How to apply for a building permit in City of Wallis, Texas. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Wallis / City Hall

Street address
6810 Guyler, Bldg B, Wallis, TX 77485
Coverage
Applies within the City of Wallis city limits. Verify parcel location if a tract is near the city boundary.
§ 02

When a permit is required

Permit triggers and exempt work for Wallis

The city requires building permits and instructs applicants to contact City Hall before starting a project. The city publishes forms for residential, commercial, utility, fire system, culvert, rental, and certificate of occupancy matters. Fence permits are required for fences 7 feet and over. A certificate of occupancy inspection is required whenever there is a change of use and/or ownership of an existing commercial building.

Fences below 7 feet are not in the listed permit category (fence permits are required for fences 7 feet and over)
  • Exempt Fences below 7 feet are not in the listed permit category (fence permits are required for fences 7 feet and over)

Note: Public permit page expressly states permits are required for fences 7 feet and over. No broader public exempt-work list was found.

Required documents
  • Varies by permit form
  • Separate forms for new residential, residential remodel/addition, commercial permits, contractor registration, fire systems, culverts, rentals, and certificate of occupancy
Building code
Ordinance No. 221 adopts 2015 IBC, 2015 IRC, 2015 IFC, 2015 IECC, 2015 IFGC, 2015 IMC, 2015 IPC, 2015 IPMC, and 2014 NEC, with local amendments.
Contractor requirements
Contractors must register with the city. The registration fee is $100.00 and is good for one year.
§ 03

Application process

Typical processing: Plan reviews can take a minimum of 5 days for residential and a minimum of 10 days for commercial.

  1. 01
    Contact City Hall before starting the project.
  2. 02
    Download the required permit form from the city permit page and complete contractor registration if applicable.
  3. 03
    Submit the application for third-party plan review and city processing.
  4. 04
    Allow for plan review timing published by the city.
  5. 05
    Pay permit and registration fees.
  6. 06
    Complete required third-party inspections and obtain any needed certificate of occupancy.

Typical processing time: Plan reviews can take a minimum of 5 days for residential and a minimum of 10 days for commercial.

Source: City of Wallis / City Hall ↗

§ 04

Fee schedule

Wallis building permit fees

Fee type
Amount
01
Plan check fee
Third-party plan review is required, but the public permit page does not clearly publish the fee amount.
02
Reinspection fee
No specific public Wallis reinspection fee sheet was found. If work starts before obtaining a permit, fees will be doubled.
03
Penalty (no permit)
Fees are doubled if work starts before obtaining a permit.

Contractor registration fee is $100.00 for one year. Other permit fees depend on the form and project type.

§ 05

Required inspections

Scheduling and sequence

How to schedule

Typical sequence: The city states a third party performs all plan reviews and inspections. Application, third-party plan review, permit issuance, required inspections, and certificate of occupancy where applicable.

Source: City of Wallis / City Hall ↗

§ 06

Frequently asked

Common questions about Wallis permits

01 Do I need a building permit in Wallis, TX?
The city requires building permits and instructs applicants to contact City Hall before starting a project. The city publishes forms for residential, commercial, utility, fire system, culvert, rental, and certificate of occupancy matters. Fence permits are required for fences 7 feet and over. A certificate of occupancy inspection is required whenever there is a change of use and/or ownership of an existing commercial building.
02 How do I apply for a building permit in Wallis, TX?
To apply for a building permit in Wallis, TX, follow these steps: 1. Contact City Hall before starting the project. 2. Download the required permit form from the city permit page and complete contractor registration if applicable. 3. Submit the application for third-party plan review and city processing. 4. Allow for plan review timing published by the city. 5. Pay permit and registration fees. 6. Complete required third-party inspections and obtain any needed certificate of occupancy.
03 How long does it take to get a building permit in Wallis, TX?
Building permit processing times in Wallis, TX typically run Plan reviews can take a minimum of 5 days for residential and a minimum of 10 days for commercial.. Timelines can vary based on project complexity and current department workload.
04 What work is exempt from building permits in Wallis, TX?
Not all construction work requires a permit in Wallis, TX. The following work is generally exempt: Fences below 7 feet are not in the listed permit category (fence permits are required for fences 7 feet and over). Note: Public permit page expressly states permits are required for fences 7 feet and over. No broader public exempt-work list was found. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Wallis, TX?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Wallis, TX via: City Hall.
last verified April 2026 source City of Wallis / City Hall ↗ entry id permits/texas/austin/wallis-city

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Wallis / City Hall before applying. Jaspector is not legal advice.