How to apply for a building permit in Shelbyville, Tennessee. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Shelbyville Building & Codes Department

Street address
100 North Cannon Boulevard, Shelbyville, TN 37160
Coverage
City of Shelbyville permits and code enforcement for property inside the city limits.
§ 02

When a permit is required

Permit triggers and exempt work for Shelbyville

Shelbyville states permits are required for construction, enlargement, alteration, repair, moving, demolition, occupancy changes, pools, decks, arbors, storage buildings, and regulated electrical, gas, mechanical, or plumbing work

Shelbyville publishes FAQs, but the public page does not provide a complete exempt-work list in the scraped text
Agricultural and unrelated special cases should be confirmed directly with the department
  • Exempt Shelbyville publishes FAQs, but the public page does not provide a complete exempt-work list in the scraped text
  • Exempt Agricultural and unrelated special cases should be confirmed directly with the department
Required documents
  • Permit application; construction documents; at least two sets of plans; additional professional plans when required; project details and any applicable trade or related documents
Building code
The department references the 2018 International Codes and publishes adopted code resolutions
Permit validity
Not clearly stated on the public department page
Owner-builder
Not clearly stated on the public page
Contractor requirements
The city application and checklist indicate a contractor license and proof of workers compensation coverage are required when using a contractor
§ 03

Application process

Typical processing: Many permits can be approved and issued the same day; some require a few days of review

  1. 01
    Call the Building & Codes office to confirm whether the project needs a permit.
  2. 02
    Complete the permit application and gather construction documents.
  3. 03
    Submit the application and required sets of plans to the office.
  4. 04
    Staff reviews the project, and some permits may require a site inspection before approval.
  5. 05
    Pay applicable fees and receive the issued permit.

Typical processing time: Many permits can be approved and issued the same day; some require a few days of review

Source: Shelbyville Building & Codes Department ↗

§ 04

Fee schedule

Shelbyville building permit fees

Fee type
Amount
01
Minimum permit fee
Not extracted from the public schedule in the time available
02
Plan check fee
Not clearly published on the department page
03
Permit fee formula
Fee schedule based on permit type and valuation, with separate line items for different work categories
04
Reinspection fee
A fine schedule is published, but the public page text available here did not expose the full values

Public page does not describe online payment for permits

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Call the office; the public page does not show an online inspection scheduler (online)
Inspection hours
Office hours are 8AM to 4PM Monday through Friday
Time windows
Office hours are 8AM to 4PM Monday through Friday

Typical sequence: Application review, possible site inspection, fee payment, then permit issuance

Not clearly published on the public page

§ 06

Frequently asked

Common questions about Shelbyville permits

01 Do I need a building permit in Shelbyville, TN?
Shelbyville states permits are required for construction, enlargement, alteration, repair, moving, demolition, occupancy changes, pools, decks, arbors, storage buildings, and regulated electrical, gas, mechanical, or plumbing work
02 How much does a building permit cost in Shelbyville, TN?
Building permit fees in Shelbyville, TN are set by the local building department and vary by project type and valuation. The minimum permit fee is Not extracted from the public schedule in the time available. Fees are calculated as: Fee schedule based on permit type and valuation, with separate line items for different work categories. Plan check fee: Not clearly published on the department page.
03 How do I apply for a building permit in Shelbyville, TN?
To apply for a building permit in Shelbyville, TN, follow these steps: 1. Call the Building & Codes office to confirm whether the project needs a permit. 2. Complete the permit application and gather construction documents. 3. Submit the application and required sets of plans to the office. 4. Staff reviews the project, and some permits may require a site inspection before approval. 5. Pay applicable fees and receive the issued permit.
04 How long does it take to get a building permit in Shelbyville, TN?
Building permit processing times in Shelbyville, TN typically run Many permits can be approved and issued the same day; some require a few days of review. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Shelbyville, TN?
Not all construction work requires a permit in Shelbyville, TN. The following work is generally exempt: Shelbyville publishes FAQs, but the public page does not provide a complete exempt-work list in the scraped text; Agricultural and unrelated special cases should be confirmed directly with the department. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Shelbyville, TN?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Shelbyville, TN via: Call the office; the public page does not show an online inspection scheduler.
last verified April 2026 source Shelbyville Building & Codes Department ↗ entry id permits/tennessee/bedford/shelbyville

Educational reference. Permit rules and fees change — confirm current requirements directly with Shelbyville Building & Codes Department before applying. Jaspector is not legal advice.