the site is in a special flood hazard area, also submit a floodplain development permit application to the floodplain administrator.
  7. 07
    Keep the work consistent with submitted plans; city may inspect and revoke or suspend permit if work materially deviates from approved application.
  8. 08
    If permit is denied, suspended, or revoked, applicant may appeal to city council.

Source: City of Junction, Mayor's Office ↗

§ 04

Fee schedule

Junction building permit fees

Fee type
Amount
01
Minimum permit fee
$50.00
02
Permit fee formula
Flat $50.00 fee for building permit application

Building permit fee is paid at the time of filing. Fee is refunded if the building permit application is denied. Plumbing permit fees are set by the plumbing inspector.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

Inspection hours
Monday through Thursday, 8:00 a.m. to 5:30 p.m.; Friday, 8:00 a.m. to 3:00 p.m.

Typical sequence: Submit written application and fee. City investigates for ordinance compliance. Permit is issued if proposal complies. City may inspect during construction for conformity with application and plans. Floodplain permit review includes verification that other required governmental permits have been obtained.

§ 06

Frequently asked

Common questions about Junction permits

01 Do I need a building permit in Junction, TX?
A building permit is required before constructing, reconstructing, renovating, or adding to any building or other structure within city limits. A floodplain development permit is required for development covered by the flood damage prevention ordinance. A plumbing permit is required before beginning plumbing installation or alteration work.
02 How much does a building permit cost in Junction, TX?
Building permit fees in Junction, TX are set by the local building department and vary by project type and valuation. The minimum permit fee is $50.00. Fees are calculated as: Flat $50.00 fee for building permit application.
03 How do I apply for a building permit in Junction, TX?
To apply for a building permit in Junction, TX, follow these steps: 1. Confirm the property is inside Junction city limits. 2. Determine whether the work triggers the city building-permit ordinance (construction, reconstruction, renovation, or addition to a building or structure). 3. Prepare the written application to the mayor on city forms, including legal description, street address, plans and specifications, estimated cost, building material, and location and distance to nearest property lines of each outside wall. 4. Pay the building permit fee of $50.00 at filing. 5. Wait for city investigation and decision by the mayor. 6. If the site is in a special flood hazard area, also submit a floodplain development permit application to the floodplain administrator. 7. Keep the work consistent with submitted plans; city may inspect and revoke or suspend permit if work materially deviates from approved application. 8. If permit is denied, suspended, or revoked, applicant may appeal to city council.
04 What work is exempt from building permits in Junction, TX?
Not all construction work requires a permit in Junction, TX. The following work is generally exempt: Repair only to an existing building or structure; Additions to existing construction that do not increase floor space by 25 square feet or more; Proposed new construction of any building requires a permit regardless of square footage. Note: Repair exemptions apply narrowly; additions and new construction generally require permits. Confirm edge cases with City Hall before proceeding. When in doubt, confirm with the local building department before starting work.
last verified April 2026 source City of Junction, Mayor's Office ↗ entry id permits/texas/kimble/junction

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Junction, Mayor's Office before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Kimble County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Kimble County jurisdictions →