On this page 6
When a permit is required
Permit triggers and exempt work for Milan
The public page points to residential and commercial permit applications. The residential application requires a copy of approved plans. The city also requires erosion control approval before footing inspection for projects that disturb soil.
- Exempt No comprehensive exemption list was published on the main permit page.
- Exempt The city posts an Affidavit of Exemption form.
- Copy of approved plans, project information, contractor Tennessee registration number, contractor insurance and state contractor license when permit is issued, and erosion control approval where applicable.
- Building code
- 2018 International Codes Series, except the Energy Code, effective February 12, 2021.
- Permit validity
- Not published on the main page. The commercial application includes permit field data and the city publishes inspection requirements.
- Owner-builder
- The residential form is an owner/applicant signature form, but no separate owner-builder policy was published.
- Contractor requirements
- Residential form states a copy of contractor insurance and state contractor license is required when permit is issued.
Application process
Typical processing: Not published
- 01 Confirm whether the project needs a residential or commercial permit.
- 02 Prepare the application and required supporting documents.
- 03 Submit the city form online or contact Building and Codes.
- 04 Provide approved plans with the application when requested.
- 05 Complete erosion control approval before footing inspection if soil disturbance is involved.
- 06 Receive permit issuance from the Building and Codes Department.
Typical processing time: Not published
Fee schedule
Milan building permit fees
The published fee sheet also lists moving fee of $100 and plumbing base fee of $25 plus $5 per additional fixture
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Contact Building and Codes at least 24 hours before required inspections (phone)
- Inspection hours
- Monday through Thursday 10:00 am to 12:00 pm or 2:00 pm to 4:00 pm; Friday 10:00 am to 12:00 pm or 2:00 pm to 3:00 pm
- Time windows
- Monday through Thursday 10:00 am to 12:00 pm or 2:00 pm to 4:00 pm; Friday 10:00 am to 12:00 pm or 2:00 pm to 3:00 pm
Typical sequence: Footing, underground plumbing, gas piping rough-in, framing, rough plumbing, final
The residential form says the owner/contractor must call for all necessary inspections and keep work uncovered until approved
Frequently asked
Common questions about Milan permits
01 Do I need a building permit in Milan, TN? ▸
02 How much does a building permit cost in Milan, TN? ▸
03 How do I apply for a building permit in Milan, TN? ▸
04 How long does it take to get a building permit in Milan, TN? ▸
05 What work is exempt from building permits in Milan, TN? ▸
06 How do I schedule a building inspection in Milan, TN? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Milan Building and Codes Department before applying. Jaspector is not legal advice.