On this page 6
When a permit is required
Permit triggers and exempt work for Soddy-Daisy
The city states building, plumbing, electrical, gas, HVAC, and excavation permits may be purchased through City Hall. Its FAQ lists required permits for pools over two feet deep, retaining walls over four feet, and business signage, among other work.
- Exempt Cosmetic alterations to existing residences such as paint, wallpaper, and carpeting
- Exempt Alterations that do not exceed $1,000 and do not involve structural changes
- Permit form
- Printed signed permit if purchased by phone
- Building plans emailed to the inspectors when needed
- Engineered retaining wall drawing for walls over four feet
- Building code
- 2018 IBC, 2018 IRC, 2018 IPC, 2018 IMC, 2018 IFGC, 2018 IFC, 2018 ISPSC, 2018 IECC, 2017 NEC, ANSI 2017 accessibility code, and NFPA 101 2018
- Permit validity
- Not clearly posted on the public pages reviewed.
- Owner-builder
- Not clearly posted on the public pages reviewed.
- Contractor requirements
- The city states applicants must be licensed with the City of Chattanooga, Hamilton County, or the State of Tennessee to purchase permits.
Application process
Typical processing: Not clearly posted on the public pages reviewed.
- 01 Contact City Hall for the permit type needed.
- 02 Purchase the permit in person or over the phone.
- 03 If handled by phone, print the permit, sign it, and return it by email.
- 04 Email building plans directly to the city inspectors when plans are required.
- 05 Obtain permit issuance before starting work.
- 06 Call City Hall to schedule inspections through final approval.
Typical processing time: Not clearly posted on the public pages reviewed.
Fee schedule
Soddy-Daisy building permit fees
Permits may be purchased in person or over the phone; phone purchases require printing, signing, and returning the permit by email.
Required inspections
Scheduling and sequence
- Call City Hall at (423) 332-5323 (phone)
- Inspection hours
- Weekdays 8:00 a.m. to 4:00 p.m.
Typical sequence: The city posts a normal order list by trade and states each permit requires ongoing inspections with a final inspection at job completion.
Frequently asked
Common questions about Soddy-Daisy permits
01 Do I need a building permit in Soddy-Daisy, TN? ▸
02 How much does a building permit cost in Soddy-Daisy, TN? ▸
03 How do I apply for a building permit in Soddy-Daisy, TN? ▸
04 How long does it take to get a building permit in Soddy-Daisy, TN? ▸
05 What work is exempt from building permits in Soddy-Daisy, TN? ▸
06 How do I schedule a building inspection in Soddy-Daisy, TN? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Soddy-Daisy Building and Permits before applying. Jaspector is not legal advice.