When a permit is required
Permit triggers and exempt work for Little Elm
Building permits are required for new construction, additions, alterations, and repairs to buildings and structures in the Town of Little Elm.
- Completed permit application
- Construction plans
- Site plan
- Engineering specifications as applicable
- Building code
- 2018 construction code family with 2020 NEC (as shown in current public materials).
Application process
Typical processing: Varies based on permit type and completeness of submittal.
- 01 Review Building Safety Division requirements and adopted codes.
- 02 Prepare permit application and construction plans.
- 03 Create MyGov account or log in to existing account.
- 04 Submit permit application and required documents through MyGov.
- 05 Building Safety Division reviews application and plans.
- 06 Address any comments from the division.
- 07 Pay permit fees upon approval.
- 08 Obtain permit and schedule inspections through MyGov.
Typical processing time: Varies based on permit type and completeness of submittal.
Required inspections
Scheduling and sequence
Frequently asked
Common questions about Little Elm permits
01 Do I need a building permit in Little Elm, TX? ▸
02 How do I apply for a building permit in Little Elm, TX? ▸
03 How long does it take to get a building permit in Little Elm, TX? ▸
04 How do I schedule a building inspection in Little Elm, TX? ▸