On this page 6
When a permit is required
Permit triggers and exempt work for Selmer
Selmer code states that a building code is adopted and permits are issued under that code; electrical work also requires a permit unless it is minor repair not involving new wire, conduit, machinery, apparatus, or other electrical devices. The municipal code also adopts zoning rules and a building permit is required for regulated construction and alterations.
- Exempt Minor electrical repairs that do not involve new wire, conduit, machinery, apparatus, or other electrical devices generally requiring an electrician
- Exempt Gas appliance setting or connecting other than the specific permit-triggering items named in the gas code
- Exempt Repair of leaks in house gas piping
- Publicly visible forms page for building, flood plane, sign permit, zoning map, and municipal codes; the city code requires a building application and supporting information for permit review. For zoning actions, the ordinance requires a dimensional sketch or scale plan.
- Building code
- Selmer adopts the 2009 International Building Code and 2009 International Residential Code, with local modifications. Electrical, plumbing, gas, and energy codes are also adopted in Title 12.
- Permit validity
- Selmer code says the building permit becomes void six months from issuance unless substantial progress has been made.
- Owner-builder
- No Selmer-specific owner-builder rule was found on the public pages reviewed. Use Tennessee contractor licensing rules for projects above the state threshold.
- Contractor requirements
- Tennessee contractor licensing rules apply. For owner-builders, state guidance allows a property owner to construct one single residence every two years for personal use, not for resale, lease, or rent; if hired work exceeds $25,000, licensing rules apply.
Application process
Typical processing: Not publicly posted
- 01 Confirm zoning and code applicability with the Building Inspector / City Planning Office.
- 02 Prepare the building application and supporting site plan or sketch.
- 03 Submit the application to the city office for review.
- 04 Pay required permit fees after the application is reviewed.
- 05 Obtain the permit before starting regulated work.
- 06 Schedule required inspections through the city office during construction.
- 07 Receive final approval and any occupancy documentation required by the city.
Typical processing time: Not publicly posted
Source: Town of Selmer, Building Inspector / City Planning Office ↗
Fee schedule
Selmer building permit fees
Public pages do not identify an online payment portal for permits.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Through the Building Inspector / City Planning Office (phone)
- Inspection hours
- Office hours are Monday-Friday, 8:00 AM to 5:00 PM
- Time windows
- Office hours are Monday-Friday, 8:00 AM to 5:00 PM
Typical sequence: Selmer code and state practice indicate rough and final inspections for gas work, with building inspection stages controlled by the adopted code and local office
Gas code authorizes a return inspection fee after correction of defects
Frequently asked
Common questions about Selmer permits
01 Do I need a building permit in Selmer, TN? ▸
02 How much does a building permit cost in Selmer, TN? ▸
03 How do I apply for a building permit in Selmer, TN? ▸
04 How long does it take to get a building permit in Selmer, TN? ▸
05 What work is exempt from building permits in Selmer, TN? ▸
06 How do I schedule a building inspection in Selmer, TN? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Selmer, Building Inspector / City Planning Office before applying. Jaspector is not legal advice.