On this page 6
When a permit is required
Permit triggers and exempt work for Portland
Portland states it issues permits for new construction, remodels, demolition, swimming pools, plumbing, mechanical, fire protection, moving, fireworks stands, and use and occupancy permits.
Note: No public consolidated exemption list was located on the reviewed pages.
- Permit application
- Project details entered in GovWell
- Uploaded plans and supporting documents
- Project-type-specific forms from the Building Permit Applications page
- Building code
- Portland states it uses the 2018 International Codes.
- Permit validity
- Not clearly posted on the reviewed pages.
- Owner-builder
- Not clearly posted on the reviewed pages.
- Contractor requirements
- Not clearly consolidated on the reviewed pages; applicants should verify contractor registration and state licensing requirements directly with the department.
Application process
Typical processing: No general processing time estimate was publicly posted on the reviewed pages.
- 01 Create a GovWell account using email and mobile phone verification.
- 02 Log into the GovWell portal and start a new application.
- 03 Choose the permit type and enter project details.
- 04 Upload required documents in PDF, JPEG, PNG, or JPG format.
- 05 Submit the application and wait for confirmation by portal and email.
- 06 Track status in the My Projects dashboard and respond to correction requests by uploading additional documents.
- 07 Download the issued permit from the portal and proceed to inspections.
Typical processing time: No general processing time estimate was publicly posted on the reviewed pages.
Fee schedule
Portland building permit fees
All permits incur a $15 administrative fee. The reviewed public pages do not clearly summarize payment methods beyond the portal rollout.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Inspection Hotline 615-805-3080 (phone)
- IDT Plans inspection request link (online)
- Scheduling deadline
- Inspections must be called in before 3:00 PM to be on the next-day schedule. Calls after 3:00 PM are scheduled two business days out.
- Inspection hours
- Department office hours are Monday through Friday, 8:00 AM to 4:30 PM.
Typical sequence: Portland describes a standard process of plan review, permit issuance, and inspections, but does not publish a single consolidated inspection sequence on the main public page reviewed.
Frequently asked
Common questions about Portland permits
01 Do I need a building permit in Portland, TN? ▸
02 How much does a building permit cost in Portland, TN? ▸
03 How do I apply for a building permit in Portland, TN? ▸
04 How long does it take to get a building permit in Portland, TN? ▸
05 How do I schedule a building inspection in Portland, TN? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Portland Building Codes Department before applying. Jaspector is not legal advice.