On this page 6
When a permit is required
Permit triggers and exempt work for Martin
The city states permits are required for new construction, additions, remodeling involving structural items, satellite dishes, enclosing a garage or carport, storage buildings, swimming pools, and covered decks.
- Exempt Not fully listed publicly.
- Exempt The city page implies some work is routed to the state residential system rather than city residential permitting.
- Not fully public, but the city page indicates permit forms and related documents are available; the permit packet should include project and contractor details.
- Building code
- City of Martin states it adopted the 2018 International Building Code, 2018 International Fire Code, 2018 International Gas Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Existing Building Code, 2018 International Solar Energy Provisions Code, 2018 International Swimming Pool Code, Standard Unsafe Building Abatement Code, and Standard Amusement Device Code. Source: https://www.cityofmartin.net/government/building-codes/
- Permit validity
- Not publicly posted on the city page.
- Owner-builder
- Not publicly posted.
- Contractor requirements
- The city permit application asks for contractor license number and expiration date. State contractor requirements may also apply by project type.
Application process
Typical processing: Not publicly posted.
- 01 Identify whether the work is commercial, city residential, or state residential inspection work.
- 02 For commercial permits, pick up or download the commercial building permit application from the City of Martin.
- 03 For state residential permits, register or log in to CORE and purchase the permit there.
- 04 Submit project and contractor information, and for city work provide the required permit paperwork.
- 05 Under city review, the permit is issued by Building Codes staff; under state residential work, the permit is issued through CORE and inspections are scheduled through the state.
- 06 Arrange inspections as required before covering or occupancy.
Typical processing time: Not publicly posted.
Source: City of Martin Building Codes / Building Inspector ↗
Fee schedule
Martin building permit fees
No public permit payment portal found on the city site.
Required inspections
Scheduling and sequence
- City inspections appear to be handled by Building Codes staff; state residential inspections are handled through CORE or by email to SFMO.permits-licensing@tn.gov. (phone)
- Inspection hours
- Not publicly posted.
- Time windows
- Not publicly posted.
Typical sequence: Not publicly posted.
Not publicly posted.
Frequently asked
Common questions about Martin permits
01 Do I need a building permit in Martin, TN? ▸
02 How much does a building permit cost in Martin, TN? ▸
03 How do I apply for a building permit in Martin, TN? ▸
04 How long does it take to get a building permit in Martin, TN? ▸
05 What work is exempt from building permits in Martin, TN? ▸
06 How do I schedule a building inspection in Martin, TN? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Martin Building Codes / Building Inspector before applying. Jaspector is not legal advice.