jaspector
§ SD Union County
County building permits

Unincorporated Union County

How to apply for a building permit in unincorporated Union County, South Dakota. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Union County Planning and Zoning Department

Street address
209 E. Main Street, Suite 100, Elk Point, SD 57025
Coverage
All unincorporated Union County land. Building permit administration for unincorporated areas is handled by Union County Planning and Zoning Department.
Online portal
Union County Planning and Zoning Department
In-person / Phone / Appointment
§ 02

When a permit is required

Permit triggers and exempt work for Union County

A construction permit is required for any new structure or addition in unincorporated Union County. This includes buildings, garages, sheds, and other structures.

Note: Specific exempt categories are not publicly enumerated. Contact Union County Planning and Zoning at 605-356-3354 to determine permit necessity for any project.

Required documents
  • Completed Building Permit Application
  • Site plans showing lot lines and measurements
  • Drawings (may be professional or hand-drawn, must clearly show dimensions and lot location)
  • Proof of property ownership or authorization
Building code
South Dakota law (SDCL Chapter 11-10) requires compliance with the 2021 International Building Code (IBC) if a local unit adopts building standards. Confirm specific code adoption status with Planning and Zoning office.
Permit validity
Permit becomes invalid if work is not commenced within six months. Work must be completed within one year of issuance.
Contractor requirements
South Dakota contractor's excise tax license required for all contractors. Electricians and plumbers must hold state-issued licenses.

Source: Union County Planning and Zoning Department ↗

§ 03

Application process

Typical processing: Not publicly stated; contact department for current estimate

  1. 01
    Contact Union County Planning and Zoning Department by phone (605-356-3354) or visit in person at 209 E. Main Street, Suite 100, Elk Point, SD 57025.
  2. 02
    Complete the Building Permit Application form.
  3. 03
    Submit application with site plans showing lot lines and measurements, and drawings (professional or hand-drawn, must clearly show dimensions and lot location).
  4. 04
    Provide proof of property ownership or authorization.
  5. 05
    County Planning and Zoning reviews for zoning compliance with the 2008 Revised Zoning Ordinance.
  6. 06
    Pay permit fees (contact office for current fee schedule).
  7. 07
    Receive issued permit; post on site before construction begins.
  8. 08
    Request inspections as required by permit conditions.

Typical processing time: Not publicly stated; contact department for current estimate

Source: Union County Planning and Zoning Department ↗

§ 04

Fee schedule

Union County building permit fees

Fee type
Amount
01
Permit fee formula
Not publicly listed; contact Union County Planning and Zoning at 605-356-3354 for current fee schedule

Contact department for payment methods and fee schedule. Payment likely made in person at 209 E. Main Street, Suite 100, Elk Point.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • 605-356-3354 (phone)
Scheduling deadline
Not publicly stated; contact department
Inspection hours
Not publicly detailed; contact department
Time windows
Not publicly detailed; contact department

Typical sequence: Not publicly detailed; contact department

Source: Union County Planning and Zoning Department ↗

§ 06

Frequently asked

Common questions about unincorporated Union County permits

01 Do I need a building permit in unincorporated Union County, SD?
A construction permit is required for any new structure or addition in unincorporated Union County. This includes buildings, garages, sheds, and other structures.
02 How much does a building permit cost in unincorporated Union County, SD?
Building permit fees in unincorporated Union County, SD are set by the local building department and vary by project type and valuation. Fees are calculated as: Not publicly listed; contact Union County Planning and Zoning at 605-356-3354 for current fee schedule.
03 How do I apply for a building permit in unincorporated Union County, SD?
To apply for a building permit in unincorporated Union County, SD, follow these steps: 1. Contact Union County Planning and Zoning Department by phone (605-356-3354) or visit in person at 209 E. Main Street, Suite 100, Elk Point, SD 57025. 2. Complete the Building Permit Application form. 3. Submit application with site plans showing lot lines and measurements, and drawings (professional or hand-drawn, must clearly show dimensions and lot location). 4. Provide proof of property ownership or authorization. 5. County Planning and Zoning reviews for zoning compliance with the 2008 Revised Zoning Ordinance. 6. Pay permit fees (contact office for current fee schedule). 7. Receive issued permit; post on site before construction begins. 8. Request inspections as required by permit conditions.
04 How long does it take to get a building permit in unincorporated Union County, SD?
Building permit processing times in unincorporated Union County, SD typically run Not publicly stated; contact department for current estimate. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in unincorporated Union County, SD?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in unincorporated Union County, SD via: 605-356-3354. Not publicly stated; contact department.
last verified April 2026 source Union County Planning and Zoning Department ↗ entry id permits/south-dakota/union/union-county

Educational reference. Permit rules and fees change — confirm current requirements directly with Union County Planning and Zoning Department before applying. Jaspector is not legal advice.