On this page 6
When a permit is required
Permit triggers and exempt work for Pegram
The town publishes permits, forms, and an application packet for building permits, pool permits, sign permits, excavation permits, and zoning-related applications. The planning packet states no building permit for construction or exterior repair/alteration of a building required by the regulations shall be issued until a site plan has been reviewed and approved by the planning commission.
- Exempt The public fee and zoning materials reviewed do not provide a clean standalone exemption list
- Exempt Thin data flag: exempt work may be defined in the town zoning and permit packet documents, but the public page text captured here does not fully enumerate it
- Town forms, and in some cases county receipts, plans, six copies for planning items, and any project-specific support documents
- Building code
- The public materials reviewed reference the town zoning ordinance and permit forms; the specific building code cycle was not clearly stated in the source text captured here
- Permit validity
- Site plans are valid for 18 months if construction has not begun
- Owner-builder
- A construction project over $25,000 must be pulled either by a licensed Tennessee contractor or by the homeowner
- Contractor requirements
- A contractor must have a state license and general liability insurance in the building permit file for projects over $25,000
Application process
Typical processing: Planning commission applications must be received at least 30 days before a meeting date; building permit review timing is not otherwise standardized on the public page
- 01 Confirm the project and gather the required town forms.
- 02 Obtain the needed receipts from the Cheatham County Building Department in Ashland City.
- 03 For planning commission or zoning matters, submit the required application and copies by the posted deadline.
- 04 Submit the town building permit packet or form during Town Hall hours.
- 05 Include contractor license and insurance if the project is over the threshold that requires a licensed contractor.
- 06 Pay the applicable town building permit fee and city facilities tax.
- 07 Schedule inspections with Town Hall.
Typical processing time: Planning commission applications must be received at least 30 days before a meeting date; building permit review timing is not otherwise standardized on the public page
Source: Town of Pegram, Building Inspector / Town Hall functions for building permits ↗
Fee schedule
Pegram building permit fees
Planning applications accept cash, check, or other noted payment types; the public fee page does not specify card acceptance
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Call Town Hall at (615) 646-0773 (phone)
- Inspection hours
- Town Hall hours are Monday-Friday 8:00 AM to 12:00 PM and 1:00 PM to 4:00 PM
- Time windows
- Town Hall hours are Monday-Friday 8:00 AM to 12:00 PM and 1:00 PM to 4:00 PM
Typical sequence: The public packet states inspections are part of the permit file process, and the planning packet refers to project site inspection charges and required approvals; a detailed step-by-step sequence was not fully published on the public page
The packet references project site inspection charges; no broad public reinspection policy text was found in the captured pages
Frequently asked
Common questions about Pegram permits
01 Do I need a building permit in Pegram, TN? ▸
02 How much does a building permit cost in Pegram, TN? ▸
03 How do I apply for a building permit in Pegram, TN? ▸
04 How long does it take to get a building permit in Pegram, TN? ▸
05 What work is exempt from building permits in Pegram, TN? ▸
06 How do I schedule a building inspection in Pegram, TN? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Pegram, Building Inspector / Town Hall functions for building permits before applying. Jaspector is not legal advice.