When a permit is required
Permit triggers and exempt work for Gassaway
Before soil disturbance for construction. The county code materials focus on new construction and additions over 30 square feet.
- Exempt Manufactured and modular homes are factory-inspected and do not require a residential building permit, though impact fees still apply.
- Exempt Ordinary renovations are not covered by the county residential code described in the FAQ.
- Exempt The county permit is not a grading or fill approval, floodplain determination, septic or sewer permit, electrical permit, or zoning approval.
- Map and parcel number, square footage, foundation type, estimated construction cost, and portal-required property data.
- Building code
- 2018 IRC and 2018 IECC per county FAQs.
- Permit validity
- Start within 180 days; expires on completion, at certificate of occupancy, or two years from issuance unless extended in writing.
- Owner-builder
- Owner may build one personal-use single residence every two years without a contractor license, subject to Tennessee limits on hired work.
- Contractor requirements
- Tennessee contractor licensing rules apply; verify at verify.tn.gov.
Application process
Typical processing: Inspection turnaround is within three working days of request, or one working day for footer inspections.
- 01 Confirm the parcel, zoning, and floodplain status for the Gassaway site.
- 02 Complete the county building permit application.
- 03 Submit online or in person at the county planning office.
- 04 Pay permit and impact fees.
- 05 Obtain permit approval.
- 06 Start work within 180 days.
- 07 Complete inspections and final approval before occupancy.
Typical processing time: Inspection turnaround is within three working days of request, or one working day for footer inspections.
Fee schedule
Gassaway building permit fees
E-check or credit card accepted. Credit card fee is 3.5%. AFT and ZCF apply at $0.90 and $0.95 per square foot of heated space respectively.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Permit holder schedules with the Planning Department or through the online portal. (online)
- Inspection hours
- No public window or office-hours schedule for inspections was found. Timing standard is three working days after request, one working day for footer inspections.
- Time windows
- No public window or office-hours schedule for inspections was found. Timing standard is three working days after request, one working day for footer inspections.
Typical sequence: Foundation, rough-in/framing, plumbing and mechanical systems, and final inspection.
One free reinspection; later reinspection charges are $100 each.
Frequently asked
Common questions about Gassaway permits
01 Do I need a building permit in Gassaway, TN? ▸
02 How much does a building permit cost in Gassaway, TN? ▸
03 How do I apply for a building permit in Gassaway, TN? ▸
04 How long does it take to get a building permit in Gassaway, TN? ▸
05 What work is exempt from building permits in Gassaway, TN? ▸
06 How do I schedule a building inspection in Gassaway, TN? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Cannon County Planning Department before applying. Jaspector is not legal advice.