When a permit is required
Permit triggers and exempt work for Cocke County
Cocke County states there is no county building permit or certificate of occupancy requirement for construction activities, but development, zoning, E-911 address, floodplain, and septic approvals still apply where triggered.
- Exempt The county does not publish a simple exempt-work list because its public page says no building permit is required for construction activities
- Exempt Floodplain, septic, and address-related work can still trigger county or state approvals
- Same county package described above for zoning and development routing.
- Building code
- No countywide construction building code adoption was identified on the county pages reviewed
- Permit validity
- Not clearly posted
- Owner-builder
- Affidavit of exemption is available if no contractor is used or if the owner is building the structure
- Contractor requirements
- Proof of contractor license and workers compensation insurance is required for the zoning application, unless exempted by affidavit
Application process
Typical processing: At least 10 working days before the relevant meeting for board review items; no general permit turnaround estimate was posted
- 01 Confirm ownership and gather the parcel map and location information.
- 02 Determine whether the project is in a flood zone and whether an elevation certificate will be required.
- 03 Obtain a development permit from the floodplain administrator if applicable.
- 04 Obtain or confirm the E-911 address assignment through the county process.
- 05 Submit the county zoning permit application with site plan, setbacks, contractor information, insurance, and any affidavit of exemption if owner-building.
- 06 Obtain septic approval from TDEC when applicable.
- 07 If the matter requires board review, submit at least 10 working days before the scheduled Planning Commission or Board of Zoning Appeals meeting.
- 08 Proceed only after all required county approvals are in place.
Typical processing time: At least 10 working days before the relevant meeting for board review items; no general permit turnaround estimate was posted
Fee schedule
Cocke County building permit fees
Development permits are issued at no cost; the planning commission page says there is currently no fee to be placed on the agenda
Required inspections
Scheduling and sequence
- Not clearly posted (phone)
- Inspection hours
- Zoning, floodplain, and E-911 offices are generally Monday through Friday, 8:00 a.m. to 4:00 p.m.
- Time windows
- Zoning, floodplain, and E-911 offices are generally Monday through Friday, 8:00 a.m. to 4:00 p.m.
Typical sequence: Development permit, address assignment, zoning permit, and floodplain or septic review before development starts
Not publicly posted
Frequently asked
Common questions about unincorporated Cocke County permits
01 Do I need a building permit in unincorporated Cocke County, TN? ▸
02 How much does a building permit cost in unincorporated Cocke County, TN? ▸
03 How do I apply for a building permit in unincorporated Cocke County, TN? ▸
04 How long does it take to get a building permit in unincorporated Cocke County, TN? ▸
05 What work is exempt from building permits in unincorporated Cocke County, TN? ▸
06 How do I schedule a building inspection in unincorporated Cocke County, TN? ▸