jaspector
§ TX Gray County
City building permits

City of McLean

How to apply for a building permit in City of McLean, Texas. Permit authority, application steps, fees, and inspection requirements.

Avg processing
Not publicly specified
Last verified
April 2026
On this page 6
§ 01

Permit authority

City of McLean City Hall / City Secretary

Street address
PO Box 9, McLean, TX 79057
Coverage
All properties within the incorporated City of McLean.
§ 02

When a permit is required

Permit triggers and exempt work for McLean

No publicly posted McLean building permit ordinance, application form, fee schedule, or permit webpage describing a general building permit program was found. Because the public record is thin, confirm directly with the city before assuming work is permit-free.

Note: No public exempt-work list was found. Contact the city directly to clarify which work requires permits.

Required documents
  • No public checklist or application packet found. Contact the city directly to verify requirements.
Building code
No public building code adoption record was found. McLean does not participate in NFIP according to FEMA and TWDB records.
Permit validity
Not publicly specified
Owner-builder
Not publicly specified
Contractor requirements
No public local contractor registration or city contractor licensing requirement was found.
§ 03

Application process

Typical processing: Not publicly specified

  1. 01
    Confirm the parcel is inside McLean city limits.
  2. 02
    Contact City Hall at (806) 779-2481 before starting work to verify whether the city requires any permit, approval, utility review, flood-related review, or other authorization for the specific project.
  3. 03
    If the city confirms an approval is required, request the current form, document list, fee amount, and inspection process directly from the city because none of those items were publicly posted.
  4. 04
    Coordinate any separate state or utility approvals that may apply to the project, since McLean's public web presence does not publish a comprehensive development or building-permit program.
  5. 05
    Do not begin work until the city confirms whether approval is required and, if so, issues it.

Typical processing time: Not publicly specified

Source: City of McLean City Hall / City Secretary ↗

§ 04

Fee schedule

McLean building permit fees

Fee type
Amount
01
Minimum permit fee
No public minimum building permit fee found
02
Plan check fee
Not publicly specified
03
Permit fee formula
No public fee formula found
04
Trade permit fee
Not publicly specified
05
Reinspection fee
Not publicly specified
06
Penalty (no permit)
Not publicly specified

No public permit payment instructions found

§ 05

Required inspections

Scheduling and sequence

Inspection hours
No public permit or inspection office hours were found beyond the utility portal contact information

Typical sequence: No public city inspection sequence found

§ 06

Frequently asked

Common questions about McLean permits

01 Do I need a building permit in McLean, TX?
No publicly posted McLean building permit ordinance, application form, fee schedule, or permit webpage describing a general building permit program was found. Because the public record is thin, confirm directly with the city before assuming work is permit-free.
02 How much does a building permit cost in McLean, TX?
Building permit fees in McLean, TX are set by the local building department and vary by project type and valuation. The minimum permit fee is No public minimum building permit fee found. Fees are calculated as: No public fee formula found. Plan check fee: Not publicly specified.
03 How do I apply for a building permit in McLean, TX?
To apply for a building permit in McLean, TX, follow these steps: 1. Confirm the parcel is inside McLean city limits. 2. Contact City Hall at (806) 779-2481 before starting work to verify whether the city requires any permit, approval, utility review, flood-related review, or other authorization for the specific project. 3. If the city confirms an approval is required, request the current form, document list, fee amount, and inspection process directly from the city because none of those items were publicly posted. 4. Coordinate any separate state or utility approvals that may apply to the project, since McLean's public web presence does not publish a comprehensive development or building-permit program. 5. Do not begin work until the city confirms whether approval is required and, if so, issues it.
04 How long does it take to get a building permit in McLean, TX?
Building permit processing times in McLean, TX typically run Not publicly specified. Timelines can vary based on project complexity and current department workload.
last verified April 2026 source City of McLean City Hall / City Secretary ↗ entry id permits/texas/gray/mclean

Educational reference. Permit rules and fees change — confirm current requirements directly with City of McLean City Hall / City Secretary before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Gray County.

Same county, different permit office. Click for that jurisdiction's full guide.